112 Remaining Construction Work Schedule-20231206-A
112 Remaining Construction Work Schedule-20231206-A
112 Remaining Construction Work Schedule-20231206-A
23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9
24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Area Person In Site Supervisor
SN. Description Activity Description Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE Construction Team
112 Oil Receiption Unit Area Target MC Completion Date 20231231 Changqingzeng Sun Ying 1/18/2024
1.1 支墩 Pipe Support Fountion Changqingzeng Sun Ying CIV 12/5/2023 12/14/2023
1.2.2 压实、垫层施工 Lean Concrete Changqingzeng Sun Ying CIV 4 12/16/2023 12/19/2023
1.2.3 放线、钢筋 Rebar Work Changqingzeng Sun Ying CIV 3 12/20/2023 12/22/2023
2.2 脱水泵棚 Dehydration Pump Shelter Changqingzeng Li Chengwei Structure 12/25/2023 1/6/2024
2.2.2 泵棚安装完成 Dehydration Pump Shelter Installation Changqingzeng Li Chengwei Structure 6 1/1/2024 1/6/2024
4.1 112脱水泵泵棚内支架及管道安装(12月7日前核实 Pipe support and AG Pipe installation inside 112 Changqingzeng Shi Yanbing PIP 14 12/12/2023 12/25/2023
材料到场情况) Dehydration Pump Shelter
4.2 一、二级分离器周围支架及管道安装(12月7日前 Surrounding Pipe support and AG Pipe Changqingzeng Shi Yanbing PIP 20 12/15/2023 1/3/2024
核实材料到场情况) installation at 1st and 2nd stage separator
5.1 一级分离器底座灌浆 Base foundaiton grouting for 1st stage separator Changqingzeng Lian Junhai EQ 4 12/13/2023 12/16/2023
5.2 二级分离器底座灌浆 Base foundaiton grouting for 2nd stage separator Changqingzeng Lian Junhai EQ 4 12/13/2023 12/16/2023
5.2 换热器底座灌浆 Base foundaiton grouting for Heat Exchanger Changqingzeng Lian Junhai EQ 4 12/13/2023 12/16/2023
6 Electrical and Instrument/Telecom Electrical and Instrument/Telecom Changqingzeng Xi Chunming ELE/INT/TEL 12/13/2023 1/18/2024
CPF-OIL Detail Construction Schedule
23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9
24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Area Person In Site Supervisor
SN. Description Activity Description Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE Construction Team
6.1.1 电缆桥架安装 Cable Tray Installation Changqingzeng Xi Chunming ELE/INT/TEL 4 12/30/2023 1/2/2024
6.1.2 电缆敷设及接线 Cable pulling and Termination Changqingzeng Xi Chunming ELE/INT/TEL 16 1/3/2024 1/18/2024
路灯基础就位(20盏灯),只有示意图,无平面布
6.1.3 置图,需设计现场确定位置,出红线图,12月6日 Lamp Foundaiton put in place(for 20 Lamps) Changqingzeng Xi Chunming ELE/INT/TEL 4 12/13/2023 12/16/2023
现场核实。