RencanaJaringanV3 - EMY NURYANI
RencanaJaringanV3 - EMY NURYANI
RencanaJaringanV3 - EMY NURYANI
Total
List cost
Biaya Total Pembelian al Rp 1,675,074,000
Biaya Pemasangan/installasi
@Jumlah titik : 280
@ Biaya Installasi / titi Rp 75,000
@Total Biaya
Pemasangan: Rp 21,000,000
Biaya Total
Pembangunan Jaringan
Komputer Rp 1,696,074,000
Dual Band Access Point (2.4 GHz & 5 GHz) UBIQUITI Unifi
1x Gigabit LAN Port UAP-nanoHD
Data Rates : 300 Mbps (2.4 GHz) & 1733 (5 GHz)
4x4 MU-MIMO
PoE Mode: 802.3af PoE
Unit Utama
24 Rp345,672,000
HP All-in-One
22-c0031l
PROLINK PROLINK 8-Port PROLINK 8-Port 8 15,920,000
Switch Gigabit PoE Gigabit PoE Switch
Unmanaged Switch PSG801P PSG801P
PSE2410M
PRINTER EPSON L6170 EPSON L6170 51,504,000
EPSON L5190
Rp 1,675,074,000
Rencana P
Staff
R5 192.168.11.1 192.168.11.0 255.255.255.0
192.168.11.2 192.168.11.0 255.255.255.0
192.168.11.3 192.168.11.0 255.255.255.0
192.168.11.4 192.168.11.0 255.255.255.0
aringan
Network Netmask
20
12
12
12
12
12
24
116
Tabel Perencanaan Bandwidth Minimal
Jumlah
No Network Gedung/Ruangan Bandwidth/user(
Komputer
1 Lab1 ELIN 12 PC komputer)
1024 Kbps
Lab2 TKJ1 24 PC 1024 Kbps
Lab3 TKJ2 12 PC 1024 Kbps
Lab 4 RPL1 12 PC 1024 Kbps
Lab5 RPL2 12 PC 1024 Kbps
Lab6 AV 12 PC 1024 Kbps
Lab7 MM 12 PC 1024 Kbps
Total bandwidth
1 Jaringan Lab 98,304 98.304 Mbps
Total Bandwidth
2 Jaringan staff 24,576 25 Mbps
Total Bandwidth
Guest (Simultan)
3 51,200 51 Mbps
24,576 Kbps
51,200 Kbps
174,080 Kbps
Mbps
PERENCANAAN PENGKABELAN
Standar Konfigurasi
Jenis Konfigurasi Jumlah
Jenis Kabel Kabel Yang digunakan
Kabel (meter)
pilih : (T568A/T568B)