Binder 1
Binder 1
Binder 1
A
NOTES: KIBLAT
(292° 30' 00")
SUNGAI
1. ALL DIMENSION ARE IN MILLIMETRE
BULOH E1
FGL PROPOSED FINISH GROUND LEVEL
2. PRIOR TO COMMENCEMENT OF WORKS, THE WORKS PACKAGE CONTRACTOR (WPC) One Utama
SHALL CONDUCT BUILDING CONDITION OR DILAPIDATION SURVEYS AND SUBMIT THE E23 RL PROPOSED ROAD LEVEL
Tropicana ● Tropicana
RELEVANT DOCUMENTS FOR CLEARANCE. BUILDING CONDITION OR DILAPIDATION SURVEYS AS REQUIRED TO
PELAN KUNCI PETALING golf Country
& Resort PELAN
Damansara
LOKASI
ESTABLISH THE CONDITION OF ANY BUILDING THAT MAY BE AFFECTED BY CONSTRUCTION WORKS
BUKIT
Lien Hoe ●
Mutiara
Tropicana
Utama
E11
TOTAL STATION DEVELOPMENT AREA
(TEMPORARY OF PERMANENT) PRIOR TO THE COMMENCEMENT OF ANY WORKS. THE SURVEY SHALL INSPECT Dataran Prima
DENOTES NEW PREMIX ROAD
KAPAR RAJA SUBANG
BUS DEPOT
LAPANGAN
TERBANG
● Citta Mall
KELANG Medical 15 DENOTES EXISTING ROAD TO BE
JALAN
LAPANGAN
TERBANG
ACCESS THEIR STRUCTURAL CONDITION. IT SHALL ALSO INCLUDE SENSITIVE/HERITAGE BUILDINGS WITHIN Taman Botani ● Bukit Jelutong
Centre
Negara Shah Saujana ● Persada Plus
100M FROM THE RAILWAY ALIGNMENT. THE SURVEYS SHALL REQUIRE THE CONFIRMATION OF THE FINDINGS Alam golf & Country
Club
E1 MILL & PAVE
● E1
WITH THE BUILDING OWNER TO PREVENT/AVOID POTENTIAL DISPUTES DURING CONSTRUCTION OR LATTER Setia City Mall
● PROPOSED SITE Hicom
Glenmarie Station 3 EXISTING ROAD TO MILL & PAVE
OPERATION OF THE SYSTEM. THE SURVEYS SHOULD BE CARRIED OUT WITH THE REASONABLE DILIGENCE AND
SHALL COVER BUT NOT BE LIMITED TO THE FOLLOWING; Klang Utara
●
Setia Alam
●
E30
Sultan
Salahuddin
Abdul Aziz
Mosque
Persiaran
Hishamuddin
Industrial Park
● ●
Perindustrian
E10
Kelab Golf
Temasya Kawasan Negara Subang
●
Temasya
(BY OTHERS) KERAJAAN MALAYSIA
I. THE BUILDING STRUCTURE CONDITION 20 University ●
Stadium
Glenmarie
● Subang Jaya
Bukit Raja
Teknologi
MARA
Section 14
2
E10 DENOTES EXISTING ROAD
II. THE LOADING ON THE STRUCTURE OF THE BUILDING TO IDENTIFY ANY CHANGE OF USE, WHICH CAN Pasar Besar Klang
●
Sirim
PROJECT TITLE:
RESULT IN OVERLOADING I-City
Uitm
● Section 15 DAMANSARA
Jalan Meru E5
Kawasan 17
III. ANY ADDITION AND ALTERATION WORKS AFFECTING THE STRUCTURE OF THE BUILDING. 2
BROOM FINISH CONSTRUCTION AND COMPLETION OF LIGHT RAIL
L23
3. STRUCTURAL MOVEMENT ASSESSMENT INDUCED BY WORKS ON EXISTING BUILDING AND STRUCTURES (EBS),
NEW PERMANENT WORKS AND TEMPORARY WORK SHALL BE CONDUCTED. THE INTENT OF THE STRUCTURAL Klang
● Majlis
Perbandaran
Subang Jaya DENOTES KERB TYPE II WITH
TRANSIT LINE 3 (LRT3) FROM
MOVEMENT ASSESSMENT SHALL BE TO COLLECT RECORDS, EVALUATE THE STRUCTURAL IMPLICATIONS TO
● Section 15
● Puchong
OUTLET CHANNEL BANDAR UTAMA TO JOHAN SETIA
E11
EBS, AND IDENTIFY THE REQUIRED MOVEMENT/DISTORTION LIMITS FROM THE PROPOSED WORKS. PDP SHALL
INCORPORATE THE RECOMMENDATION FROM THE MOVEMENT ASSESSMENT IN THE TENDER AND CONTRACT
Tmn. Selatan
● Taman
PROPOSED SITE DENOTES PROPOSED GUARD RAIL PROJECT PACKAGE:
PETALING
L16
L17
● Taman Sri Sri Muda L18 L21G
● One City
DOCUMENTS TO CONTRACTORS. Sri Andalas
Andalas L16A
L16B
L19 L20
L21D
L21E
L21F
DENOTES PROPOSED NJB
L16C
L16D L16E L16F L21C
L16G L21B
● Port Klang
4. EDGE LINE/CHANNELISING LINE (TYPE 6) SHALL BE LOCATED AT EVERY 250 MM FROM ROAD SIDE KERB. ● Bandar Bukit
Tinggi
Tesco Bukit Tinggi R06
R07
L16H
L16I
L16J L21 L21A
R27 R28 ROW DENOTES RIGHT OF WAY EASTERN CORRIDOR
R26
KELANG
R08 R09 R10
● Putra Heights R20 R22
5. EXISTING INTERLOCKING PAVER BLOCK SHALL BE DEMOLISHED AND REPLACED WITH NEW R12 R21 R23 R24 R25 R29
● Bandar Bukit
Tinggi 2 Aeon Bukit Tinggi
● Kota Kemuning
R11
R19 R18
DENOTES PLASTIC TRAFFIC POLE
CONCRETE IMPRINT. THE SUBGRADE SHALL BE CHECKED FOR MINIMUM CBR GREATER THAN 5%. ● Taman Sentosa
R16B
R17 R30
WHEN NECESSARY, EXISTING UNSUITABLE MATERIAL AT SUBGRADE LEVEL SHALL BE REMOVED TO A Bandar Botanik R13 R14 R16A
R16 DENOTES PROPOSED RC WALL
E5
E5
DEPTH OF 0.5 METER AND REPLACED WITH COMPACTED GRANULAR MATERIAL AS SPECIFIED. Johan Setia
R15
LIMIT OF WORK
10. RELOCATION AND REINSTATEMENT OF EXISTING LAMP POSTS AND LOCATION SHALL BE REFERRED TO 5 Jalan Langat E11 Lebuhraya Damansara Puchong
ELECTRICAL DRAWINGS. E30 Lebuhraya Shapadu 15 Jalan Lapangan Terbang Subang AGENSI PENGANGKUTAN AWAM DARAT ( APAD )
Aras G, M dan 20 Menara Tun Ismail Mohamed Ali
19+500
11. ALL KERB SHALL BE PAINTED WITH ALTERNATE BLACK AND WHITE. E30 Lebuhraya Selat Kelang 15 Jalan Lapangan Terbang Subang
12. ALL UTILITIES MUST BE LAID UNDERGROUND No. 25 Jalan Raja Laut
50350 Kuala Lumpur. Tel : 1 800 99 7723
19+400
Laman Web : www.apad.gov.my
RL
-
+35
R38.00
.00
WW02
19+300
STOP LINE TYPE 7 R87.00
RL
+35
.15
6.0m
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW 1 2 PROJECT OWNER :
3
ROW ROW
4
P14-05N
RL +3
5
P14-04N
UITM SHAH ALAM 6
P14-03N
7 8
P14-02N
P14-01N
5.30
ROW
R93.0
P14-04N
P14-03N
ROW
B-20-1, LEVEL 20, MENARA UOA BANGSAR,
P14-02N
ROW ROW ROW
P14-01N
ROW ROW ROW
ROW
NO. 5 JALAN BANGSAR UTAMA 1,
ROW
P13-29N
P13-28N
ROW
Tel: 603-22991999 Fax: 603-22991919
ROW
CONTRACTOR :
R4
ROW
Builders
ROW ROW
-
ROW
ROW ROW
ROW
ROW
PROPOSED ANTI
ROW ROW ROW
SNATCH RAILING
ROW
RL. +27.00
RL. +28.00 R61.55 ROW ROW ROW Setia Utama LRT 3 Sdn Bhd 201501033880 (1159200-W)
RL. +29.00 ROW
GRADIENT RL. +30.00
(formerly known as MRCB George Kent Sdn Bhd)
1:30
ROW
RL. +31.00
ROW
1 2
( TYPE 15C) R5
5000
5000
5000
ENTRANCE 2
LWP
R58.45
ROW
8200
ROW
48 47 46 45 44 43 42 41 40
RL. +27.00
39 38 37 36 35 34 33
32 31 30 29 28 27 26 25 24
23 22 21 20 19 18 17
BUS
16 15 14 13 12 11 10 9 8 7
6 5 4 3 2 1
PROPOSED
PROPOSED ANTI TEL: 603-76889298 FAX: 603-76889299
OSD 2
R20.00 5.0m RL. +28.00
GRADIENT WW02 B
EWP
EWP
LWP
SNATCH RAILING
RL. +33.00
FENCING
WW02 1:25 RL. +29.00
1 R46.55
RED COLOURED PAVEMENT EDGE LINE TYPE 6 LEAD CONSULTANT :
ROW
WW02
ROW
RL. +30.00
RL. +27.00
GRADIENT
PL+25.50 GRADIENT
R31.00
ROW
Minconsult
ROW
TAXI
3.04 m
2 NT
point 1
TAXI
1:2 DIE
3.6mGRADIENT
RL. +28.00 R20.00
GR1 : 25
4.01 m
R8.67 RL. +29.00
1:25
A
3m
3.6m
GR
AD
RL. +32.00
4.01 m
GRADIENT
IEN
RL. +30.00
ROW
ROW
T
ROW
ROW 3.6m
ROW
ROW
RL. +31.00 603-79525757 603-79547575
RL. +24.00 ROW
ROW 0.65M 11KV 1C ROW GRAD RL. +34.00 PROPOSED ANTI
0.77M 11KV 2C IE
1:25 NT SNATCH RAILING
ROW
ROW ROW
0.88M 11KV 3C 0.75M 11KV 1C RL. +34.00
RL. +23.00 ROAD STUD 0.9M 11KV 1C ROW
R5.00
IENT 0.3M 11KV 1C RL. +32.00 RL. +33.00
Point 3
0.8M 11KV 2C
GRA1D:15
ENTRANCE
ROW
PROPOSED
0.77M 11KV 3CANTI R15.10
Point 4
ROW
RL. +22.00 0.2M 11KV 1C 0.73M DIGI 2C SNATCH RAILING R247.45 3.6m
WW02 WW02
R23.45 DESIGN CONSULTANT :
m
20
1.2M DIGI 2C RL. +35.00
16
Point 2TRAFFIC ( TYPE 15C)
ROW
11
0.78M 11KV 1C PL+34.00
5
0.83M 11KV 2C
ROW
1.2M DIGI 2C
10
UP
ROW
ORK
0.77M 11KV 1C
0.78M 11KV 1C
4.01
GR 1:
0.37M 11KV 3C 0.55M 11KV 4C ROW R29.50
5m RL. +21.00
CENTRE LANE LINE TYPE 3
0.58M 11KV 2C PERUNDING ABENA C&S SDN. BHD.
AD 22
37.7
Point 5EDGE LINE TYPE 6 R8.67 R26.55
OF W
0.78M 11KV 3C ROW
0.82M 11KV 1C 0.35M 11KV 4C 0.98M 33KV 2C 3.0
IEN
0.95M 33KV 2C ROW 0
0.76M DIGI 2C
WW02
T
1.83M 11KV 1C 0.89M 33KV 2C ROW
R30.00 RL. +35.00 Co. Regn. No. : 1164019-H
IMIT
RL. +36.00
0.4M 11KV 1C
LW
1.2M DIGI 2C ROW
RL. +20.00 32-1B BLOCK 12, JALAN PAHAT J 15/J,
RO
0.68M 11KV 1C
CONTINUITY LINE TYPE 1 TAXI
0.45MSTOP/TAXI
11KV 2C LAY-BY LINE ROW
0.2M 11KV 2C
TYPE 12 0.93M 11KV 1C ROW KOMPLEK OTOMOBIL, SEKSYEN 15,
0.95M 33KV 2C
0.65M 11KV 1C
0.95M 11KV 1C
ROW 40200, SHAH ALAM,
RL. +19.00 0.6M 11KV 1C
Point 6 2.4M HDD 1C
WW02 ROW
RL. +36.00
ROW
SELANGOR DARUL EHSAN.
Tel. No. : 012-3228605
LIMIT
0.8M 33KV 2C
PROPOSED ANTI 0.93M DIGI 2C
SNATCH RAILING (200m)
0.8M 11KV 1C RL. +36.70 Email: perundingabena@gmail.com
0.5M 11KV 1C CHEVRON HATCHING MERGING
PROPOSED ANTI
OF W
1.1M 11KV 2C
WW02 0.49M 11KV 2C
TRAFFIC ( TYPE 15B ) SNATCH RAILING (200m)
PUI
0.99M 33KV 2C IARA
0.52M 11KV 1C N SEL
ANGO Rev Date Description Desg Check Appr
R8 CONTINUITY LINE TYPE 1
0.9M 11KV 2C
R
- WW00 22/10/2019 ISSUED FOR CONSTRUCTION MFA ADM JO
0.97M 33KV 2C
PL+35.50 56.77 PROPOSED ANTI WW01 26/02/2021 REVISED AS PER ARCHITECTURE MFA ADM JO
FFL. +41.50 SNATCH RAILING (200m)
PERS WW02 29/05/2023 REVISED AS PER MBSA APPROVAL MFA ADM JO
IARA
N SEL
WW02
ANGO
ING 1
R
11
LAND
16
20
ENTRANCE
10
1
BUS
WW02
UP
LAY
766 PROPOSED ANTI-SNATCH
B Y "T
YPE A"
PA87019 RAILING COVERE
CONTINUITY LINE TYPE 1 D WAL
KWAY
CAST INSITU ROAD KERB LAY
TYPE SM3 PROPOSED ANTI-SNATCH B Y "T
YPE
RAILING PUI
PUI
WW02 A"
Designed By : AIMAN
PUI
Drawn By : WAN
Checked By : ADAM
765 1 LAYOUT PLAN (ROADWORK) 766 Approved By : IR. JOHARI ABU BAKAR
00-00-00 )1CAD
(C
O
NW2.0202032file
.W O --Lno
-PLR
D
W C 1TS-:5G
I -4N 0SM
G
-R
C
B
K-3R
TLV
K
Scale : 1 : 500 (A1) 1 : 1000(A3)
Date : 29/05/2023
4.99 m Drawing Title :
SCALE 1 : 500 (A1) 1 : 1000 (A3) NOTE: THIS DRAWING SHALL BE SUBJECT TO CHANGES AS PER TERMS, CONDITIONS AND / OR APPROVAL OF THE RELEVANT AUTHORITY
ISSUED FOR CONSTRUCTION Drawing No :
KVLRT3-MRCBGK-GS05-STN14-CIL-RDW-LOP-230202
Rev
WW02
C:\USERS\WILLIAM.LIEW.MRCBGK\DOWNLOADS\KVLRT3-MRCBGK-GS05-STN14-CIL-RDW-LOP-230202.WW02.CON (1).DWG ; 02-May-24 ; 15:43:10 ; PLOTTED BY : WILLIAM LIEW WEI LEONG