The amount to be filled in shall be in accordance to the Design Basis, Specifications, Drawings, Data Sheet and related
document for the Design, Engineering, supply, delivery, installation, testing, commissioning, handing over and maintenance
defect liability period, for the complete Heating, Ventilation and Air Conditioning (HVAC) System and shall include all
during government duties & taxes, administrative costs, profits, etc.
The VENDOR shall complete the Price Schedule detailed herein to reflect the extent of works described for each item.
Any item left blank or having such descriptions as “NIL”, “O”, “-“, or other similar terms, other than a firm price indication,
shall be deemed to have been included in the prices or lump sum of other items.
No additional cost will be entitle / reimbursable to the contractor due to design, manufacturing and installation faulty.
VENDOR lump sum cost shall include all direct and indirect work, overhead and profit to complete the work.
RATE
ITEM DESCRIPTION QUANTITY UNIT TOTAL (RM)
(RM)
A SUBSTATION
Page 1 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
a. SUB-EF-001A/B
Air Flowrate: 260 l/s 2 Sets
Static pressure: 250 pa
4 Motorized Fire Damper shall be of Galvanized Steel
constructed to minimum thickness of not less than 2mm for
Blade and 3mm for casing or equivalent c/w two Ex'd'
(explosion proof) weatherproof (to IP 56) actuator limit-
switches. Electrical actuator shall be suitable for DC 24 V
input signal for remote control and power supply from the
HVAC Control Panel. Ex'd' weatherproof (min. to IP 56)
junction box with terminals for connection to HVAC control
panel. Thermal sensor to trigger closure of the damper at
72°C.To meet the requirements of BOMBA and local
regulations.
Page 2 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
i. 300 X 300 1
ii. 500 X 500 2
12 Humidity and Temperature Transmitter c/w accessories, etc. 2 Sets
(return air duct),
Page 3 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
20 The hot dipped galvanized hangers & supports for the 1 Lot
installation of equipment, power control panels, air duct
works, piping works, power/control tray/conduit works, and
all the anti-vibrations, attenuators, etc.
21 HVAC Control Panel system material supply and install. The 1 Sets
panel shall be min. IP54 and 2.0 mm thickness carbon steel
cabinet 'Rittal'. PLC Brand 'Siemens S7'
Page 4 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
TOTAL A
Page 5 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
Page 6 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
Page 7 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
19 The hot dipped galvanized hangers & supports for the 1 Lot
installation of equipment, power control panels, air duct
works, piping works, power/control tray/conduit works, and
all the anti-vibrations, attenuators, etc.
20 HVAC Control Panel system material supply and install. The 1 Sets
panel shall be min. IP54 and 2.0 mm thickness carbon steel
cabinet 'Rittal'. PLC Brand 'Siemens S7'
Page 8 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
26 3.5 mm mild steel sleeves for fire damper installation where 4 Sets
ducts pass through mansory walls. The gap between the
sleeve and fire damper shall be packed with fire retardant
caulking compund
TOTAL B
C MISCELLANEOUS
Page 9 of 10
HVAC SYSTEM MTO
(PROJECT DEVELOPMENT PHASE (PDP) FOR JOHOR PROJECT)
12 Recommended spare parts with price (SPIR form) for all 1 Lot
equipment items within three months after purchase ordered.
i.
ii.
iii.
TOTAL C
TOTAL D