CPF-OIL Detail Construction Schedule

23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9

24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Area Person In Site Supervisor
SN. Description Activity Description Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE Construction Team

112 Oil Receiption Unit Area Target MC Completion Date 20231231 Changqingzeng Sun Ying 1/18/2024

1 Civil Civil Changqingzeng Sun Ying CIV 12/5/2023 12/29/2023

1.1 支墩 Pipe Support Fountion Changqingzeng Sun Ying CIV 12/5/2023 12/14/2023

Lean Concrete for Steel Pipe support of 1st and


1.1.1 一二级分离器钢支墩垫层浇筑 Changqingzeng Sun Ying CIV 2 12/5/2023 12/7/2023
2nd stage separator

Pedestal Pouring for Steel Pipe support of 1st and 待管道移交后进


1.1.2 一二级分离器钢支墩柱头浇筑 Changqingzeng Sun Ying CIV 1 12/12/2023 12/12/2023
2nd stage separator 行

1.1.3 回填完成 Backfilling Changqingzeng Sun Ying CIV 2 12/13/2023 12/14/2023

Pipe Support Fountion and Floor Concrete inside


1.2 112脱水泵泵棚内支墩及地坪 Changqingzeng Sun Ying CIV 12/15/2023 12/29/2023
112 Dehydration Pump Shelter

根据目前图纸支墩和地坪同步施工,需核实设计 Changqingzeng Sun Ying CIV 带地管干完

1.2.1 开挖 Excavation Changqingzeng Sun Ying CIV 1 12/15/2023 12/15/2023

1.2.2 压实、垫层施工 Lean Concrete Changqingzeng Sun Ying CIV 4 12/16/2023 12/19/2023

1.2.3 放线、钢筋 Rebar Work Changqingzeng Sun Ying CIV 3 12/20/2023 12/22/2023

1.2.4 模板 Formwork Changqingzeng Sun Ying CIV 2 12/23/2023 12/24/2023

Concrete Pouring(Bottom Foundation and


1.2.5 混凝土(底板和短柱分两次浇筑) Changqingzeng Sun Ying CIV 2 12/25/2023 12/26/2023
Pedestal be Poured twice separately)

Concrete Curing,Formwork removal,Bitumen


1.2.6 养护、拆模、刷漆 Changqingzeng Sun Ying CIV 2 12/27/2023 12/28/2023
Painting

1.2.7 回填 Backfilling Changqingzeng Sun Ying CIV 1 12/29/2023 12/29/2023

2 Structure Structure Changqingzeng Li Chengwei Structure 12/25/2023 1/6/2024

2.1 A2管廊钢格栅、梯子、栏杆 Changqingzeng Li Chengwei Structure 12/25/2023 12/29/2023

Steel Structure Installation for 1st and 2nd stage


2.1.1 一二级分离器钢结构安装(影响管道部分) Changqingzeng Li Chengwei Structure 12/9/2023
separator

Platform installationfor 2 valves of Heat


2.1.2 换热器2个阀门操作平台 Changqingzeng Li Chengwei Structure 5 12/25/2023 12/29/2023
exchanger

2.2 脱水泵棚 Dehydration Pump Shelter Changqingzeng Li Chengwei Structure 12/25/2023 1/6/2024

Crane track and Crane equipment


2.2.1 行车轨道及行车安装(含脚手架) Changqingzeng Li Chengwei Structure 8 12/25/2023 1/1/2024 行车到货
Installation(Include Scaffolding)

2.2.2 泵棚安装完成 Dehydration Pump Shelter Installation Changqingzeng Li Chengwei Structure 6 1/1/2024 1/6/2024

3 UG Piping UG Pipe Changqingzeng Shi Yanbing PIP 12/4/2023 12/11/2023

Surrounding UG Pipe Installation at 1st and 2nd


3.1.1 一二级分离器周围地管安装 stage separator
Changqingzeng Shi Yanbing PIP 3 12/4/2023 12/7/2023

Surrounding UG Pipe Hydrotest at 1st and 2nd


3.1.2 一二级分离器周围地管试压(6个包) stage separator
Changqingzeng Shi Yanbing PIP 3 12/8/2023 12/11/2023

UG Pipe Installation between Dehydration Pump


3.1.3 泵棚与管廊间地管安装 Shelter and Pipe rack A
Changqingzeng Shi Yanbing PIP 3 12/4/2023 12/7/2023

UG Pipe Hydrotest between Dehydration Pump


泵棚与管廊间地管试压 Shelter and Pipe rack A
Changqingzeng Shi Yanbing PIP 2 12/8/2023 12/9/2023

Backfilling for Pipe support foundaiton area


3.1.5 泵棚与管廊间支墩区回填 between Dehydration Pump Shelter and Pipe rack Changqingzeng Shi Yanbing PIP 2 12/10/2023 12/11/2023
A

4 AG Pipe(吋口数) AG Pipe Changqingzeng Shi Yanbing PIP 12/12/2023 1/10/2024

4.1 112脱水泵泵棚内支架及管道安装(12月7日前核实 Pipe support and AG Pipe installation inside 112 Changqingzeng Shi Yanbing PIP 14 12/12/2023 12/25/2023
材料到场情况) Dehydration Pump Shelter

4.2 一、二级分离器周围支架及管道安装(12月7日前 Surrounding Pipe support and AG Pipe Changqingzeng Shi Yanbing PIP 20 12/15/2023 1/3/2024
核实材料到场情况) installation at 1st and 2nd stage separator

换热器周围支架及管道安装,共1700寸,还剩842 Surrounding Pipe support and AG Pipe


4.3 Changqingzeng Shi Yanbing PIP 20 12/22/2023 1/10/2024
寸(12月7日前核实材料到场情况) installation at Heat exchanger area

5 设备 Mechanical Changqingzeng Lian Junhai EQ 12/13/2023 12/16/2023

5.1 一级分离器底座灌浆 Base foundaiton grouting for 1st stage separator Changqingzeng Lian Junhai EQ 4 12/13/2023 12/16/2023

5.2 二级分离器底座灌浆 Base foundaiton grouting for 2nd stage separator Changqingzeng Lian Junhai EQ 4 12/13/2023 12/16/2023

5.2 换热器底座灌浆 Base foundaiton grouting for Heat Exchanger Changqingzeng Lian Junhai EQ 4 12/13/2023 12/16/2023

6 Electrical and Instrument/Telecom Electrical and Instrument/Telecom Changqingzeng Xi Chunming ELE/INT/TEL 12/13/2023 1/18/2024
CPF-OIL Detail Construction Schedule

23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9

24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Area Person In Site Supervisor
SN. Description Activity Description Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE Construction Team

6.1.1 电缆桥架安装 Cable Tray Installation Changqingzeng Xi Chunming ELE/INT/TEL 4 12/30/2023 1/2/2024

6.1.2 电缆敷设及接线 Cable pulling and Termination Changqingzeng Xi Chunming ELE/INT/TEL 16 1/3/2024 1/18/2024

路灯基础就位(20盏灯),只有示意图,无平面布
6.1.3 置图,需设计现场确定位置,出红线图,12月6日 Lamp Foundaiton put in place(for 20 Lamps) Changqingzeng Xi Chunming ELE/INT/TEL 4 12/13/2023 12/16/2023
现场核实。

6.1.4 照明 Lighting Fixtures Changqingzeng Xi Chunming ELE/INT/TEL 3 12/14/2023 12/26/2023