Domestic & Oversea Units by SEC- Energy Saving Retrofit/Single Unit Retrofit/Overhauling/Spare Parts/O&M/Unit
Relocation/Technical Service…
Domestic Units not by SEC - + Environmental
Retrofit Retrofit/Overhauling/Spare Parts…
Imported Units - Retrofit/Overhauling/Spare Parts件…
Unit Overhauling Full Unit Retrofit & Full Unit Retrofit &
Overhauling Overhauling
Environmental Retrofit, Energy Saving Retrofit, Overhauling, Spare Parts, O&M, Unit Relocation and Tech. Service Time Line
Conceptual Diagram of Whole Life Cycle Service for Thermal Power Plant Equipment by SEC
(Finance Lease Service can be supplied per Customers’ Requirement)
SEPGSC & Main Products
Turbine Extraction & Air Preheater Spare Parts for Maintenance Unit Relocation
Jointly Reverse
Heat Supply Retrofit Retrofit Overhauling Service
Turbine High Back
Flue Gas De-NOx Long Term Service Associated
Pressure Heat Equipment Repair Guidance on O&M
Retrofit Agreement Equipment
Supply Retrofit
Turbine Steam Flue Gas De- Long Term Service
Package Service Emergency Repair Agreement for One Finance Lease
Sealing Retrofit sulpurization Retrofit
Operation Period
Special
Cold End Super Low Emission Subcontracting
Technological Remote Diagnosis
Optimization Retrofit ESP Retrofit Service
Retrofit
Wide Load Range De-NOx Retrofit at EPC for Unit
Technical Training
Heater Retrofit Wide Load Range Overhauling
SEC Solutions
Boiler Flue Gas Cooler LLT ESP ID Fan FGD Wet Type ESP Stack
Flue Gas Heater
Absorber’s
DeNOx be ESP specification
Dust collecting
considered inside & designed
ability be made
outside the furnace reasonably
fully
Overall goal: By 2025, the average coal consumption for thermal power in China will be reduced to below 300g/kW.h (standard coal)
Retrofit for Energy Saving and Retrofit for Improving Flexibility Retrofit for Heat Supply
Consumption Reduction
Flexibility of existing coal-fired units should be Encourage coal-fired power generation
Accelerate the creation of conditions to
Target implement energy-saving retrofit
improved to the fullest extent possible to replace heat supply
◆ 200 million kW ( completed 20% by the end ◆ The renovation scale aims to reach 50
◆ Not less than 350 million kW, with an
of the 13th Five Year Plan), with an average million kW, with an average annual
average of 70 million kW per year.
annual capacity of 32 million kW. output of 10 million kW.
◆ For subcritical unit, steam temperature ◆ The low load requirement is 35% of the rated ◆ The condensing units shall be retrofitted
Measure increase, flow path retrofit, cold end load for condensation units, and 40% for heat for heat supply, expand the demand for
optimization, deep utilization of waste supply units. centralized heat supply, and optimize
heat, and clean utilization of coal-fired the operation of Cogeneration units.
power.
a) Turbine Flow Path Retrofit or Turbine Flow Path Retrofit + Steam Parameter Increase
Effect Estimation (g/kW.h)
Retrofit Scope (Based on coal consumption before major repairs,
different power plants have different levels)
—— When the system’s save energy retrofit is also made, further 2-3 g/kW.h can be reduced.
2.2 Technologies in “Jointly Implementation of 3 Kinds of Retrofit” to be Applied
Shanghai Electric’s achievements are 150 sets of integrated complete steam turbine flow path retrofit (including 14
sets with steam parameter increase)
No. Name Unit Class Temp. Increase Year Note
1 #11 & #12, Jianbin Sub-C 330MW 543℃/565℃ 2018
2 Turbine scope HP, IP, LP cylinders &associated sys. 2 Turbine scope Whole retrofit except for LP outer cylinder
1 Storage Energy
2 Co-firing Biomass
3 Other
3.1 "Coal-Fired Power + Storage Energy" Technologies
Performance Presentation - Typical Project Cases of Energy Storage on the Power Generation Side
Project Overview:
Shanghai Electric signed an EMC contract with Zhangjiagang Shazhou
Power Plant and undertook the EPC project. This system collaborates with
Shazhou Power Plant's 1 and 2 thermal power units to carry out AGC Other typical projects:
frequency regulation business, significantly improving the AGC regulation Dapu coal-fired,18MW/9MWh Frequency Regulation Project
performance of Shazhou Power Plant's 1 and 2 units, providing high-quality Yangx cola-fired 26MW/13MWh Frequency Project
and efficient AGC frequency regulation services for Jiangsu Power Grid, and Qinghai 32MW/64MWh Grid Side Share Demonstration
obtaining regulation compensation. The project is a 17.5MW/17.5MWh energy Project
storage auxiliary frequency modulation system based on Lithium iron Jinzhai 100MW/200MWh Grid Side Demonstration Project
phosphate battery technology. Kunshan Industrial Park 2MW/8MWh User Side Project
Shantou 1MW/1MWh Wind Power Demonstration Project
……
3.2 Co-firing biomass
01
Direct Co-firing
02
Indirect Co-firing
03
Parallel Co-firing
p Co-firing on the combustion p Biomass is gasified first p “Mixed combustion" on the steam
side p Biomass gas is injected into side
p Crush biomass and inject it a coal powder boiler p Biomass is burned in a separate
into a coal powder boiler through a dedicated boiler, and the generated steam is
through an existing coal biomass gas burner. incorporated into the steam pipe
powder burner or a network of the coal-fired boiler to
dedicated biomass burner. achieve power generation.
p Direct Co-firing
◆ Biomass pellet
✓ Hisar(2600MW) --- Scheme design stage
✓ Yamuna Nagar(2300MW) --- Scheme design
stage
◆ Raw biomass
✓ Dangtu(1600MW) --- 20t/h, contract is being
negotiated
p Indirect Co-firing
◆ Shanghai Electric has a complete set of technical solutions and
participated in bidding for multiple projects. The product series
includes 10MW, 20MW, and 30MW, waiting for the projects.
3.3 “Coal-Fired + Other”Technology
● Customer:
Shanghai Electric Machinery Factory
Smart Energy Project
● Installation capacity::
2.3MW(PV)+12MWh(Storage
Energy)+10kW(Wind Power)+Charging
station
● COD:
Dec. 2019
5.6 Blending biomass
coal
Coal grinding Pulverized coal 锅炉
machine
burner
A B
C
biomass biomass biomass burner
mill
Crusher
conveyor belt
Roots blower