INSTALLATION
Getting started
Important Notes
D. Update the Wallbox charger with the latest software version before
installing the energy meter. Refer to the instructions for updating the
charger on the Wallbox Academy page for more information.
E. Ensure that the charger is powered off and its cover is removed
before connecting the energy meter. Close the charger properly after
the installation.
F. After installing the charger, connect the energy meter before closing
your charger. In case the energy meter is to be connected to a
previously installed charger, open it to connect the energy meter.
4
INSTALLATION
Getting started
General Characteristics (Pulsar Plus, Commander 2,
Copper SB and Quasar)
Dynamic
Power Eco-Smart V2H Power Power
Boost Sharing Sharing
Primary Chargers 1 1 1 1 1
Communication protocol
between the Primary Modbus Modbus Modbus
-
Modbus
Charger and the Energy RTU RTU RTU RTU
Meter
Terminating Chargers 1 1 1 2 2
Installation main Installation main Installation main Installation main Installation main
Configurable installation switch rated switch rated switch rated switch rated switch rated
maximum current current (MCB) current (MCB) current (MCB) current (MCB) current (MCB)
Super admin or Super admin or Super admin or Super admin or Super admin or
admin account admin account admin account admin account admin account
myWallbox and basic and basic and basic and basic and standard
subscription subscription subscription subscription subscription
Compatibility Table
Dynamic
Meters Power Boost Eco-Smart V2H Power Sharing
EM340
EM112
SPM1-100-AC
EM330 CTA 5X 250 A 5A
EM330 CTA 6X 400 A 5A
EM330 CTD-6S 600 5A
N1CT
PRO2 MOD
PRO380 MOD
5
INSTALLATION WITH PULSAR PLUS
Power Boost and Eco-Smart
Tools
A B C D
E F
Refer to the Pulsar Plus Installation Guide to know more about the tools to install
the charger.
6
INSTALLATION WITH PULSAR PLUS
Power Boost and Eco-Smart
Place the energy meter after the mains supply and before the fuse box.
C. Main Switch
D. Fuse Box
E. Energy Meter
F. Communication
G. RCDs+MCBs
7
INSTALLATION WITH PULSAR PLUS
Power Boost and Eco-Smart
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
8
INSTALLATION WITH PULSAR PLUS
Power Boost and Eco-Smart
Pulsar Plus Installation Guide
Install the charger following the instructions in the Pulsar Plus Installation Guide.
Important
Ensure not to close the cover of the charger.
3.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
4. Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
It is mandatory to use an STP class 5E cable. Employ only 1 wire
of each twisted pair and keep in mind that the communication
wiring must not be more than 500m long.
Important
Insert only one cable for each grommet.
9
INSTALLATION WITH PULSAR PLUS
Power Boost and Eco-Smart
9 0
EM 112 EM 340
1
7 8
2 3
6
4 5
D+ D+
T 3 GND D- T 7
GND D-
A- 5 A- 9
B+ 4 B+ 8
GND 6 GND 10
EM 330 N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A Clamp
L
D+ L
1 D+
9 A + 21
Current 8 T 10
GND D- 2 D-
Direction K K B - 20
L
7 A- 12 GND 24
GND
6 B+ 11 12V 23
12V
K
L
5 GND 13
K
4
D+
Voltage + 1
12V D-
Voltage - 2
GND A + 10
D+ A + 22
D+
RS485 - 3 B - 11
D- B - 23
D-
RS485 + 4 12
Power 5 13
Power + 6 18
19
20
21
Important
Remember to check the Compatibility Table of each meter.
10
INSTALLATION WITH PULSAR PLUS
Power Boost and Eco-Smart
Terminating resistance activation and current selector configuration
9 0
1
7 8
2 3
6
4 5
9 0
1 2 3
7 8
6
4 5
NT
RS485
3. See the matrix below. This value must be the lower out of the main switch
rated current MCB (not the RCD) and the contracted tariff.
POSITION 0 1 2 3 4 5 6 7 8 9
CURRENT (A) R 6 10 13 16 20 25 32 R R
4. Close the cover of the charger following the instructions in the charger’s
Installation Guide.
11
INSTALLATION WITH PULSAR PLUS
Power Sharing
Tools
A B C D
E F G
Refer to the Pulsar Plus Installation Guide to know more about the tools to install
the charger.
12
INSTALLATION WITH PULSAR PLUS
Power Sharing
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
Important
Ensure not to close the cover of the charger.
13
INSTALLATION WITH PULSAR PLUS
Power Sharing
Wiring the system
3. Check the position of CAN - L and CAN - H indicated above the connector.
Remember: the sequence in the connector can be different depending
on each product.
4. Once located the connector, start cabling the primary charger (the
first of the chain). Use a UTP 5E cable (a pair), then, insert one of
the cables in CAN-L and the other in CAN-H. After, connect the
other chargers of the chain following the scheme below. As you may
notice, all the chargers have CAN-L and a CAN-H inputs and outputs,
except for the first and the last ones.
CAN-L CAN-H
T NT NT T
Important
• Make sure to connect each CAN-L to the respective CAN-L
connector of all the chargers. Do the same for CAN-H.
• Power sharing works up to 25 chargers for each installation. Among
them, one is primary and 24 are secondary. The maximum distance
the communication wiring can reach is 250m.
CAN-L CAN-H
CAN-L
CAN-H
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
14
INSTALLATION WITH PULSAR PLUS
Power Sharing
Terminating settings
1. Once the cabling is completed, you need to activate the termination resistors.
The first and the last charger will always be terminating (T) with non terminating
(NT) chargers between them.
T NT NT NT T
9 0
1
7 8
2 3
6
4 5
NT
CAN BUS
9 0
1 2 3
7 8
6
4 5
15
INSTALLATION WITH PULSAR PLUS
Power Sharing
2. Once the termination resistors are set up, place the current selector of
each charger following the information. The first charger of the chain is the
primary charger, the others are secondary.
POSITION 0 1 2 3 4 5 6 7 8 9
9 0
1
7 8
2 3
6
4 5
60 Ω
4. Close the cover of your charger by following the instructions in the respective
Installation Guide.
16
INSTALLATION WITH PULSAR PLUS
Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
17
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
Tools
A B C D
E F G H
Connecting cable between Cutter Connecting cable between Two pole lever
meter and charger charger and charger connectors
(STP Class 5E (UTP CAT 5E (for small
500m Max Length) 250m Max Length) communication
wires)
Refer to the Pulsar Plus Installation Guide to know more about the tools to install
the charger.
18
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
19
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
Pulsar Plus Installation Guide
Install the charger following the instructions in the Pulsar Plus Installation Guide.
Important
Ensure not to close the cover of the charger.
4. Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
It is mandatory to use an STP class 5E cable. Employ only 1 wire
of each twisted pair and keep in mind that the communication
wiring must not be more than 500m long.
20
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
9 0
EM 112 EM 340
1
7 8
2 3
6
4 5
D+ D+
T 3 GND D- T 7
GND D-
A- 5 A- 9
B+ 4 B+ 8
GND 6 GND 10
EM 330 N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A Clamp
L
D+ L
1 D+
9 A + 21
Current 8 T 10
GND D- 2 D-
Direction K K B - 20
L
7 A- 12 GND 24
GND
6 B+ 11 12V 23
12V
K
L
5 GND 13
K
4
D+
Voltage + 1
12V D-
Voltage - 2
GND A + 10
D+ A + 22
D+
RS485 - 3 B - 11
D- B - 23
D-
RS485 + 4 12
Power 5 13
Power + 6 18
19
20
21
Important
Remember to check the Compatibility Table of each meter.
21
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
Wiring the system
3. Once located the connector, start cabling the primary charger (the
first of the chain). Use a UTP 5E cable (a pair), then, insert one of
the cables in CAN-L and the other in CAN-H. After, connect the
other chargers of the chain following the scheme below. As you may
notice, all the chargers have CAN-L and a CAN-H inputs and outputs,
except for the first and the last ones.
CAN-L CAN-H
T NT NT T
Important
• Make sure to connect each CAN-L to the respective CAN-L
connector of all the chargers. Do the same for CAN-H.
• Power sharing works up to 25 chargers for each installation.
Among them, one is primary and 24 are secondary. The
maximum distance the communication wiring can reach is
250m.
CAN-L CAN-H
CAN-L
CAN-H
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
22
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
Terminating settings
1. Once the cabling is complete, you need to activate the terminating resistors. First
set up RS485 into T only for the charger that is connected into meter. Then set
up the CAN BUS, the first and the last charger will always be terminating (T) with
non terminating (NT) chargers between them.
T NT NT NT T
9 0
1
7 8
2 3
6
4 5
NT
RS485
NT
CAN BUS
9 0
1 2 3
7 8
6
4 5
23
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
2. Once the termination resistors are set up, place the current selector of
each charger following the information. The first charger of the chain is the
primary charger, the others are secondary.
POSITION 0 1 2 3 4 5 6 7 8 9
9 0
1
7 8
2 3
6
4 5
60 Ω
4. Close the cover of your charger by following the instructions in the respective
Installation Guide.
24
INSTALLATION WITH PULSAR PLUS
Dynamic Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Dynamic Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
Once you finish the extension of the existing installation, continue with steps on the
next page for setting up the chargers.
25
INSTALLATION WITH COMMANDER 2
Power Boost and Eco-Smart
Tools
A B C D
E F
Refer to the Commander 2 Installation Guide to know more about the tools to install
the charger.
26
INSTALLATION WITH COMMANDER 2
Power Boost and Eco-Smart
Place the energy meter after the mains supply and before the fuse box.
C. Main Switch
D. Fuse Box
E. Energy Meter
F. Communication
G. RCDs+MCBs
27
INSTALLATION WITH COMMANDER 2
Power Boost and Eco-Smart
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
28
INSTALLATION WITH COMMANDER 2
Power Boost and Eco-Smart
Commander 2 Installation
Install the device following the instructions in the Commander 2 Installation Guide.
Important
Ensure not to close the cover
of the charger.
3.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
4. Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
It is mandatory to use an STP class 5E cable. Employ only 1 wire
of each twisted pair and keep in mind that the communication
wiring must not be more than 500m long.
Important
Insert only one cable for each grommet.
29
INSTALLATION WITH COMMANDER 2
Power Boost and Eco-Smart
EM 112 EM 340
D+ D+
T 3 GND D- T 7
GND D-
A- 5 A- 9
B+ 4 B+ 8
GND 6 GND 10
EM 330 N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A Clamp
L
D+ L
1 D+
9 A + 21
Current 8 T 10
GND D- 2 D-
Direction K K B - 20
L
7 A- 12 GND 24
GND
6 B+ 11 12V 23
12V
K
L
5 GND 13
K
4
D+
Voltage + 1
12V D-
Voltage - 2
GND A + 10
D+ A + 22
D+
RS485 - 3 B - 11
D- B - 23
D-
RS485 + 4 12
Power 5 13
Power + 6 18
19
20
21
Important
Remember to check the Compatibility Table of each meter.
30
INSTALLATION WITH COMMANDER 2
Power Boost and Eco-Smart
Terminating resistance activation and current selector configuration
2.
Put the rotary switch into a position between 1 and 7, depending
on the maximum current that can be supplied from the charging network.
9 0
1 2 3
7 8
6
4 5
NT
T
RS485
3.
See the matrix below. This value must be the lower out of the main switch
rated current MCB (not the RCD) and the contracted rate.
POSITION 0 1 2 3 4 5 6 7 8 9
CURRENT (A) R 6 10 13 16 20 25 32 R R
4.
Close the cover of the charger following the instructions in the
Installation Guide.
31
INSTALLATION WITH COMMANDER 2
Power Sharing
Tools
A B C D
E F G
Refer to the Commander 2 Installation Guide to know more about the tools to install
the charger.
32
INSTALLATION WITH COMMANDER 2
Power Sharing
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
Commander 2 Installation
Install the charger following the instructions in the Commander 2 Installation Guide.
Important
Ensure not to close the cover of the charger.
33
INSTALLATION WITH COMMANDER 2
Power Sharing
Wiring the system
3. Check the position of CAN - L and CAN - H indicated above the connector.
Remember: the sequence in the connector can be different depending
on each product.
4. Once located the connector, start cabling the primary charger (the
first of the chain). Use a UTP 5E cable (a pair), then, insert one of
the cables in CAN-L and the other in CAN-H. After, connect the
other chargers of the chain following the scheme below. As you may
notice, all the chargers have CAN-L and a CAN-H inputs and outputs,
except for the first and the last ones.
CAN-L CAN-H
T NT NT T
Important
• Make sure to connect each CAN-L to the respective CAN-L
connector of all the chargers. Do the same for CAN-H.
• Power sharing works up to 25 chargers for each installation. Among
them, one is primary and 24 are secondary. The maximum distance
the communication wiring can reach is 250m.
CAN-L CAN-H
CAN-L
CAN-H
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
34
INSTALLATION WITH COMMANDER 2
Power Sharing
Terminating settings
1. Once the cabling is completed, you need to activate the termination resistors.
The first and the last charger will always be terminating (T) with non terminating
(NT) chargers between them.
T NT NT NT T
NT
CAN BUS
9 0
1 2 3
7 8
6
4 5
35
INSTALLATION WITH COMMANDER 2
Power Sharing
2. Once the termination resistors are set up, place the current selector of
each charger following the information. The first charger of the chain is the
primary charger, the others are secondary.
POSITION 0 1 2 3 4 5 6 7 8 9
60 Ω
4. Close the cover of your charger by following the instructions in the respective
Installation Guide.
36
INSTALLATION WITH COMMANDER 2
Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
37
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
Tools
A B C D
E F G H
Connecting cable between Cutter Connecting cable between Two pole lever
charger and meter charger and charger connectors
(STP Class 5E (UTP CAT 5E (for small
500m Max Length) 250m Max Length) communication
wires)
Refer to the Commander 2 Installation Guide to know more about the tools to install
the charger.
38
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
39
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
Commander 2 Installation
Install the device following the instructions in the Commander 2 Installation Guide.
Important
Ensure not to close the cover of the charger.
2.
Insert through the grommet the two communication wires, one
for meter communication and the other one for
communication between chargers.
3.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
4.
Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
It is mandatory to use an STP class 5E cable. Employ only 1 wire
of each twisted pair and keep in mind that the communication
wiring must not be more than 500m long.
Important
Insert only one cable for each grommet.
40
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
EM 112 EM 340
D+ D+
T 3 GND D- T 7
GND D-
A- 5 A- 9
B+ 4 B+ 8
GND 6 GND 10
EM 330 N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A Clamp
D+
Current L
9 L
1 D+
Direction GND D- A + 21
K
8 T 10
K
2
B - 20
D-
L
7 A- 12
GND 24
GND
K
6 B+ 11
12V 23
12V
L
5 GND 13
K
4
D+
Voltage + 1
12V D-
Voltage - 2
GND A + 10
D+ A + 22
D+
RS485 - 3 B - 11
D- B - 23
D-
RS485 + 4 12
Power 5 13
Power + 6 18
19
20
21
41
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
Wiring the system
3. Once located the connector, start cabling the primary charger (the
first of the chain). Use a UTP 5E cable (a pair), then, insert one of
the cables in CAN-L and the other in CAN-H. After, connect the
other chargers of the chain following the scheme below. As you may
notice, all the chargers have CAN-L and a CAN-H inputs and outputs,
except for the first and the last ones.
CAN-L CAN-H
T NT NT T
Important
• Make sure to connect each CAN-L to the respective CAN-L
connector of all the chargers. Do the same for CAN-H.
• Power sharing works up to 25 chargers for each installation.
Among them, one is primary and 24 are secondary. The
maximum distance the communication wiring can reach is
250m.
CAN-L CAN-H
CAN-L
CAN-H
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
42
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
Terminating settings
1. Once the cabling is complete, you need to activate the terminating resistors. First
set up RS485 into T only for the charger that is connected into meter. Then set
up the CAN BUS, the first and the last charger will always be terminating (T) with
non terminating (NT) chargers between them.
T NT NT NT T
NT
CAN BUS
NT
RS485
9 0
1 2 3
7 8
6
4 5
43
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
2. Once the termination resistors are set up, place the current selector of
each charger following the information. The first charger of the chain is the
primary charger, the others are secondary.
POSITION 0 1 2 3 4 5 6 7 8 9
60 Ω
4. Close the cover of your charger by following the instructions in the respective
Installation Guide.
44
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Dynamic Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
Once you finish the extension of the existing installation, continue with steps on the
next page for setting up the chargers.
45
INSTALLATION WITH COPPER SB
Power Boost and Eco-Smart
Tools
A B C D
E F
Refer to the Copper SB Installation Guide to know more about the tools to install
the charger.
46
INSTALLATION WITH COPPER SB
Power Boost and Eco-Smart
Place the energy meter after the mains supply and before the fuse box.
C. Main Switch
D. Fuse Box
E. Energy Meter
F. Communication
G. RCDs+MCBs
47
INSTALLATION WITH COPPER SB
Power Boost and Eco-Smart
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
48
INSTALLATION WITH COPPER SB
Power Boost and Eco-Smart
Copper SB Installation
Install the device following the instructions in the Copper SB Installation Guide.
Important
Ensure not to close the cover of the charger.
3.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
4. Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
It is mandatory to use an STP class 5E cable. Employ only 1 wire
of each twisted pair and keep in mind that the communication
wiring must not be more than 500m long.
Important
Insert only one cable for each grommet.
49
INSTALLATION WITH COPPER SB
Power Boost and Eco-Smart
EM 112 EM 340
D+ D+
T 3 GND D- T 7
GND D-
A- 5 A- 9
B+ 4 B+ 8
GND 6 GND 10
EM 330
N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A
L
D+ Clamp
9
8 T 10
GND D- L
1 D+
K A + 21
Current L 2 D-
7 A- 12 K B - 20
Direction GND
K
6 B+ 11 GND 24
L
GND 13 12V 23
12V
5
K
4
D+
Voltage + 1
12V D-
Voltage - 2
GND A + 10
D+ A + 22
D+
RS485 - 3 B - 11
D- B - 23
D-
RS485 + 4 12
Power 5 13
Power + 6 18
19
20
21
Important
Remember to check the Compatibility Table of each meter.
50
INSTALLATION WITH COPPER SB
Power Boost and Eco-Smart
Terminating resistance activation and current selector configuration
9 0
1 2 3
7 8
6
4 5
NT
RS485
3. See the matrix below. This value must be the lower out of the main
switch rated current MCB (not the RCD) and the contract tariff.
POSITION 0 1 2 3 4 5 6 7 8 9
CURRENT (A) R 6 10 13 16 20 25 32 R R
51
INSTALLATION WITH COPPER SB
Power Sharing
Tools
A B C D
E F G
Refer to the Copper SB Installation Guide to know more about the tools to install
the charger.
52
INSTALLATION WITH COPPER SB
Power Sharing
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
1. Open the cover of the charger 2. Remove the plastic knock-out
by following the instructions in at the bottom of the charger using
Copper SB Installation Guide. an M12 drill bit.
Copper SB Installation
Install the charger following the instructions in the Copper SB Installation Guide.
Important
Ensure not to close the cover of the charger.
53
INSTALLATION WITH COPPER SB
Power Sharing
Wiring the system
3. Check the position of CAN - L and CAN - H indicated above the connector.
Remember: the sequence in the connector can be different depending
on each product.
4. Once located the connector, start cabling the primary charger (the
first of the chain). Use a UTP 5E cable (a pair), then, insert one of
the cables in CAN-L and the other in CAN-H. After, connect the
other chargers of the chain following the scheme below. As you may
notice, all the chargers have CAN-L and a CAN-H inputs and outputs,
except for the first and the last ones.
CAN-L CAN-H
T NT NT T
Important
• Make sure to connect each CAN-L to the respective CAN-L
connector of all the chargers. Do the same for CAN-H.
• Power sharing works up to 25 chargers for each installation. Among
them, one is primary and 24 are secondary. The maximum distance
the communication wiring can reach is 250m.
CAN-L CAN-H
CAN-L
CAN-H
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
54
INSTALLATION WITH COPPER SB
Wiring the System
Terminating settings
1. Once the cabling is completed, you need to activate the termination resistors.
The first and the last charger will always be terminating (T) with non terminating
(NT) chargers between them.
T NT NT NT T
NT
CAN BUS
9 0
1 2 3
7 8
6
4 5
55
INSTALLATION WITH COPPER SB
Wiring the System
2. Once the termination resistors are set up, place the current selector of
each charger following the information. The first charger of the chain is the
primary charger, the others are secondary.
POSITION 0 1 2 3 4 5 6 7 8 9
60 Ω
4. Close the cover of the charger following the instructions in the respective
Installation Guide.
56
INSTALLATION WITH COPPER SB
Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
57
INSTALLATION WITH COPPER SB
Dynamic Power Sharing
Tools
A B C D
E F G H
Connecting cable between Cutter Connecting cable between Two pole lever
charger and meter charger and charger connectors
(STP Class 5E (UTP CAT 5E 250m (for small
500m Max Length) Max. Length) communication
wires)
Refer to the Copper SB Installation Guide to know more about the tools to install
the charger.
58
INSTALLATION WITH COPPER SB
Dynamic Power Sharing
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
59
INSTALLATION WITH COPPER SB
Dynamic Power Sharing
Copper SB Installation
Install the device following the instructions in the Copper SB Installation Guide.
Important
Ensure not to close the cover of the charger.
2.
Insert through the grommet the two communication wires, one
for meter communication and the other one for
communication between chargers.
3.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
4. Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
It is mandatory to use an STP class 5E cable. Employ only 1 wire
of each twisted pair and keep in mind that the communication
wiring must not be more than 500m long.
60
INSTALLATION WITH COPPER SB
Dynamic Power Sharing
EM 112 EM 340
D+ D+
T 3 GND D- T 7
GND D-
A- 5 A- 9
B+ 4 B+ 8
GND 6 GND 10
EM 330 N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A Clamp
L
D+ L
1 D+
9 A + 21
Current 8 T 10
GND D- 2 D-
Direction K K B - 20
L
7 A- 12 GND 24
GND
6 B+ 11 12V 23
12V
K
L
5 GND 13
K
4
D+
Voltage + 1
12V D-
Voltage - 2
GND A + 10
D+ A + 22
D+
RS485 - 3 B - 11
D- B - 23
D-
RS485 + 4 12
Power 5 13
Power + 6 18
19
20
21
Important
Remember to check the Compatibility Table of each meter.
61
INSTALLATION WITH COPPER SB
Dynamic Power Sharing
Wiring the system
3. Once located the connector, start cabling the primary charger (the
first of the chain). Use a UTP 5E cable (a pair), then, insert one of
the cables in CAN-L and the other in CAN-H. After, connect the
other chargers of the chain following the scheme below. As you may
notice, all the chargers have CAN-L and a CAN-H inputs and outputs,
except for the first and the last ones.
CAN-L CAN-H
T NT NT T
Important
• Make sure to connect each CAN-L to the respective CAN-L
connector of all the chargers. Do the same for CAN-H.
• Power sharing works up to 25 chargers for each installation.
Among them, one is primary and 24 are secondary. The
maximum distance the communication wiring can reach is
250m.
CAN-L CAN-H
CAN-L
CAN-H
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
62
INSTALLATION WITH COPPER SB
Dynamic Power Sharing
Terminating settings
1. Once the cabling is complete, you need to activate the terminating resistors. First
set up RS485 into T only for the charger that is connected into meter. Then set
up the CAN BUS, the first and the last charger will always be terminating (T) with
non terminating (NT) chargers between them.
T NT NT NT T
NT
CAN BUS
NT
RS485
9 0
1 2 3
7 8
6
4 5
63
INSTALLATION WITH COPPER SB
Dynamic Power Sharing
2. Once the termination resistors are set up, place the current selector of
each charger following the information. The first charger of the chain is the
primary charger, the others are secondary.
POSITION 0 1 2 3 4 5 6 7 8 9
60 Ω
4. Close the cover of the charger following the instructions in the respective
Installation Guide.
64
INSTALLATION WITH COMMANDER 2
Dynamic Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Dynamic Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
Once you finish the extension of the existing installation, continue with steps on the
next page for setting up the chargers.
65
INSTALLATION WITH QUASAR
V2H
Tools
A B C D
E F
Refer to the Quasar Installation Guide to know more about the tools to install
the charger.
66
INSTALLATION WITH QUASAR
V2H
Place the energy meter after the mains supply and before the fuse box.
C. Main Switch
D. Fuse Box
E. Energy Meter
F. Communication
G. RCDs+MCBs
67
INSTALLATION WITH QUASAR
V2H
Preparation
Keep the power turned off during the installation. Install the device following the instructions
in the Quasar Installation Guide.
Installation
68
INSTALLATION WITH QUASAR
V2H
Communication wiring between the charger and the meter
2.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
3.
Wire the meter and the charger by following the relevant
scheme below based on the model of your meter.
Important
It is mandatory to use a STP class 5E cable, use only 1 wire
of each twisted pair. Remember that the communication wiring
must not be more than 500m long.
Important
Remember that you need to use only one hole of the 3-exit grommet for
each communication line.
69
INSTALLATION WITH QUASAR
V2H
EM 112 EM 340
T 3 T 7
D- D-
A- 5 A- 9
D+ D+
B+ 4 B+ 8
GND GND
GND 6 GND 10
EM 330 N1 CT
Current
Direction
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A
L
9 Clamp
8 T 10
K
D-
L
1 12V 23
12V
L
7 A- 12
6 B+ 11
D+ 2 D-
K K B- 20
GND
L
5 GND 13 D+
A+ 21
4
K
GND 24
GND
A + 10
D+ A + 22 D+
B - 11
D- B - 23 D-
12
13
18
19
20
21
Important
Remember to check the Compatibility Table of each meter.
70
INSTALLATION WITH QUASAR
V2H
Terminating resistance activation and current selector configuration
4 5
9 0
1 2 3
7 8
6
4 5
POSITION 0 1 2 3 4 5 6 7 8 9
CURRENT (A) R 6 10 13 16 20 25 32 R R
3. Close the communication lid Note: Only Max Current > 6A per
phase is accepted for a correct
and tighten the screws.
performance. In case of doubts,
contact Wallbox Service.
9 0
1 2 3
7 8
6
4 5
71
INSTALLATION WITH PULSAR MAX
Getting started
Important Notes
D. Update the Wallbox charger with the latest software version before
installing the energy meter. Refer to the instructions for updating the
charger on the Wallbox Academy page for more information.
E. Ensure that the charger is powered off and its cover is removed
before connecting the energy meter. Close the charger properly after
the installation.
F. After installing the charger, connect the energy meter before closing
your charger. In case the energy meter is to be connected to a
previously installed charger, open it to connect the energy meter.
72
INSTALLATION WITH PULSAR MAX
Getting started
General Characteristics
Dynamic
Power Eco-Smart Power Power
Boost Sharing Sharing
Primary Chargers 1 1 1 1
Communication protocol Modbus RTU Modbus RTU Modbus RTU Modbus RTU
73
INSTALLATION WITH PULSAR MAX
Power Boost and Eco-Smart
Tools
A B C
D E
Refer to the Pulsar Max Installation Guide to know more about the tools to install
the charger.
74
INSTALLATION WITH PULSAR PLUS
Power Boost and Eco-Smart
Place the energy meter after the mains supply and before the fuse box.
C. Main Switch
D. Fuse Box
E. Energy Meter
F. Communication
G. RCDs+MCBs
75
INSTALLATION WITH PULSAR MAX
Power Boost and Eco-Smart
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
76
INSTALLATION WITH PULSAR MAX
Power Boost and Eco-Smart
Pulsar Max Installation Guide
Install the charger following the instructions in the Pulsar Max Installation Guide.
Important
Ensure not to close the cover of the charger.
3.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
4. Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
It is mandatory to use an STP class 5E cable. Employ only 1 wire
of each twisted pair and keep in mind that the communication
wiring must not be more than 500m long.
Important
Insert only one cable for each grommet.
77
INSTALLATION WITH PULSAR MAX
Power Boost and Eco-Smart
EM 340
9 0
1 2 3
7 8
6
4 5
Current
Direction
T 7
D-
A- 9
D+
B+ 8
GND
GND 10
EM 112 EM 330 N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A Clamp
L
9
L
1
A + 21
D+
T 3 8 T 10 K
2
B - 20
D-
K
D- L
D- GND 24
GND
A- 5 7 A- 12
D+ D+ 12V 23
12V
B+ 4 K
6 B+ 11
GND L
GND
GND 6 5 GND 13
K
4
Voltage + 1 D+
D+ A + 22
A + 10 D-
Voltage - 2
B - 11
D- B - 23
RS485 - 3
12
RS485 + 4
13
Power 5 18
Power + 6 19
20
21
Important
Remember to check the Compatibility Table of each meter.
78
INSTALLATION WITH PULSAR MAX
Power Boost and Eco-Smart
Terminating resistance activation and current selector configuration
9 0
1 2 3
7 8
6 4 5
NT
PWR BOOS 9 0
1 2 3
7 8
6
4 5
3. See the matrix below. This value must be the lower out of the main switch
rated current MCB (not the RCD) and the contracted tariff.
POSITION 0 1 2 3 4 5 6 7 8 9
CURRENT (A) R 6 10 13 16 20 25 32 R R
4. Close the cover of the charger following the instructions in the charger’s
Installation Guide.
79
INSTALLATION WITH PULSAR MAX
Power Sharing
Tools
A B C
D E F
Refer to the Pulsar Max Installation Guide to know more about the tools to install
the charger.
80
INSTALLATION WITH PULSAR MAX
Power Sharing
Pulsar Max is not compatible with Pulsar Plus, Commander 2 and
Copper SB, so the Power Sharing function must not be used with
other chargers.
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
81
INSTALLATION WITH PULSAR MAX
Power Sharing
Wiring the system
4. Once located the connector, start cabling the first charger of the chain.
Check the Tools section to check if you need to use a third wire (GND).
T NT T
GND GND
D- D-
D+ D+
Important
• Power sharing works up to 25 chargers for each installation. Among
them, one is primary and 24 are secondary. The maximum distance
the communication wiring can reach is 250m.
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
82
INSTALLATION WITH PULSAR MAX
Wiring the System
Terminating settings
1. Once the cabling is completed, you need to activate the termination resistors.
The first and the last charger will always be terminating (T) with non terminating
(NT) chargers between them.
T NT NT NT T
9 0
1 2 3
7 8
6
4 5
9 0
1 2 3
7 8
6
4 5
NT
PWR SHR
83
INSTALLATION WITH PULSAR MAX
Wiring the System
2. Once the termination resistors are set up, place the current selector of
each charger following the information. Put the rotary switch into a position
between 1 and 7 depending on the maximum current that can be supplied
from the charging network.
POSITION 0 1 2 3 4 5 6 7 8 9
MAX CURRENT R 6 10 13 16 20 25 32 R R
Important
Make sure that the selector does not point to 0, 8 and 9.
84
INSTALLATION WITH PULSAR MAX
Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
85
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
Tools
A B C D
Refer to the Pulsar Max Installation Guide to know more about the tools to install
the charger.
86
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
Pulsar Max is not compatible with Pulsar Plus, Commander 2 and
Copper SB, so the Dynamic Power Sharing function must not be
used with other chargers.
Before Installation
• Ensure that the power is turned off during the installation.
• Separate the communication wires from the power ones.
Preparation
87
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
Pulsar Max Installation Guide
Install the charger following the instructions in the Pulsar Max Installation Guide.
Important
Ensure not to close the cover of the charger.
2.
Insert through the grommet the two communication wires, one
for meter communication and the other one for communication
between chargers.
3.
Install the meter following the instructions in the Meter Wiring
Guide included in the package.
4. Wire the meter and the charger by following the relevant scheme
below based on the model of your meter.
Important
For the communication with the meter is mandatory to use STP
class 5E cable and keep in mind that the communication wiring
must not be more than 500 meters.
Important
For the communication between chargers is mandatory to use UTP
or STP class and keep in mind that all the chargers chain must not
be more than 250 meters.
88
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
EM 340
9 0
1 2 3
7 8
6
4 5
Current
Direction
T 7
D-
A- 9
D+
B+ 8
GND
GND 10
EM 112 EM 330 N1 CT
CTA 5X 250 A 5A
CTA 6X 400 A 5A
Clamps CTD-6S 600 A 5A Clamp
L
9
L
1
A + 21
D+
T 3 8 T 10 K
2
B - 20
D-
K
D- L
D- GND 24
GND
A- 5 7 A- 12
D+ D+ 12V 23
12V
B+ 4 K
6 B+ 11
GND L
GND
GND 6 5 GND 13
K
4
Voltage + 1 D+
D+ A + 22
A + 10 D-
Voltage - 2
B - 11
D- B - 23
RS485 - 3
12
RS485 + 4
13
Power 5 18
Power + 6 19
20
21
Important
Remember to check the Compatibility Table of each meter.
89
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
Wiring the system
4. Once located the connector, start cabling the the first charger of the
chain. Check the Tools section to check if you need to use a third
cable (GND).
T NT T
GND GND
D- D-
D+ D+
Important
• Dynamic Power Sharing works up to 25 chargers for each
installation. Among them, one is primary and 24 are secondary. The
maximum distance the communication wiring can reach is 250m.
Note: Only Max Current > 6A per phase is accepted for a correct
performance. In case of doubts, contact Wallbox Service.
90
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
Terminating settings
1. Once the cabling is complete, you need to activate the terminating resistors. First
set up PWR BOOS into T only for the charger that is connected into meter. Then,
set up PWR SHR, the first and the last charger will always be terminating (T) with
non terminating (NT) chargers between them.
T NT NT NT T
9 0
1 2 3
7 8
6
4 5
T
9 0
NT
1 2 3
7 8
PWR BOOS
6
4 5
NT
PWR SHR
91
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
2. Once the termination resistors are set up, place the current selector of
each charger following the information. Put the rotary switch into a position
between 1 and 7 depending on the maximum current that can be supplied
from the charging network.
POSITION 0 1 2 3 4 5 6 7 8 9
MAX CURRENT R 6 10 13 16 20 25 32 R R
Important
Make sure that the selector does not point to 0, 8 and 9.
92
INSTALLATION WITH PULSAR MAX
Dynamic Power Sharing
Adding chargers in the future:
If you anticipate adding chargers to the system in the future, there are two ways you
can prepare the system now to make it ready for Dynamic Power Sharing.
Important
New chargers may be placed anywhere physically in relation to the existing
chargers as long as you follow these rules:
• You maintain the logic of the daisy chain.
• You respect the cabling polarity as described above under “Installation”.
Wherever a future added charger is placed, the most important rule to
follow is the logic of the daisy chain. For example, in the image below, the
new charger is placed before the Terminating charger on the right side of
the daisy chain.
Option 1:
NT
NEW
T NT T T NT T
Option 2:
NEW
T
T NT T T NT NT
93
CONFIGURATION
Power Boost
Enabling Power Boost
Follow these steps to activate Power Boost once you have installed your charger and its
compatible energy meter:
1. Make sure your Wallbox charger and myWallbox mobile app have the latest
version available (you can check its version in your Play Store or App Store).
94
CONFIGURATION
Power Boost
4. Select the charger you want to 5. Once the synchronization between
enable Power Boost for and stay your charger and your App is
within its Bluetooth range during all complete, go to Settings.
the following steps. If you did not
link your charger to your myWallbox
account yet, please follow these
instructions to do so.
95
CONFIGURATION
Power Boost
6. Then click Upgrades. 7. Click the Power Boost icon.
96
CONFIGURATION
Power Boost
8. Enable the Power Boost feature by switching the button to the ON position.
In the Max current per phase field, specify the main breaker rated current or
subscribed current (in amps), whichever is lower. Then, click Accept to enable
Power Boost.
Important Only Max Current per phase greater than 6 amps is accepted
for correct performance. In case of doubt, contact Wallbox
Customer Service.
97
CONFIGURATION
Eco-Smart
Enabling Eco-Smart
Follow these steps to activate Eco-Smart once you have installed your charger and its
compatible energy meter:
1. Make sure your Wallbox charger and myWallbox mobile app have the latest
version available (you can check its version in your Play Store or App Store).
98
CONFIGURATION
Eco-Smart
4. On the charger screen, select the 5. Once synchronization is complete,
charger you wish to activate the tap the cogwheel to access the
Eco-Smart feature for. If you did not Settings.
link your charger to your myWallbox
account yet, please follow these
instructions to do so.
99
CONFIGURATION
Eco-Smart
6. Click Upgrades. 7. It is recommended to activate
Power Boost (1) before enabling
Eco-Smart. Once Power Boost is
activated tap the Eco-Smart (2)
feature to access its settings.
100
CONFIGURATION
Eco-Smart
8. Tap “Let’s start” to start using 9. Enable the Eco-Smart feature
Eco-Smart. by switching the button to the
ON position.
101
CONFIGURATION
Eco-Smart
10. You now have a choice to select two Eco-Smart modes. Select the mode
that you wish to use, Eco or Full-Green.
11. Then click Save. The Eco-Smart feature is now activated with the mode you
have selected.
102
CONFIGURATION
V2H
Enabling Vehicle to Home
Follow these steps to activate Vehicle to Home for your Quasar:
1. Make sure your Wallbox charger and myWallbox mobile app have the latest
version available (you can check its version in your Play Store or App Store).
103
CONFIGURATION
V2H
4. Select your charger and stay within 5. To activate Vehicle to Home, you
its Bluetooth range during all the will first need to enable Power
following steps. If you did not link Boost. Please refer to the Power
your charger to your myWallbox Boost article to learn how to
account yet, please follow these activate it.
instructions to do so.
104
CONFIGURATION
V2H
6. Once you have configured 7. Click Upgrades.
Power Boost properly and the
synchronization between the
charger and the app is complete (the
charging wheel turns green), go to
Settings.
105
CONFIGURATION
V2H
8. Then click Vehicle to Home. 9. Enable the Vehicle to Home feature
by switching the button to the ON
position.
106
CONFIGURATION
V2H
10. In Max Current per phase of 11. CASE 1: If Max Current per phase
installation (in amps), specify the of the installation is greater than
main breaker rated current. The Power Boost current, you need to
value specified has to be equal to turn on the Preventive discharge
or greater than the MAX. CURRENT feature. Once done, click SAVE
PER PHASE (in amps) set for Power and Vehicle to Home will be fully
Boost. Click Save. configurated.
107
CONFIGURATION
V2H
11. CASE 2: If Max Current per phase 11. CASE 3: If Max Current per phase
set in Vehicle to Home is equal to of installation set in Vehicle to
Power Boost current per phase, just Home is lower than Power Boost
click SAVE and Vehicle to Home will current per phase, you will not be
be activated. able to save this configuration and
an error message will display. Set
a value greater or equal to Power
Boost current per phase to enable
Vehicle to Home.
108
CONFIGURATION
Power Sharing
Enabling Power Sharing
Follow these steps to activate Power Sharing for your charger:
1. Make sure your Wallbox charger and myWallbox mobile app have the latest
version available (you can check its version in your Play Store or App Store).
109
CONFIGURATION
Power Sharing
4. With Pulsar Plus, Commander 2 5. Once your charger and myWallbox
and Copper SB select the primary App are synchronized (the charging
charger of the chain and stay within its wheel will turn green on your app),
Bluetooth range during all the following go to Settings.
steps. With Pulsar Max, select any
charger of the chain. If you did not
link your charger to your myWallbox
account yet, please follow these
instructions to add your charger.
110
CONFIGURATION
Power Sharing
6. Click Upgrades. 7. Then click the Power Sharing icon.
111
CONFIGURATION
Power Sharing
8. Indicate the Number of chargers 9. Define the Min. current per charger
that are present on the installation. (in amps) that each charger will
In the Max. current per phase field, operate.
specify the max. rated current of the
protection installed (MCB) to protect
all chargers installation. Please
note that only maximum current
per phase greater than 6 amps is
accepted for correct performance.
In case of doubt, contact Wallbox
Service.
112
CONFIGURATION
Power Sharing
10. Once you go through all the steps, click Save and ensure that the status
“Primary charger with all secondary chargers paired” appears.
113
CONFIGURATION
Dynamic Power Sharing
Enabling Dynamic Power Sharing
1. Make sure your Wallbox charger and myWallbox mobile app have the latest
version available (you can check its version in your Play Store or App Store).
114
CONFIGURATION
Dynamic Power Sharing
4. Select the charger that is connected 5. Once your charger and myWallbox
to the meter and stay within its App are synchronized, go to Settings.
Bluetooth range during all the
following steps. If you did not link
your charger to your myWallbox
account yet, please follow these
instructions to do so.
115
CONFIGURATION
Dynamic Power Sharing
6. Click Upgrades. 7. Click the Power Sharing icon.
116
CONFIGURATION
Dynamic Power Sharing
8. Indicate the Number of chargers 9. Define the Min. current per charger
present on the installation. (in amps) that each charger will
In the Max. current per phase field, operate.
specify the max. rated current of the
protection installed (MCB) to protect
all chargers installation. Please note
that only Max. current per phase
greater than 6 amps is accepted
for correct performance. Contact
Wallbox Service in case of doubts.
117
CONFIGURATION
Dynamic Power Sharing
10. Turn on Dynamic Power Sharing. 11. Click Save and ensure that the
Specify the Building breaker status “Primary charger with all
max current (in amps) and the secondary chargers paired” appears.
Subscribed power (in kVa).
118
Appendix
119
INSTALLATION WITH PULSAR PLUS,
COMMANDER 2, QUASAR AND COPPER SB
Applicable to Power Boost, Eco-Smart,
V2H, Dynamic Power Sharing
N 1 2 3 N 1 2 3
4 5 6 7 8 9 4 5 6 7 8 9
x 1.5s
PASS PASS
0000 0000
P1 PrG P1 PrG
10 11 12 13 14 15 10 11 12 13 14 15
16 17 16 17
N 1 2 3 N 1 2 3
4 5 6 7 8 9 4 5 6 7 8 9
Ct rAt lo End
50 x 1.5s
P4 P18
10 11 12 13 14 15 10 11 12 13 14 15
16 17 16 17
120
support.wallbox.com