Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

3 Hours / 70 Marks: Seat No

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

22585

12223
3 Hours / 70 Marks Seat No.

Instructions – (1) All Questions are Compulsory.


(2) Answer each next main Question on a new page.
(3) Illustrate your answer with neat sketches wherever
necessary.
(4) Figures to the right indicate full marks.
(5) Assume suitable data, if necessary.
(6) Mobile Phone, Pager and any other Electronic
Communication devices are not permissible in
Examination Hall.

Marks

1. Attempt any FIVE of the following: 10


a) State the need of automation.
b) Draw the symbol of the following :–
i) Push button
ii) Limit switch
iii) Proximity switch
iv) Pressure switch.
c) Give any two relay type instructions with their symbol.
d) List the types of comparison instructions used in PLC.
e) List any four applications of SCADA.
f) State the I/O module selection criteria w.r.t. PLC.
g) List different editors used in SCADA.

P.T.O.
22585 [2]
Marks
2. Attempt any THREE of the following: 12
a) Compare fixed and programmable Automation on any four
points.
b) Explain Redundancy in PLC with suitable diagram.
c) Draw a neat block diagram of PLC and explain the function
of CPU and memory.
d) Draw a symbol of ON delay timer instruction. State the function
of the following:–
i) Enable bit
ii) Done bit
iii) Timer timing bit

3. Attempt any THREE of the following: 12


a) Compare PLC and SCADA on any four points.
b) List different types of industrial automation and explain them.
c) State the function of each block of analog input module with
block diagram.
d) Explain PLC programming scan cycle.
e) Draw a ladder diagram for ON/OFF temperature control.

4. Attempt any THREE of the following: 12


a) Draw a neat block diagram of SCADA system and explain its
parts.
b) Describe automation hierarchy in detail.
c) Explain special I/O modules used in PLC.
d) Write a PLC ladder program for two motor sequence control
system having following conditions.
i) Start push button, starts motor M1.
ii) After 15 sec. motor M1 is off and motor M2 is ON.
iii) After 5 sec, motor M2 is OFF.
iv) Stop push button, stop both motors M1 and M2 if pressed
any time during process.
e) Explain with neat sketch concept of sinking and sourcing with
PLC.
22585 [3]
Marks
5. Attempt any TWO of the following: 12
a) State the types of programming Languages and explain any
two.
b) State the function of PLC memory w.r.t. types and speed of
execution.
c) Develop a ladder diagram program for stepper motor control.

6. Attempt any TWO of the following: 12


a) Explain count up (CTU) instruction with timing diagram.
b) Describe the steps involved in developing SCADA application
with simple system.
c) Explain the working of PLC based bottle filling system with
the help of Ladder diagram.

You might also like