Enterprenuer
Enterprenuer
Enterprenuer
REG NO NAME
22220694 HARIHARA SUDHAN P
BONAFIDE CERTIFICATE
INTRODUCTION
MANUFACTURING PROCESS
INSPECTION AND QUALITY CONTROL
INFRASTRUCTURE
PRODUCTION CAPACITY & POLLUTION
CONTROL
FINANCIAL ASPECTS
SUPPLIERS OF MACHINERY
INTRODUCTION
This Enterprise is a proposed micro enterprise for
the manufacture of Palm plates. It is a sole proprietary concern.. Now a day the
importance of biodegradable materials is very high since polyethylene wastes poses
severe threat to the universe. The disposable plates and food packing materials
manufactured from easily available areca nut palm leaves is a better substitute for
disposable polythene and paper plates. The Govt. is restricting the use of plastic materials
and hence eco-friendly products are preferred to plastic products. There is an ever
increasing demand for these items. Keeping this in mind, the promoter has ventured this
unit..
MANUFACTURING PROCESS
Our products are manufactured from fallen dry sheaths of Betel nut trees. The areca
sheath when dried will fall from the tree and it is collected from the farms fresh and used
for making products. These sheaths are available in plenty in the South India region. The
usage of these leaves was started from our ancestors. We are only making them into
attractive shapes to meet the different customer requirements.
INSPECTION AND QUALITY CONTROL
Plant will strictly adhere to the International FDA standards and Indian BIS standards in
the process of manufacturing Palm plate from procuring high quality food grade raw
b) Water: Water is required for soaking, cleaning and general purpose and it is available
in plenty near to the site.
d) Labour: A total of 3 workers are required in addition to the promoter. All these
skilled and unskilled workers can be recruited locally.
1. The proposed unit is rated for a production capacity of 31,250 pieces per month on
single shift basis. The expected capacity utilization is 80%, for the 1st and 90%
from the 2nd year onwards.
PLUMPING ITEMS
Total
Sl.No. Item Quantity Price/unit Vat
cost
TOTAL 26250
RAW MATERIAL REQUIREMENTS (PER MONTH)
Value for 1
Sl.No. Item Quantity Rate Value/month
year<strong>
1 Areca nut leaves 10,000 0.5 5000 60000
Total 5000.00 60000.00
Total Raw materials
5000.00 60000.00
required
2. Rent : 3000
5. Insurance : 2000
Total 46924
TOTAL CAPITAL
Sources of Funds :-
Total:487479.00
TURNOVER PER ANNUM
Total 58000.00
2 Salary/Wages 24,000.00
3 Utilities 7,000.00
Total 40,623.25
Profit per Year:Cost of production per year - sales recipt per year 208521.00
Tax 30 %:62556.00
Fixed cost:104479.00
Variable Cost:378000.00
BEP in %ge:32.86
ie, DSCR:1.92
---------------------------=20.97
Annual Turnover
Total Investment
44.13
SUPPLIERS OF MACHINERY
1. Magnus coimbature
Mobile : +91 9944422522
: +91 95885559502
Hydraulic based Automatic machine and Flywheel type Manual machine.