TAKE OF SHEET

Propinsi : Jenis Prasarana :


Kabupaten : Lokasi :
Kecamatan : Volume : 200.00 x 1.10
3
Desa : : 96.00 m

A. Pekerjaan Tembok Penahan Tanah


1. Pekerjaan Pemasangan Bouplank
Kebutuhan : 200.00 m'
Dipasang / 10.00 m' 21.0 Titik
Perhitungan = Volume x Analisa
Bahan
1. Kayu Kaso 5/7 = 21.00 x 0.012 = 0.25 m3
2. Paku = 21.00 x 0.020 = 0.42 Kg
3. Kayu Papan 3/20 = 21.00 x 0.007 = 0.15 m3
Tenaga
1. Pekerja = 21.00 x 0.100 = 2.10 HOK
2. Tukang = 21.00 x 0.100 = 2.10 HOK

2. Pekerjaan Galian
Kebutuhan : 2
40.00 m
Perhitungan = Volume x Analisa
Tenaga
1. Pekerja = 40.00 x 0.750 = 30.00 HOK
2. Tukang = 40.00 x 0.025 = 1.00 HOK

3. Pekerjaan Pasangan Batu Kali 1 pc : 4 pp (Manual)


Kebutuhan : 3
96.00 m
Perhitungan = Volume x Analisa
Bahan
1. Batu Belah 15/20 = 96.00 x 1.200 = 115.20 m3
2. Semen @ 50kg = 96.00 x 3.260 = 312.96 Zak
3. Pasir Pasang = 96.00 x 0.520 = 49.92 m3
Tenaga
1. Pekerja = 96.00 x 1.500 = 144.00 HOK
2. Tukang = 96.00 x 0.750 = 72.00 HOK

4. Pekerjaan Plesteran (1 PC : 4 PP, tebal 15 mm)


Kebutuhan : 2
80.00 m
Perhitungan = Volume x Analisa
Bahan
1. Semen @ 50kg = 80.00 x 0.125 = 9.98 Zak
2. Pasir Pasang = 80.00 x 0.024 = 1.92 m3
Tenaga
1. Pekerja = 80.00 x 0.300 = 24.00 HOK
2. Tukang = 80.00 x 0.150 = 12.00 HOK

5. Pekerjaan Acian
Kebutuhan : 2
80.00 m
Perhitungan = Volume x Analisa
Bahan
TAKE OF SHEET

Propinsi : Jenis Prasarana :


Kabupaten : Lokasi :
Kecamatan : Volume : 200.00 x 1.10
3
Desa : : 96.00 m

1. Semen @ 50kg = 80.00 x 0.065 = 5.20 Zak


Tenaga
1. Pekerja = 80.00 x 0.200 = 16.00 HOK
2. Tukang = 80.00 x 0.100 = 8.00 HOK
TAKE OF SHEET

Propinsi : Jenis Prasarana :


Kabupaten : Lokasi :
Kecamatan : Volume : 200.00 x 1.10
3
Desa : : 96.00 m

REKAP KEBUTUHAN BAHAN, UPAH & ALAT


3
1 Batu Belah 15/20 = 115.20 m Dibulatkan ≈ 116.00 m3
2 Semen @ 50kg = 328.14 Zak Dibulatkan ≈ 329.00 Zak
3
3 Pasir Pasang = 51.84 m Dibulatkan ≈ 52.00 m3
4 Kayu Kaso 5/7 = 0.25 m
3
Dibulatkan ≈ 0.25 m3 24 Btg
5 Paku = 0.42 Kg Dibulatkan ≈ 1.00 Kg
6 Kayu Papan 3/20 = 0.15 m
3
Dibulatkan ≈ 0.15 m3 9 Lbr
7 Pekerja = 216.10 HOK Dibulatkan ≈ 217.00 HOK
8 Tukang = 95.10 HOK Dibulatkan ≈ 96.00 HOK