0,60
Total Pek. Galian Pondasi = 14.4 M3
0,50
Total Pasangan Batu Kali Untuk Pondasi = 11.28 M3
Begisting Sloof
0,15
Volume = 48.00 x 0.20 = 9.60 M2
0,10
3. Kolom praktis tebeng layar Tinggi = 2.10 M'
Jumlah = 2.00 Bh
Volume = 2.10 x 2.00 = 4.20 M'
5. Ring Balok 13/15 Panjang = 55.00 M'
Lebar = 0.13 Meter
Tebal = 0.15 Meter
0,15 Volume = 55.00 x 0.13 x 0.15 = 1.07 M3
6. Plat Lantai WC
Panjang = 2.00 M'
Lebar = 1.5 Meter
1,5 Tebal = 0.1 Meter
Volume = 2.00 x 1.5 x 0.1 = 0.30 M3
2
Untuk Pembesian ada hitungan tersendiri dan bisa dilihat pada tabel pembesian
V. PEK PEMBESIAN
Tabel Pembesian :
Gambar Panjang (M) Ø (MM) Jumlah Total Panjang (M)
1. Sloof 15/20
● ● 4 Ø 10mm 1. Besi pokok = 48.00 x 4
Ø 10 mm 4
= 48.00 = 192 Meter
0,16 Ø 6- 15
● ● 2. Cincin = 0.60 x 320
= 0.60 Ø 6 mm 320 = 192 Meter
0,11
2. Kolom Praktis 10/10 = 3.35 x 4
1. Besi Pokok = 13.40 x 13 Bh
● ● 4 Ø 10 mm Ø 10 mm 4
= 3.35 = 174.2 Meter
0,08 Ø 6 - 15
● ● 2. Cincin = 0.38 x 22.3333
= 0.38 Ø 6 mm 22.3333 = 8.48667 x 13 Bh
0,08
= 110.327 Meter
3. Kolom Praktis Tebeng Layar = 2.00 x 4
● ● 4 Ø 8 mm 1. Besi Pokok Ø 8 mm 4 = 8.00 x 2 Bh
0,08 = 2.00 = 16 Meter
Ø 6 - 20
● ● 2. Cincin = 0.38 x 10
= 0.38 Ø 6 mm 10 = 3.8 x 2 Bh
0,08 = 7.6 Meter
4. Ring Balok 1. Besi pokok = 55.00 x 4
● ● 4 Ø 10 mm = 55.00 Ø 10 mm 4 = 220 Meter
3 Pekerjaan Lisplang
- Listplank 3/30 = 52.00 x 0.03 x 0.30 = 0.39 M3
- Listplank 3/10 = 52.00 x 0.03 x 0.10 = 0.13 M3
Total Kebutuhan Kayu
Balok 6/12 Kuda-kuda = 1.41 x 1.1 = 1.55 M3 = 1.50 M3
Balok 5/10 Bubungan = 0.08 x 1.1 = 0.09 M3 = M3
Balok 5/10 Skour angin = 0.06 x 1.1 = 0.07 M3 = M3
Balok 5/10 Gording = 0.96 x 1.1 = 1.06 M3 = 1.00 M3
Papan listplank3/30 = 0.39 x 1.1 = 0.43 M3 = 0.5 M3
Papan listplank3/10 = 0.13 x 1.1 = 0.14 M3 = M3
2. Pekerjaan Atap
● Luas Atap Gedung Utama = 4.90 x 10.00 x 2.00 Bh = 98
● Luas Atap Teras = 3.56 x 4.00 x 2.00 Bh = 28.48
Total Luas Atap 126.48 M2
● Luas efektif seng perlembar = 1.60 x 0.70 = 1.12 M2
Jumlah seng yg dibutuhkan
= 126.48 X 1.12 = 141.66 Dibulatkan 142 Lembar
● Seng Perabung = 16.00 M'
● Penutup pinggir atap = 52.00 M'
3. Langit-Langit
a. Ruang belajar + Kantor Panjang = 8 Meter
Lebar = 6 Meter
Volume = 8.00 x 6.00 = 48.00 M2
b. Teras depan Panjang = 11 Meter
Lebar = 0.8 Meter
Volume = 11.00 x 0.80 = 8.80 M2
c. Teras belakang Panjang = 11 Meter
Lebar = 0.8 Meter
Volume = 11.00 x 0.80 = 8.80 M2
d. Teras samping Panjang = 4.68 Meter
Lebar = 0.75 Meter
Jumlah = 4 Bh
Volume = 4.68 x 0.75 x 4 = 14.04 M2
a. Untuk pekerjaan kuzen Pintu dan jendela dihitung berdasarkan jumlah lobang
b. Untuk Daun Pintu dan Rangka Jendela + Kaca dihitung berdasarkan jumlah Daun pintu & Jendela
2,96
Kebutuhan = 2.96 x 8.5 = 25.16 / 12 = 2.09667 Btg
Volume Volume
No. Uraian Pekerjaan Sat. Indeks Bahan & Pembulatan Keterangan
Pekerjaan
Upah
I. XIV. PEKERJAAN PERSIAPAN
RSNI. T-15-2002
1 M' Pek. Pemasangan bouwplank
Bahan :
Kayu Kelas III M3 0.0070 48.00 0.34 0.25
Paku biasa 2" - 5" Kg 0.0200 48.00 0.96 1.00
V. PEK. DINDING
SNI DT 91 - 0009 - 2007
1 M2 Memasang dinding bata merah (5 x 11 x 22) tebal 1/2 bata 1 Pc : 4 Pp
Bahan :
Bata merah Bh 70.0000 175.73 12,301 12,301
Semen Zak 0.2300 175.73 40.42 40.00
Pasir pasang M3 0.0430 175.73 7.56 8.00
Upah :
Pekerja HOK 0.3000 175.73 52.72 53.00
Tukang HOK 0.1000 175.73 17.57 17.00
7.3 1 M2 Memasang rangka langit-langit (60 x 60)cm, kayu klas II atau III
Bahan :
Kaso-kaso (5 x 7) cm M3 0.0163 96.84 1.58 1.50
Paku 7 cm dan 10 cm Kg 0.2500 96.84 24.21 24.00
Upah :
Pekerja HOK 0.2000 96.84 19.37 19.00
Tukang HOK 0.3000 96.84 29.05 29.00
11.3 1 M2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan :
Cat Avian Kg 0.2600 62.86 16.34 16.00
Cat dasar Kg 0.1700 62.86 10.69 11.00
Plamier Kg 0.1500 62.86 9.43 9.00
Minyak cat Ltr 0.0750 62.86 4.71 5.00
Upah :
Pekerja HOK 0.0700 62.86 4.40 4.00
Tukang HOK 0.0090 62.86 0.57 0.50
Dibuat oleh :
Perencana Kegiatan
……………………………..
Anggaran Dana Desa (DD) Tahun 2017
a b c=a-b d f g = b x f h = c x f
I. BAHAN
1 Semen PCC @ 50 Kg 186.00 186.00 Zak 75,000 - 13,950,000
2 Batu Gunung/ Batu Belah 13.00 13.00 M3 250,000 - 3,250,000
3 Pasir Pasang 22.00 22.00 M3 207,000 - 4,554,000
4 Pasir Beton 6.50 6.50 M3 207,000 - 1,345,500
5 Kerikil 8.50 8.5 M3 209,000 - 1,776,500
6 Batu Bata 12,301 12,301 Bh 550 - 6,765,550
7 Pasir Urug 3.00 3.00 M3 207,000 - 621,000
8 Besi Beton Ø 10 mm KS TY 57.00 57.00 Btg 70,000 - 3,990,000
9 Besi Beton Ø 8 mm KS TY 6.00 6.00 Btg 55,000 - 330,000
10 Besi Beton Ø 6 mm Jawa P= 12 M 43.00 43.00 Btg 25,000 - 1,075,000
11 Kawat Beton 28.00 28.00 Kg 20,000 - 560,000
12 Paku 44.00 44.00 Kg 18,000 - 792,000
13 Paku Tripleks 4.00 4.00 Kg 20,000 - 80,000
14 Tripleks Tebal 4 mm 36.00 36.00 Lbr 70,000 - 2,520,000
15 Seng Warna 142.00 142.00 Lbr 60,000 - 8,520,000
16 Seng Plat 6.00 6.00 Lbr 25,000 - 150,000
17 Paku Atap 9.00 9.00 Kg 25,000 - 225,000
18 List kayu profil 47.00 47.00 M 10,000 - 470,000
19 Cat tembok warna 80.00 80.00 Kg 30,000 - 2,400,000
20 Cat tembok utk plapond 12.00 12.00 Kg 15,000 - 180,000
21 Cat minyak Avian 16.00 16.00 Kg 55,000 - 880,000
22 Cat dasar Tembok (Putih) 21.00 21.00 Kg 15,000 - 315,000
23 Cat dasar minyak 11.00 11.00 Kg 15,000 - 165,000
24 Plamier 45.00 45.00 Kg 10,000 - 450,000
25 Minyak cat 5.00 5.00 Ltr 15,000 - 75,000
26 Amplas 12.00 12.00 Lbr 6,000 - 72,000
27 Kuzen pintu 5.00 5.00 Lbg 400,000 - 2,000,000
28 Kuzen jendela 9.00 9.00 Lbg 400,000 - 3,600,000
29 Kuzen jelusi tedeng layar 2.00 2.00 Lbg 150,000 - 300,000
30 Kaca Mati t = 5 mm 4.00 4.00 Bh 150,000 - 600,000
31 Daun pintu Panil 6.00 6.00 Bh 700,000 - 4,200,000
32 Daun jendela + kaca 5.00 5.00 Bh 200,000 - 1,000,000
33 Kunci Pintu tanam 2 Slag 5.00 5.00 Bh 130,000 - 650,000
34 Engsel pintu Kuningan 4" 18.00 18.00 Bh 20,000 - 360,000
35 Engsel jendela Sedang 10.00 10.00 Bh 10,000 - 100,000
36 Hak angin 5.00 5.00 Bh 7,000 - 35,000
37 Tarikan jendela 5.00 5.00 Bh 7,000 - 35,000
38 Grendel pintu besar 5.00 5.00 Bh 15,000 - 75,000
39 Grendel jendela 5.00 5.00 Bh 6,000 - 30,000
40 Kayu Kelas II 4.50 4.50 M3 1,900,000 - 8,550,000
41 Papan Kelas II 0.50 0.50 M3 1,900,000 - 950,000
42 Kayu Kelas III 0.50 0.50 M3 1,800,000 - 900,000
43 Pipa PVC 1/2" 2.00 2.00 Btg 25,000 - 50,000
44 Pipa PVC 3/4" 2.00 2.00 Btg 35,000 - 70,000
45 Pipa PVC 2" 2.00 2.00 Btg 110,000 - 220,000
46 Pipa hawa Septictank 1.00 1.00 Btg 100,000 - 100,000
47 Kloset Jongkok 1.00 1.00 Bh 150,000 - 150,000
48 Tekmond 500 Liter 1.00 1.00 Bh 850,000 - 850,000
49 Kran Air 2.00 2.00 Bh 22,000 - 44,000
50 Floor drain 2.00 2.00 Bh 10,000 - 20,000
51 Keramik Lantai 40 x 40 51.00 51.00 Ktk 70,000 - 3,570,000
52 Keramik WC 20 x 20 3.00 3.00 Ktk 70,000 - 210,000
53 Semen warna (Nat) 12.00 12.00 Kg 15,000 - 180,000
a b c=a-b d f g = b x f h = c x f
II. ALAT
1 Ember cor 10.00 10.00 Unit 6,000 - 60,000
2 Benang tukang 1.00 1.00 Unit 9,450 - 9,450
3 Kuas biasa 4" 3.00 3.00 Bh 20,000 - 60,000
4 Kuas biasa 2" 3.00 3.00 Bh 15,000 - 45,000
5 Kuas Roll 3.00 - 3.00 Bh 25,000 - 75,000
Sub Total (2) - 249,450
III. UPAH
1 Pekerja 345.50 345.50 Hok 80,000 - 27,640,000
2 Tukang 210.00 210.00 Hok 100,000 - 21,000,000
Sub Total (3) - 48,640,000
Jumlah (1) + (2) + (3) - 133,250,000
Total Biaya DD + Swadaya 133,250,000
……………………… ………………………….
Anggaran Dana Desa (DD) Tahun 2017
……………………….. …………………………
Program Daerah Pemberdayaan Masyarakat Form 2.8
YAHYA. J MARIAM
Semen PCC @ 50 Kg
Batu Kali
Pasir
Kerikil
Batu Bata
Tanah Urug
Besi Beton Ø 10 mm KS TY
Besi Beton Ø 8 mm KS TY
Besi Beton Ø 6 mm Jawa P= 12 M
Kawat Beton
Paku
Paku Tripleks
Tripleks Tebal 4 mm
Seng Gelombang 11 SNI 6 kaki
Seng Plat
Paku Atap
Keramik 40 x 40 cm
Semen warna
List kayu profil
Cat tembok warna
Cat tembok utk plapond
Cat minyak
Cat dasar tembok
Cat dasar kayu glotek
Plamier
Minyak cat
Amplas
Kuzen pintu
Kuzen jendela
Daun pintu Panil
Daun jendela + kaca
Kunci Pintu tanam 2 Slag
Engsel pintu Kuningan 4"
Engsel jendela Sedang
Hak angin
Tarikan jendela
Grendel jendela
Balok 8/12
Balok 6/12
Balok 5/10
Papan 3/25
Papan 3/10
Papan Kayu Klas II utk Bubungan
Papan Kayu Klas II Penutup tepi atap
Kayu Klas III (papan cor 2/20)
Balok kayu klas II (5/7)
Dolken kayu gelam Ø 8 - 4 M