1. All form works and shuttering in any form, shape and size.
Making chamfered and curved edges, allowing for and making
grooves and sleeves and the like; removal of forms and cleaning of
all exposed tie wires and rods; making good the harmed surfaces
and edges and all surface finishing.
The columns necks shall be measured from the top level of the
foundation or footing to the bottom level of the tie beam.
(All beams, drop beams, projection including sun breakers and any
part casted together with the slab shall not be measured and is
deemed to be included in the price of the slab).
Columns are to be measured from the top level of the slab to the
bottom level of the beam or dropped beam.
2) Concrete Block works
Supply and Build Concrete Block Walls, 'Grade 35’ of any size
blocks.
4) Carpentry
Supply and Cast Reinforced Concrete Grade 'B 300' 27.5 7’150.-
Supply and Cast Reinforced Concrete Grade 'B 300' for: 8 2’240.-
a) Center Window Jambs.& shear wall around the main doors for the
houses
b). Column portions. (Necks). 0 0.-
Supply and Build Concrete Block Walls, 'Grade 35’ of any size blocks.
a. Hollow Blocks (7 Ten) cm. Thick 50 600.-
b. Hollow Blocks (10 Ten) cm. Thick 12 420.-
c. Hollow Blocks (20 twenty) cm. Thick for internal partitions, 12 192.-
parapets and external stair case walls at roof or where required.
TOTAL CARRIED TO SUMMARY 1’212.-
Supply and Install Local Marble Sills, Thresholds, and wherever needed 3 cm. thick).
Set in cement mortar bedding price to include grouting, polishing of face and seen edges.
Supply and Install Local Marble Sills, Thresholds, copping for parapet and wherever needed (3 cm. thick).
Set in cement mortar bedding price to include grouting, polishing of face and seen edges.
Supply, fix and operate sliding Aluminum Windows (with 3 paths for external windows and 2 paths for
internal ones) extrusion Section 7700 or equal, with protective electrostatic applied polyester powder
paint of 70-80 microns. In color approved by the Engineer.
Price to include, 6 mm. Float glazing and all other accessories and fittings to complete works as per
specifications.
Supply and Install Protection Steel Grills ,Price to include fixation, accessories, welding, grinding &
smoothening.
Price include oil painting three coats in addition to two primer coats for windows & corridor external
opening in the ground floor.
a. Windows 20 900.-
b. For corridor external opening (in ground and first floor it is for the
full window area)
a. Stairs Handrails of 60x40x4mm hollow steel profile and 14x14mm 21 945.-
Supply and Install Protection Steel Grills ,Price to include fixation, accessories, welding, grinding &
smoothening.
Price include oil painting three coats in addition to two primer coats for windows & corridor external
opening in the ground floor.
5) Carpentry work
2) Work to be done to make the site accessible to people with wheelchairs or with
disabilities.
Reminder : the number of people with disabilities is estimated at around 300 persons, including
are under the age of 18 and have no access to health and social services.
Item Number
1. Sensory Play Interactive Ball Pool 1
3. Hopscotch Panel. 1
4. Sound Wall 1
5. Wheel chair 5
6. Medical mattress 5
7. Medical bed 3
8. Suction unit 3
9. Crutch 7
10. Walker 10
2) Painting and decorating to walls, ceilings and the like shall Painting works.
be measured net in meter square.
Painting to other works shall be included in the related
items. Color as specified by engineer.
Paints shall be supplied to site in sealed container, as
approved by the Engineer, and site mixing shall not be
permitted.
The Contractor rates shall include for supply of all materials,
workmanship, samples, primers, surface preparation,
protection of painted surfaces, application to all heights as
required of works, repair of all damaged surface at the
contractor’s expenses, and all other requirements as stated
in the Specifications.
3) Electrical works.
4) Plumbing,
sanitary.
Solutions Quantity Costs (EUR)
1) Plastering
2) Painting works
Supply and paint high quality emulsion Added the number of the house 1’629.-
paint, for walls as per indicated in
finishing tables, on one priming coat and
two finishing coats, using two coats of
complete putty, as per satisfaction of the
supervisor engineer.
Ditto, but matte oil paint. Added the number of the house 6.-
Supply & paint three coats of external Added the number of the house 1’575.-
quality waterproofing supercryl paint for
internal Staircase walls, corridor parapets
& walls, external walls and windows’