PROPOSAL FOR

10 KLD WASTE WATER


EVAPORATION PLANT
FOR
ZERO LIQUID DISCHARGE

Client Details:
SHRI AMIT JI SAMDARIA
SubmittedPRINTS
M/s NAKODA By:
SHREE PADMAWATI
PUNAYATA INDUSTRIALPOLYMERS
AREA
Plot no. F-271, MANDIA ROAD,
PALI
Riico Industrial Area,
PALI-RAJASTHAN
SHREE PADMAWATI POLYMERS

Company Profile:

SHREE PADMAWATI POLYMERS, SPP is a well established & growing engineering company situated
in PALI-RAJASTHAN . Established in 2005.
SPP has commendable achievements in the field of Design, Manufacture, Installation & Commissioning of
Evaporators, Vacuum Ejectors, Vacuum Pumps, High Pressure Pumps, Heat Exchangers, Condenser,
Crystallizer, Vacuum System etc.
The asset of the company is young and experienced Engineers who have good theoretical knowledge and
sound practical experience.
The team of SPP has the vision to solve the problem from the definition to Process Design, basic
Engineering, detail engineering, manufacturing and the successful erection & commissioning of the system.

Product Range:

Multiple Effect Evaporator Plant


Forced Circulation Evaporation Plant
Falling Film Evaporation Plant
Waste Water Evaporation Plant
Caustic Recovery Plant
Vacuum System
Heat Exchangers
Condensers
Crystallizer
Vacuum Ejectors & Vacuum Pumps
Solvent Recovery Stripper Plants
Distillation Plants

Date: 31.12.21
To,

Kind Attend to:

Subject:Falling Film Single Effect Evaporator Plant for Zero Liquid Discharge.

Feed- 10 KLD, Feed TDS- 02%, Operating Hour- 20.

Dear Sir,

Page | 2
SHREE PADMAWATI POLYMERS
AS per the discussion, we are pleased to submit herewith the best techno-commercial proposal for following
System to achieve Zero Liquid Discharge.

1- Single Stage Falling Film Evaporator System.


Single Stage Falling Film Evaporator is used to increase the concentration of effluent from
02 % to 35% TDS.
The outlet will be in the form Slurry. It will be taken in to Sludge Dry bed to recover Salt.

We are sending the Following attachments with the offer.

1- Offer for Single (Stage) Effect falling film Evaporator System


2- Total project overall cost with structure, Cooling Tower, Electric work, Pipeline fabrication at the
site etc.

Please find attached herewith following Data:


 Technical Data Sheet.
 Material of Construction.
 Scope of supply.
 Terms & Conditions.

We are sure that the above is in line with your requirement. If you require any further detail, feel free to
contact us.

Thanking you,

Rajesh Kothari
(Proprietor)

Single Stage Falling Film Evaporator System

Sr. No. Particulars Unit value

1. Water Evaporation Capacity Kgs/hr 460


2. Feed Rate Kgs/hr 500
3. Concentrate Outlet Rate Kgs/hr 40
4. Total Solids in Product Feed TDS % 02%
5. Total Solids in Concentrate Outlet TDS % 35%
o
6. Concentrate Outlet Temp. Around C 65 to 60
7. Cooling water In let/out let Temp. Around oC 32 to 38
3
8. Cooling Water Quantity M / hr 12
9. Require Steam pressure Kg/cm2 03 to 04

Page | 3
SHREE PADMAWATI POLYMERS
10. Motive Steam Consumption Kgs/hr 450
11. Plant Power Requirement HP 7.5
12. Cooling Tower Power with fan HP 03
13. Vacuum Pump Power HP 03
14. Additional Power for centrifuge HP --
15. Operating hours Hrs / Day 20
16. Duty - Contin.
17. Total Power Require HP 10
KWH absorb

Material of construction & Scope supply with Quantity:

Single Effect Falling Film Evaporator System

Sr. No. Particulars M.O.C.

1. CALANDRIA:
Tubes- SS316Ti
Tube Sheet SS316/MS 01 NO
Shell SS304/MS
2. Vapor Separator SS316/MS 01 NO
3. Pre heaters:
Tubes SS316Ti
Tube Sheet SS316/MS 01 NO
Shell SS304/MS
4. Barometric Condenser CS+SS304 01 NO
5. PUMPS with Motors:
Feed Pump SS316/MS 01 NO
Re circulation Pumps SS316/MS 01 NO
Transfer Pumps SS316/MS 00 NO
Condensate water Pump SS316/MS 01 NO
6. Vacuum pumps with motor SS316/MS 01 NO
7. Pipes & Fittings:
Process Piping SS316
Vapor Ducting CS 01 LOT
Condensate Piping SS304
Non Condensate Piping SS304
Vacuum Line CS
8. Balance Tank-100 liter MSRL 01 NO
9. Thermo compressor SS304 Not Require
10. CATCH POT SS304/MS 01 NO

Scope of Supply Of Instruments & it’s make:

Sr. No. Particulars M.O.C. Quantity

Page | 4
SHREE PADMAWATI POLYMERS
1. Vacuum Gauge – Forbes 4’’Dial 01 No
2. Temperature Indicator –Forbes Std 03 No
3. Temperature Indicator – Waree Std 03 No
4. Pressure Gauge Std 01 No
5. DFM for Condensate- Forbes Std 00 No
6. DFM- FOR FEED- Forbes Std 01 NO
7. Rota meters Std 02 No
Electric Panel. With MFM + Hooter etc Std 01 No
NON Compartment type.

Scope of Work:

We are included in our scope as below item as per the discussion

 Design, Engineering, Manufacturing, and Supply of the equipments.


 Supervision of erection & Commissioning of the system.
 Supply of Operation & Maintenance manual.
 Supply of the Civil and Structure drawings.
 Insurance are included in our scope.
 Included the Plant running for 03 Days with supervisors. With help of your company Person.
For Daily day time 10Hours.
 Commissioning charges included.

Not Included in Scope of Supply:

 Waste Water Feed Line up to the plant.


 Condensate Water Outlet line from the Plant.
 Steam line to Steam Header. And Steam line From Header to TVR.
 All civil work related with the evaporator plant.
 Provide the area for salt storage- Having 02 TON Storage.
 Provide the RO Reject Storage around 3 Days.-
 Provide Storage For Concentrate Waste Water- 03 DAYS.- 20KLD
 Main cable incomer to our Panel. With require control.
 Supporting Structure / platform / stair case etc.
 Cooling Tower, Cooling Water inlet & Outlet circulation line.
 Equipment Erection & Process pipe line fabrication at site.
 Electric work with cabling, lighting, etc.
 Insulation of the Equipments.
 Transport Charges Extra as actual.
 All taxes to be paid by you.
 Erection charges extra.
 Cooling Water Pump.
 Roof of the Structure.
 RCC Room For Panel area. With Roof.

Page | 5
SHREE PADMAWATI POLYMERS
Space Requirement:

 Space Require For Plant.- 3.5 Mtr W x 06 MTR Length x 10 Mtr HT.
 Space Require For cooling tower - 03 Mtr W x 04MTR Length x 04 Mtr HT.

TERMS AND CONDITIONS:

As on date : 31.12.21

PRICE - SS316 : Price for Supply of the Following System- For Zero Discharge.
Feed- 10 KLD-01 System.
: System: Single Effect Falling Film Circulation Evaporator System with SS316
and SS304 MOC.
Price: 12, 00,000-/-
Twelve Lacs Rupees.

PRICE- MS : Price for Supply of Single Effect Evaporator


Falling film Type.
10 kld Capacity with MOC MS (Mild Steel)
Price : 4,85,000/-
Four lac Eighty five thousand Only.

DELIVERY : Within 35 Days Months from the date of receipt of order.

Transport Charges Extra. And Insurance Charges Included.


Erection & Commissioning- 25 Days.

PAYMENT : 55% advance with the order.


40% against Performa Invoice Prior to dispatch with taxes.
05% after Commissioning within 30 Days.

For Plant Commissioning we run the Plant 03 Days. At that time we are record the Plant Capacity and salt
Recovery etc. At that time we require Utility & Feed requirement as per our offer.

TAXES : GST @ 18% Extra.

Performance Warranty : 10 % + OR - with Efficiency and Utility.

Warranty for Equipment: We are giving warranty for Equipment for 12 month from the date of the
Supply for any manufacturing defect. Not For the Moving part like Pump, motor etc.
Above warrantee does not apply on damage caused by accident, normal wear & tear, improper storage or
transportation.

Order Cancellation :
Order received and acknowledged by the seller shall not be subject to cancellation either wholly or partly
for any reason whatsoever without the seller’s written consent.
The Amount already paid as advance will not be returned in case the order is cancelled in whole or in part.

Thanking You,

Rajesh kothari
(Proprietor)

Page | 6
SHREE PADMAWATI POLYMERS

Additional cost for Other Work require at site for Evaporation System:

Here we are giving the other cost of related work for the Evaporator plant done at the site.

It is in the scope of client. Additional Cost.

Sr. No. Particulars

1 Cooling Tower Cost 0.50Lacs


2 Cooling Tower Pipelines Cost (For MS Pipe Line) 0.10Lacs
With Cooling Tower Pump with motor
3 Steam Pipe lines cost (Inside our plant only) As Actual
4 MS Structure 01.25Lacs
5 Paint with Primer 00.10Lacs
6 Cables For Pumps, Lighting Cable, Light lamp, 00.10Lacs
Motor Guard etc., Earthing etc
7 Erection & Fabrication cost of Equipments and pipe line at site 0.25Lacs
8 Insulation-LRB Pad- 50mm THK x 100 Density. 0.05 Lacs
For All Equipment and Piping. With GI sheet
Total other cost

 Civil Columns for foundations and Equipments Extra.


 Storage tank for Feed Tank Etc.
 Boiler cost is extra - Boiler Require -900kg/hr capacity max.

Thanking You,

Rajesh Kothari
9829620316

Page | 7