Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Hydropompe Impression-Eclairage

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INSTALLATION ECLAIRAGE INTERIEUR ET EXTERIEUR DE L'UNITE

B.R B.R B.R B.R B.R B.R B.R B.R B.R B.R B.R

ATELIER 01
S=57.75 m²

ATELIER 01
S=63.00 m²

ATELIER 02
S=57.75 m²

LOCAL PIECES
DETACHEES
S=14.70 m²

LOCAL PIECES
DETACHEES
S=13.00 m²

VESTIAIRES
SANITAIRE HOMMES
S=21.20 m²

Poste transformateur
S=21.20 m²
B.R B.R B.R B.R B.R B.R B.R B.R B.R B.R B.R

APPROVED BY CLIENT
SIGN : DATE :-

93895

APPROVED BY CONSULTANT
SIGN : DATE :-

PREPARED BY

SIGN : DATE :-

*NOTE - 1)THIS FACILITY IS NON FLAME PROOF & NON ATEX


DESIGN
*NOTE :- ALL DIMENSIONS ARE IN mm .
CLIENT :- M/s. HYDROPOMPES, ALGERIA
B.R DRG. TITLE :- ECLAIRAGE INTERIEUR ET EXTERIEUR

DWG. NO : FTIL-PURLAB-ALGERIA
DWG. BY CHK. BY APP. BY REVISION DATE SCALE
SAID BET BOUA RAHIM R-0 23.08.2022 /

You might also like