Basic Burndown Chart
Basic Burndown Chart
Basic Burndown Chart
Updated on 19-Dec-2017
50
45
40
35
30
25
20
15
10
0
Day 5 Day 4
Commentary: At the end of Day 5 the project was ahead of the plan (the green line is
below the dashed orange line)
At the end of Day 2 it was behind the plan (the green line is above the dashed orange
line)
From Day 1 and onwwards it is ahead of the plan
Actual Hours
Day 4 Day 3 Day 2 Day 1 Status
5 0 1 1 On Track
3 0 2 0 On Track
1 0 0.5 0 On Track
1.5 0 3 1.5 On Track
3 0 1 1 On Track
1 0 1 1 On Track
1 0 2 2.5 On Track
0 0 1.5 0 On Track
27 18 9 0
19 19 7 0
he dashed orange
Comments
Day 1