Preparation:
20 If the transformer is connected to QM, trip the QM by shunting the trip circuit of transformer DGPT.
Isolate power from both sides by proper lock out and ensure there is no power, then discharge before touching the
30
connections.
Tasks:
40 Clean the exterior and check for leaks in body and fins.
90 Cooling oil test to be performed including Dielectric Strength Test,Water Content Test and Dissolved Gas Analysis.
110 Check and record operating temperature for any unusual rise.
140 Fill proper forms including the S/S Equipment History Card & Transformer Checking Form.
Monthly PPM of Transformer (Oil Type)
Task ID Description Status Findings
10 Observe all safety precautions.
Ensure that a duly permit to work is obtained. Verify that the necessary warning signs/ marks e.g.
20 ”Danger”, "High VoItage","EIectricity" etc. are available on the Distribution Transformer and
readable. Report deficiencies
inspect visually the oil level gauge on the Distribution Transformer for any decrease in oil level.
30
Report deficiencies
lnspect visually the oil temperature gauge on the Transformer for any unusual rise in the temp.
40
Report deficiencies
lnspect visually the body of the Transformer (particularly the radiator fins) for any signs of oil
50
leakage. Report deficiencies
Inspect visually the LV and MV bushings and insulators for signs of any cracks/breaks and base
60
connections. Report any damages.
80 Inspect physically for any unusual noise, vibration and overheating. Report deficiencies.
90 Verify that the ‘Asset Identification Tag / Marking‘ is available and readable. Rectify as needed