FENCING PERMIT
APPLICATION NO. FP NO. BUILDING PERMIT NO.
LOCATION OF CONSTRUCTION: LOT NO.________ BLK NO. __________ TCT NO. ______________________________ TAX DEC.NO. _______________________________________________________
SCOPE OF WORK
BOX 2 BOX 3
DESIGN PROFESSIONAL PLANS AND SPECIFICATIONS FULL TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS
____________________________________________________ ____________________________________________________
(Signature Over Printed Name) (Signature Over Printed Name)
Date: _________________ Date: _________________
Address Address
C.T.C No. Date Issued Place Issued: C.T.C No. Date Issued Place Issued:
BOX 5
Whose signatures appear hereinabove, known to me to be the same person who executed this standard prescribed form and acknowledged to me that the same is their free and voluntary act and deed.
WITNESS MY HAND AND SEAL on the date and place above written.
PROGRESS FLOW
IN OUT
PROCESSED BY
DATE TIME DATE TIME
CIVIL/STRUCTURAL
ELECTRICAL
OTHERS (Specify)
ASSESSED FEES
FENCING
OTHERS (Specify)
TOTAL
ACTION TAKEN:
1. That under Article 1723 of the Civil Code of the Philippines the engineer or architect who drew up the plans and specifications is liable for damages if within (15) years from
the completion of the structure, it should collapse due to defect in the plans or specifications or defects in the ground. The engineer or architect who supervises the construction
shall be solidarity liable with the contractor should the edifice collapse due to defect in the construction or the use of inferior materials.
2. That the proposed construction /erection/addition, etc. shall be in conformity with the provisions of the "National Building Code” (PD 1096) and it’s implementing Rules and
Regulations.
a. That prior to commencement/of the proposed projects and construction of the actual relocation survey shall be conducted by responsible licensed Geodetic Engineer.
b. That before commencing the excavation the person making or causing the excavation to be made shall verify in writing the owner of adjoining building not less than
(10) days before such excavation is to be made and show how the adjoining building should be protected.
c. That the owner of the fence shall engage the services of responsible licensed Architect or Civil Engineer to undertake the Full time inspection and supervision of the
construction work.
d. That there shall be kept at the jobsite at all times a logbook wherein the actual progress of construction including test conducted, weather condition and other pertinent
data are to be recorded, same shall be made available for scrutiny and comments by the OBO representative during the conduct of his/her inspection pursuant to Section
207 of the National Building Code
ALEXANDER N. CANING
ACTING BUILDING OFFICIAL
(Signature Over Printed Name)
Date____________________