A) Inflammation.
D) All
E) None
ANSWER: E
____________ is concerned with mental processes, such as perception, memory, reasoning, and
motor response, as they affect interactions among humans and other elements of a system.
B) Anatomical
C) Organizational ergonomics
D) All
E) None
ANSWER: E
B) Percentile Humans
C) Seating Design
E) None
ANSWER: D
A) Geometric programming
B) Stochastic programming
C) Calculus method
D) Marcov chains
E) All
F) None
ANSWER: F
_______________is a work measurement technique whereby times established for basic human
motions (reach, grasp, and move) are used to build up the time for a job at a defined level of
performance.
A) Time Study
B) Work Sampling
D) Standard Data
ANSWER: A
___________is the upper limit on the percentage of defectives that a customer is willing to
accept?
ANSWER: A
__________is the allowed time which is determined to be necessary for a quality worker
working at a pace which is ordinarily used under capable supervision and experiencing fatigue to
do a defined amount of work of specified quality when following the prescribed method
B) Observed Time
C) Standard Time
D) Allowances
ANSWER: D
37. Which of the following is usually NOT used for the facility location method?
B) Transportation method
D) Break-even analysis
ANSWER: C
38. The systematic layout planning (SLP) is a tool used to arrange a workplace in a plant by
A) locating two areas with high frequency of material flows close to each other.
B) locating two areas with more area coverage close to each other.
C) locating two areas with less area coverage close to each other
ANSWER: A
A bottleneck is
A) a work center that has the least number of jobs flowing through it.
D) a work center that has less capacity than prior and following work centers.
ANSWER: D
ANSWER: D
ANSWER: D
A maintenance department of shoe manufacturing company has the following recorded data:
total number of annual hours (TAH) = 1,500 h, benefit ratio (BR) = 0.2, hourly labor rate (LR) =
$10 per hour, number of employees (N) = 35 Calculate the total labor cost associated with the
maintenance activity.
A) $530,000
B) $630,000
C) $650,000
D) $756,000
ANSWER: B
A) Nonlinear programming
B) Game theory
C) Integer programming
E) All
F) None
ANSWER: F
A technique of designing a process layout and is used when quantitative data is available.
A) CORLAP
B) ALDEP
C) CRAFT
D) BLOCK diagram
ANSWER: D
A) 608.26 h
B) 708.26 h
C) 668,26 h
D) 508.26 h
ANSWER: A
Both architect and engineer make use of the cost estimate of the project:
ANSWER: D
A) Infinite cost
C) Life cost
D) Project cost
ANSWER: B
Control charts for central tendency and the variability are called _________ control charts.
A) Variables
B) Attributes
C) Acceptance
D) Rejections
ANSWER: A
B) Strategic Planning, Demand Planning, Supply Planning, Fulfillment and Field Service.
D) All.
ANSWER: C
D) All.
ANSWER: A
A) Performance
B) Reliability
C) Durability
D) Features
ANSWER: A
Factor that not prevent Successful Implementation of Computer based maintenance management
system is.
A) Poor Communications,
B) Lack of Expertise
C) Appropriate Expectations
A) Value = Service/Cost
B) Value = Performance/Cost
C) Value = Aesthetic/Cost
ANSWER: B
C) Two symbols are used these are vertical for operation and horizontal introducing materials.
D) Five symbols used these are operation, transportation, inspection. delay and storage
ANSWER: B
ANSWER: C
A) Random
B) Normal
C) Attribute
D) Assignable
ANSWER: A
If the Cpl of a safety-related parameter, is 0.69, what can we say about the process capability?
A) Process is capable
ANSWER: B
A) First defects are identified and then the corresponding effects on working of product is
determined
B) First defects in a product are identified and then, the corresponding causes are discovered
C) First causes of defects are plotted then the effects of them, i.e. defects are identified
ANSWER: B
In exponential smoothing, the closer alpha is to _________, the greater the reaction to the most
recent demand.
A) -1
B) 0
C) 1
ANSWER: C
In many practical situations the attributes of a system randomly change over time.
A) Linear programmimg
B) Mathematical model
C) Queueing theory
D) Simulation methods
E) All
F) None
ANSWER: F
B) Strategic Planning, Demand Planning, Supply Planning, Fulfillment and Field Service.
D) All.
ANSWER: B
It was argued by ___________ that the worker participation is the key to the success of Total
Quality Management.
A) P B Crosby
B) A Feigenbaum
C) W E Deming
D) D. K Ishikawa
ANSWER: C
ANSWER: D
Manual material handling places strains on both ____________ and _____________ systems.
D) All except B
E) None
ANSWER: A
D) None.
ANSWER: C
ANSWER: A
D) Ensuring that the eventual design of a product or service meets customer needs
ANSWER: D
Quantities that can be numerically measured, can be plotted on a _________ control chart.
A) X bar
B) P chart
C) C chart
D) np chart
ANSWER: A
A) Scrap value
B) Going value
C) junk value
D) Second-hand value
ANSWER: D
A) Open communication
B) Empowerment
C) Prevention
D) Control of staffs
ANSWER: D
B) Strategic Planning, Demand Planning, Supply Planning, Fulfillment and Field Service.
D) All.
ANSWER: A
Supply Chain Driving forces and Obstacles. (which one is not true?)
A) The driving forces are those forces that provide threat for the operation of supply chain
Management
B) The obstacles are the restraining forces that challenges and act as a barrier to the operation of
supply chain management.
C) Supply Chain Management is shaped by the constant interplay of driving forces and
obstacles.
D) All.
ANSWER: A
D) All.
ANSWER: D
ANSWER:
The event of a specification not satisfied at one point of a product, is called ____________
A) Nonconformity
B) Non-defectiveness
C) Un-specification
D) Non-specification
ANSWER: A
The job should be selected for the method study based upon what considerations?
ANSWER: A
The lower the value of the ________, relative to the magnitude of the data, the more accurate the
forecast.
A) forecast accuracy
B) MAD
C) forecast mistake
D) forecast error
ANSWER: B
The number of defects per unit of a casting process output, is plotted on _____________ chart.
A) x bar
B) s-chart
C) u-chart
D) p-chart
ANSWER: C
The Petroco Service Station has one pump for regular unleaded gas, which (with an attendant)
can service 10 customers per hour. Cars arrive at the regular unleaded pump at a rate of 6 per
hour. Determine the average queue length, the average time a car is in the system, and the
average time a car must wait. If the arrival rate increases to 12 cars per hour, what will be the
effect on the average queue length?
A) Lq = 0.9, W = 0.25 hr., Wq = 0.15 hr, and an infinite queue would form.
D) A & B
E) All
ANSWER: D
The purpose of supply chain management is
D) increase production
ANSWER: A
The scientific approach to decision making requires the use of one or more__________
A) Model
B) Linear programming
C) Graphical method
D) Simplex method
E) All
F) None
ANSWER: F
ANSWER:
The size of sample is 5 for a process. If the process standard deviation is 0.15 micron, and the
mean of process is 1.5 micron, the standard deviation of the sample average will be _______
A) 0.0500
B) 0.1000
C) 0.6710
D) 0.0671
ANSWER: D
The term supply management is broader than the purchasing function because it:
A) includes marketing
B) includes operations/production
ANSWER: C
There are many techniques which can be used for documenting processes or blueprinting, all
have two main features:
B) Determine the overall shape of the product or service and the way in which the product or
service operates.
C) Specify the component products and services and define the processes to create the package.
D) Show the flow of materials/people/information through the operation and identify the
different activities that take place during the process.
ANSWER: D
To ensure the quality of their machines and equipment, organizations need to focus on:
D) Cost incurred
ANSWER: B
To evaluate the preventive maintenance program which of the following formula is used?
ANSWER: C
Total productive maintenance approach has the potential providing almost seamless integration
between
D) All
ANSWER: C
A) How questions from left to right and why question from right to left.
B) What questions from left to right and why question from right to left.
C) When questions from left to right and why question from right to left.
D) Where questions from left to right and who question from right to left.
ANSWER: B
C) Major function of the item and accomplishing the same at least cost without change in
quality.
ANSWER: D
What are logistics five key issues especially critical with global logistics.
D) All
ANSWER: A
What are the three factors take into consideration when we make work measurement?
D) None
ANSWER: B
What is defined as the reduction of the value of certain natural resource such as mines, oil,
timber, etc. due to the gradual extraction of its contents?
A) Depletion
B) Inflation
C) Depreciation
D) Deflation
ANSWER: A
What is MOST?
ANSWER: A
What is one of the most important overlaps in the whole process of bringing new products and
services to market?
A) Between creating the design and designing the process that will produce it.
C) a CR of greater than 1.0 means that the job has some slack.
ANSWER: C
ANSWER: A
Which among the following is a computerized system that controls the kind of items to be
purchased and also decides on the quantity that needs to be purchased?
ANSWER: B
Which among the following is the objective of the Enterprise Resource Planning system?.
Which comes first, the material handling system or the facility layout?
ANSWER: B
Which is the correct order for process types starting with low volume/high variety and moving to
high volume/low variety?
A) Project processes, jobbing processes, batch processes, mass processes, continuous processes
B) Batch processes, project processes, jobbing processes, mass processes, continuous processes
C) Jobbing processes, batch processes, mass processes, continuous processes, project processes
D) Project processes, batch processes, mass processes, jobbing processes, continuous processes
ANSWER: A
Which of the charts are more efficient to find out variability in the data when the sample size is
more than 10?
A) R-chart
B) c-chart
C) s-chart
D) p-chart
ANSWER: C
Which of the following explain the need for facility location selection?
A) When the existing business unit has outgrown its original facilities and expansion is not
possible.
C) When the lease expires and the landlord does not renew the lease.
D) All of these.
ANSWER: D
ANSWER: C
A) ISO-9000
B) ISO-14000
C) ISO-26000
D) ISO-31000
ANSWER: B
ANSWER: E
A) transportation method
ANSWER: B
Which of the following is not among the chief reasons organizations fail?
ANSWER: B
A) Market surveys, suggestions from customers and actions of competitors are all external
sources for concept generation.
B) Ideas from research and development, suggestions from customer contact staff and actions of
competitors are all internal sources for concept generation.
C) The marketing department are involved in collecting both internal and external sources of
information for concept generation.
ANSWER: B
ANSWER: D
A) Outsourcing is increasing rapidly in not just materials, many business functions are being
outsourced
B) Outsourcing should be used for all materials when suppliers are available
C) Outsourcing can enable leveraging of the supplier's expertise and increases in innovation
ANSWER: B
Which of the following is not typically considered a cure for poor competitiveness?
E) Improve quality.
ANSWER: B
Which of the following is the first step in making a correct location choice?
ANSWER: B
ANSWER: C
Which of the following tool is used to visualize the amount of movement that occurs between
departments in a plant?
A) Transportation method
B) Linear Programming
C) Block diagram
D) Flow diagram
ANSWER: C
ANSWER: C
ANSWER: D
A) Pareto chart
B) Check Sheet
C) Scatter Diagram
D) 2k factorial design
ANSWER: D
ANSWER: C
A) If assignable causes are present, the chances of difference between subgroups should be
largest
B) If assignable causes are present, the chances of difference between subgroups must be lowest
C) If assignable causes are present, the chances of difference between the subgroups must be
moderate
D) If assignable causes are present, the chances of difference between the subgroups must be
zero
ANSWER: A
Which one is not true about Process view of supply chain by Push/Pull View.
ANSWER: D
A) Automation
B) Lubrication
C) Machine breakdown
D) Condition monitoring
ANSWER: B
ANSWER:
A) PERT is a technique of planning and control of time. Unlike CPM is a method to control
costs and time.
D) None
ANSWER: D
A) In a pure strategy game, each player adopts a single strategy as an optimal strategy.
B) A pure strategy game can be solved according to the minimax decision criterion.
C) A point of equilibrium is a value that is simultaneously the minimum of a row and the
maximum of a column.
D) A pure strategy game occurs when each player selects an optimal strategy that does not result
in an equilibrium point when the minimax criterion is used.
E) C & D
F) All except A
ANSWER: E
B) Mixed plans seek a minimum cost via a combination of eight planning options.
B) motivation of workers
ANSWER: A
Years ago in the overnight delivery business, providing package tracking capability gave some
firms a competitive advantage. Now, all firms must offer this capability simply to be in this line
of business. This is an example of ______________ becoming ____________ over time.
ANSWER: C