Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

TECHNICIAN1 Merged

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Y1 Y2 Y3 Y4 Y5 Y6 Y7

B-B
X1 X2 X3 X4 X5 X6 X7 X8 X9 X9 X8 X7 X6 X5 X4 X3 X2 X1
12.00
3.00 3.00 3.00 3.00
W W W W W W
1 1 2 1 1 1
X1 D
2

W FEMALE STORAGE
1 KITCHEN W
DORM 1
D

1.80

1.80
DINING
2 AREA
X2
W D
D
3
2 W

D
3

5.30

5.30
FEMALE SHOWER
X3 & TOILET W
1
W 1
D
3

3.30

3.30
3
X4 PHYCOLOGY FISH HEALTH
W LAB LAB D
D
3

3 2 W W W W W W W W W W D W W
MALE SHOWER 1 3 3 3 3 1 3 3 1 1 2 1 1
X5

0.20

0.20
& TOILET
D
3

0.85
D
3

3
X6 TRAINING CENTER/
W W PACKAGE AREA
D 1 1 @ TECHNICIAN'S QUARTER @ TECHNICIAN'S QUARTER
C-C W
2
X7
W
1
MALE
DORM
D
2
1 02 LEFT ELEVATION 02 RIGHT ELEVATION
SCALE (A-1) 1:100M SCALE (A-1) 1:100M
A 03 SCALE (A-3) 1:200M A 03 SCALE (A-3) 1:200M

D LOBBY
X8 2
W FEMALE CR
D

W
3

3
1
OFFICE
W
D
3

3 MALE CR
X9
W W W D
3 1 1 1 Y1 Y2 Y3 Y4 Y5 Y6 Y7

@ TECHNICIAN'S QUARTER & TRAINING CENTER

02 FLOOR PLAN
SCALE (A-1) 1:100M
A 03 SCALE (A-3) 1:200M

0.80 0.70 1.40 1.80 0.60


1.40
DIV INTO 2 EQ. PANELS DIV INTO 2 EQ. PANELS DIV INTO 3 EQ. PANELS

1.80
SEE TRUSS
DETAIL

0.50

0.50

5.30
1.20

3.30
2.10

2.10

2.10

MALE W W D W

0.85
DORM KITCHEN 1 1 2 1

1.65

1.65

0.20
D D D W W W
0.95

1 2 3 1 2 3
@ TECHNICIAN'S QUARTER & TRAINING CENTER

02 LONGITUDINAL SECTION
SCALE (A-1) 1:100M
A 03 SCALE (A-3) 1:200M

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y7 Y6 Y5 Y4 Y3 Y2 Y1 X9 X8 X7 X6 X5 X4 X3 X2 X1
18.00
3.23 2.78 3.00 3.00 1.95 1.05 3.00
1.80

1.80
SEE TRUSS
DETAIL
5.30

5.30
3.30

3.30
D W
1 2
W W W W W W D W W D D D D D D
3 1 1 1 1 1 2 1 1 3 3 2 3 3 2
0.20

0.20
@ TECHNICIAN'S QUARTER & TRAINING CENTER @ TECHNICIAN'S QUARTER & TRAINING CENTER TECHNICIAN'S QUARTER & TRAINING CENTER

02 FRONT ELEVATION 02 REAR ELEVATION 02 CROSS SECTION


SCALE (A-1) 1:100M SCALE (A-1) 1:100M
A 03 SCALE (A-1) 1:100M A 03 SCALE (A-3) 1:200M A 03 SCALE (A-3) 1:200M
SCALE (A-3) 1:200M

CERTIFIED BY : PROJECT TITLE PREPARED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : SHEET CONTENT: SHEET NO.:

PROPOSED MULTI-SPECIES FRESHWATER


HATCHERY IN BALOI, LANAO DEL NORTE
ENGR. WENNIE P. ASEQUIA ENGR. RON KEVIN Y. LIMBACO GEKIE S. SY IBRAHIM R. SANGGOYOD TEODORO A. BACOLOD JR.
CIVIL ENGINEER
LOCATION: NANGKA, BALO-I, LANAO DEL NORTE CSW-CIVIL ENGINEER PROJECT LEADER OIC, OSC REGIONAL DIRECTOR, BFAR
Y1 Y2 Y3 Y4 Y5 Y6 Y7
18.00
3.23 2.78 3.00 3.00 3.00 3.00

1.00

0.20

X1
2.60

0.20
0.20
1.00
4 -16mmØ VERT.

0.10
X2

0.35
0.40

BARS

0.10
X3
1.80

12 -12mm BED

0.15
BARS
GRAVEL BED

X4 PLAN 0.10 0.30 0.10


0.30
1.20
12.00

X5 @ TECHNICIAN'S QUARTER @ TECHNICIAN'S QUARTER


1.00

02 WALLFOOTING (WF-1) 02 WALLFOOTING (WF-2)


X6 10mm LATERAL TIES A 03 SCALE (A-1) 1:20M
A 03 SCALE (A-1) 1:20M
SCALE (A-3) 1:40M SCALE (A-3) 1:40M
SPCD.3@0.05,3@0.10,
2.00

3@0.15 REST @0.20m.


X7
4 -12mmØ VERTICAL
0.60

BARS
X8

0.20
2.40

SCHEDULE OF BEAM
SIZE OF STIRRUPS &

0.80
X9 MARK DIMENSION(mm) @ SUPPORT @ MIDSPAN
12 -12mm BED SPACING
BARS
2.31

0.20
10mm Ø STIRRUPS
SPACED @
RB-1 150mm X 300mm 3-50mm,3-100mm,
SECTION 3-150mm, REST
200mm TO MIDSPAN
TOP BARS = 3-12mmØ TOP BARS = 2-12mmØ
@ TECHNICIAN'S QUARTER
BOT. BARS = 2-12mmØ BOT. BARS = 3-12mmØ

Y1 Y2 Y3 Y4 Y5 Y6 Y7
02 F1-C1 DETAIL
SCALE (A-1) 1:30M
A 03 SCALE (A-3) 1:60M
X X X X X

1.20 1.20
9 7 5 3 1

1.20 12.00 1.20


2"X3"X2MM THK. C-PURLINS S.P AT
1.86 1.00 1.00 1.00 1.14 1.14 1.00 1.00 1.00 1.86
.60M. ON CENTER
G.I RIDGE ROLL
1.20

2"X3"X1.5MM THK.
C-PURLINS S.P AT .60M
ON CENTER
0.40MM THK. RIB-TYPE PRE PAINTED
LONG-SPAN ROOFING

X1
2"X4"X2MM THK. G.I
RECTANGULAR TUBING
TOP CHORD

10MMø ROUNBAR

1.50
SAGRODS

X2
RB-1 RB-1 RB-1 RB-1

X3
2"X4"X2MM THK. G.I
RECTANGULAR TUBING
TOP CHORD

2"X3"X2MM THK. G.I


RECTANGULAR TUBING
WEEB MEMBERS

@ TECHNICIAN'S QUARTER
X4 GRID GRID GRID

02 TRUSS DETAIL-1
SCALE (A-1) 1:50M
A 03 VARIES 1.20
X5 SCALE (A-3) 1:100M
1.14 EQ EQ EQ VARIABLE

X6 G.I RIDGE ROLL

2"X3"X1.5MM THK.
C-PURLINS S.P AT .60M
ON CENTER
0.40MM THK. RIB-TYPE PRE PAINTED
LONG-SPAN ROOFING

X7
2"X4"X2MM THK. G.I
RECTANGULAR TUBING
TOP CHORD

X8

1.50
INTEGRATED TO MAIN TRUSS
RB-1 RB-1

X9
1.20

2"X4"X2MM THK. G.I


RECTANGULAR TUBING
TOP CHORD

2"X3"X2MM THK. G.I


RECTANGULAR TUBING
WEEB MEMBERS

@ TECHNICIAN'S QUARTER

02 HALF TRUSS DETAIL-1


SCALE (A-1) 1:50M
A 03 SCALE (A-3) 1:100M

CERTIFIED BY : PROJECT TITLE PREPARED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : SHEET CONTENT: SHEET NO.:

PROPOSED MULTI-SPECIES FRESHWATER


HATCHERY IN BALOI, LANAO DEL NORTE
ENGR. WENNIE P. ASEQUIA ENGR. RON KEVIN Y. LIMBACO GEKIE S. SY IBRAHIM R. SANGGOYOD TEODORO A. BACOLOD JR.
CIVIL ENGINEER
LOCATION: NANGKA, BALO-I, LANAO DEL NORTE CSW-CIVIL ENGINEER PROJECT LEADER OIC, OSC REGIONAL DIRECTOR, BFAR
0.10 1.50 0.10 0.80 0.10 0.80 0.10

0.10
0.50

0.50
1.20

1.50
2"ø VTC

OUTLET

0.10
INLET
3.50

2"ø VTC PLAN

0.10 1.50 0.10 0.80 0.10 0.80 0.10

0.40

0.30
AIR
SPACE

1.70
1.30
DIGESTIVE LEACHING LEACHING
CHAMBER CHAMBER CHAMBER

@ TECHNICIAN'S QUARTER

02 SANITARY LINE LAYOUT


SCALE (A-1) 1:100M
A 03 SCALE (A-3) 1:200M

SECTION

@ TECHNICIAN'S QUARTER
@ TECHNICIAN'S QUARTER 02 SEPTIC VAULT DETAIL
02 ISOMETRIC LAYOUT A 03 SCALE (A-1)
SCALE (A-3)
1:30M
1:60M
SCALE (A-1) 1:100M
A 03 SCALE (A-3) 1:200M

0.80 0.80
ILIGAN-BALOI
AIRPORT
0.10 0.60 0.10 0.10 0.60 0.10

0.10
0.10

INLET

SITE

VARIES
0.80

0.60

BALOI
MUNICIPAL HALL
0.10

0.10
BALOI LAKE

@ TECHNICIAN'S QUARTER @ TECHNICIAN'S QUARTER

02 WATER LINE LAYOUT 02 CATCH BASIN DETAIL @ TECHNICIAN'S QUARTER

A 03 SCALE (A-1)
SCALE (A-3)
1:100M
1:200M
A 03 SCALE (A-1)
SCALE (A-3)
1:20M
1:40M 02 VICINITY MAP
SCALE (A-1) NDTS
A 03 SCALE (A-3) NDTS

CERTIFIED BY : PRC NO. : 0084272 PROJECT TITLE PREPARED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : SHEET CONTENT: SHEET NO.:

VALIDITY : 07/25/2023
PROPOSED MULTI-SPECIES FRESHWATER
PTR NO. : 9917129
HATCHERY IN BALOI, LANAO DEL NORTE
12
LYNNE CARMEL E. CABALUNA DATE ISSUED : 01/08/2021 ENGR. RON KEVIN Y. LIMBACO GEKIE S. SY IBRAHIM R. SANGGOYOD TEODORO A. BACOLOD JR. 45
MASTER PLUMBER
TIN NO. : 190-817-863 LOCATION: NANGKA, BALO-I, LANAO DEL NORTE CSW-CIVIL ENGINEER PROJECT LEADER OIC, OSC REGIONAL DIRECTOR, BFAR

You might also like