GADHADA Earthing

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

1 2 3 4 5 6 7 8 9

N KEY PLAN :-

W E
A A

6
.7
81
Provide the quantity of each item

7,8
E767524.1517
N2430950.5196

E767459.9981

12
.1
N2430945.3456

82
Ep

5
INVT-01(302Kw)

-0
EP
6
-0
EP

LEGENDS
575W 2P x 14 MMS

575W 2P x 7 MMS

PERIPHERAL ROAD
B PLANT GANTRY
B

02
.3
80
BOUNDARY

EARTH PIT 12
INVT-02(302Kw)

25 * 6 EARTH STRIP

93
.8
82
Ep

BERTHING TRENCH

GENERAL NOTES:-

1. ALL DIMENSIONS ARE IN MM, UNLESS OTHERWISE SPECIFIED.


2. LOCATIONS SHOWN FOR EARTH PITS ARE INDICATIVE, IT MAY CHANGE AS PER
INVT-03(302Kw) SITE CONDITION.
3. EARTH CONDUCTORS BURIED IN GROUND SHALL BE LAID MINIMUM 600 MM
BELOW GROUND LEVEL UNLESS OTHERWISE INDICATED IN THE DRAWING.
4. ALL SMB SHALL BE EARTHED AS PER OEM RECOMMENDATIONS.
E767401.7758
N2430851.7199 5. THE MODULE FRAMES SHALL BE EARTHED WITH 1C X 2.5 SQMM CU EARTHING

14
.0
83
FLEXIBLE WIRE. THE COPPER WIRE SHALL BE CONNECTED TO THE EARTH HOLE
PROVIDED IN THE MODULE FRAME USING SUITABLE ARRANGEMENT IN LINE

7
-0
EP
WITH THE MANUFACTURER RECOMMENDATION. THE EARTHING ARRANGEMENT
C SHALL USE STAINLESS WASHERS TO PREVENT GALVANIC CORROSION C
BETWEEN ALUMINIUM FRAME AND COPPER WIRE. IN ORDER TO ACHIEVE

7,8
EFFECTIVE EARTHING, SERRATED WASHERS SHALL BE EMPLOYED TO
PENETRATE THE ANODIZATION LAYER OF THE MODULE FRAME.
6. THE SPACING BETWEEN TWO ELECTRODES SHALL BE ATLEAST EQUAL TO
TWICE THE LENGTH OF THE ELECTRODE.
INVT-04(302Kw) 7. EARTHING CONNECTIONS TO EQUIPMENT TERMINALS SHALL BE OF BOLTED
TYPE.
93

Nos. of earth pits shall be considered as


.4

93
83

8. EARTH ELECTRODES SHALL NOT BE SITUATED WITHIN 1.5M FROM ANY

.5
76
Ep

BUILDING WHOSE INSTALLATION SYSTEM IS BEING EARTHED. MINIMUM


DISTANCE BETWEEN EARTH ELECTRODES SHALL BE THE DRIVEN DEPTH OF
per the earthing calculation 9.
THE ELECTRODE.
ALL UNDERGROUND CONNECTION SHALL BE MADE BY ELECTRIC ARC WELDING.
THE WELDING JOINT SHALL BE ALLOWED TO COOL NATURALLY.
E767439.5061
N2430792.4018
10. ALL THE WELDED JOINTS SHALL BE TREATED WITH RED LEAD FOR RUST
PROTECTION AND THEN COATED WITH BITUMEN COMPOUND FOR CORROSION
PROTECTION.

4
-0
EP
11. MISCELLANEOUS ITEMS SUCH AS JUNCTION BOXES, CABLE END BOXES SHALL

69
.1
84

85
.7
83
Ep

INVT-05(302Kw) BE EARTHED WHETHER SHOWN OR NOT.


12. CABLE TRAY SHALL BE EARTH AT LEAST AT 2 POINTS TO NEARBY EARTHING
GRID.
13. EARTH PIT NUMBER WILL VERY AFTER EARTHING CALCULATION APPROVAL.
14. ITC EARTHING SHOW AS TENTATIVE ,FOR FINAL CONSIDER ITC EARTHING
D LAYOUR(TRN-32). D

7,8

89
.9
83
Ep

E767342.3369
N2430742.6493
INVT-06(302Kw)

08
-
EP
7,8

E767249.3126
N2430716.6831
E767191.9473
N2430714.9583
72
.8
86

92
.6
87

Room
58
.6
86

EP- 10
59
57

.4
.7

87

Room
86

1. Take the declaration from inverter OEM that


-1

3
EP

23
.0
Ep84
39
.0
88

Room
99
.7
88

s4
64
.0
88

Room

E
INVT-9(302Kw)
E767295.8721
N2430693.3918 INVT-07(302Kw) separate earth pit is not required for string inverter & E
BOTTOM
VIEW
LT
PANEL

its earthing can be directly connected with DC array


CABLE
BOTTOM
I/G
3

VIEW
ALLEY
BUSBAR
CABLE
BOTTOM
I/G
VIEW
ALLEY
BUSBAR

EP- 09
65
.2
92

Room

33
54
84

72

.4

earth grid/strip.
.3

Ep84 .8 27
.3

.2

87
86

GCP1
84

92

Ep Room .7
19

84
.7

06

Room
91

.7
85

well

3
51

E767377.1947
.7
84

Room

Remove this table


N2430676.3223
96
.1
92

Room

2. Consider the size & type of earthing cable for


42
27

.5
.2

91
85

Room well
46
72

.4
.7

85
84

Ep Ts3
17
.4
3
-0

5385

well
EP

.3

82
85

Room
.2
85

well
98
.3
85
94

well
.4
85

well

inverter as per the recommendation of inverter OEM


13
.5
85
well
INVT-08(302Kw)
05
23

.5
.4

85

Room
85

well
23
.6
87

Ts2
86
.6
85

Room

INVT-10(302Kw)
E767201.4681
N2430651.9232
18
.5
85

Ep
13
.4
86

Ep

EP- 12

INVT-14(113.6Kw)
23
.2
86

Ep

Ep86
.3
44
IDT-
EP
-5 INVT-12(302Kw)
99

1,25

ET
AG
.3
86

Ep
FENS
FOUNDA

ING
TION
M16*200
BOLT
SLOP

IDT-
H.V.
E 1:100

4,83
℄ OF
0,3
SIDE

X'MER
1,25
EP
-3
VIEW
I/G
BOTTOM

DATAL
CABLE

OGGE
R
1,5 0,4
0,5

0,5
VIEW

F
I/G
BOTTOM
CABLE
(500x5 SUM
℄ OF

SLOP
BUSBAR

TY
1,25

E 1:100
ALLEY
00X50PIT
X'MER

P. V
VIEW
0)

BOTTOM

I/G

IDT IEW
CABLE

PANEL

0,5
UPS

F
LT

F
VIEW

IDT- STA OF 4
DB
I/G
BOTTOM
CABLE

Fire
EP TIO MV
wall

-4 N A 1,5 F
IDT-
0,75

6,29

3,05 1
AUX

EP
96

HT
-1
DB

PANE
L
.0

I/C
CABLE
11
VCBkV
0,5

O/G
CABLE
86

F Ep
0,5

1,83
29

PLAN

F F
.2
87

SW IDT-
EP
-2

ITC
HY
AR
D
OFF
ICE-
PO
RTA
BL
EC
AB
IN

INVT-11(302Kw)
E767222.5201
N2430604.3954

EP
- 01

PRELIMINARY TENDER INFORMATION


32

INVT-13(302Kw)
.7
87
13
.6
87

RELEASED FOR :-
3

APPROVAL CONSTRUCTION AS BUILT


4
.1
88

Ep
55
.6
86

Ep

E767305.0681
N2430568.1326

REV. NO. REV. DATE STATUS


EP- 02

PROJECT :
58
.0
87

NAME SIGN. DATE


G G
DRN.
SCALE
DGN.
N.T.S
51
.4
87

Ep

CKD.

APPD.
DRAWING NO. REV.
DRAWING TITLE:

ARRAY EARTHING LAYOUT SHT. No. 01 No. OF SHT. 02

1 2 3 4 5 6 7 8 9
8 9

N KEY PLAN :-

ITC-1 W E
A
If above ground GI cable tray is considered between LT panel & transformer that its earthing shall also be shown in the layout.
S

LEGENDS
MAINTENANCE FREE CHEMICAL EARTH PIT

IDT-EP-5
MAINTENANCE FREE CHEMICAL EARTH PIT - FOR ELECTRONIC EQUIPMENTS

50x6 GI EARTH STRIP

10 Sqmm CU CABLE B
STRIP JOINT

NOTES :-
16sqmm
1. ALL EARTHING SHALL BE DONE AS PER IS-3043
2. EARTHING DESIGN ON BASIS OF SYSTEM FAULT CURRENT AND SOIL RESISTIVITY
3. INSPECTION CHAMBER AND LID SHALL BE PROVIDED AS PER IS-3043.

GATE IDT-EP-3 4. THE EARTH STRIP ROUTING SHOWN IN THE LAYOUT IS TENTATIVE
ONLY.HOWEVER THE EXACT ROUTING TO BE AS PER THE SITE CONDITION.
5. THE MINIMUM DISTANCE MAINTAINED BETWEEN TWO EARTH PITS IS 3.0 METERS.
6. EARTH STRIPS TO BE LAID AT DEPTH OF 600MM FROM FGL.
4,83 7. EARTH ELECTRODE SHALL NOT BE SITUATED WITHIN 1.5M FROM ANY BUILDING
WHOSE INSTALLATION SYSTEM BEING EARTHED.
8. EARTHING ARRANGEMENT SHALL USE STAINLESS WASHERS TO PREVENT
GALVANIC CORROSION BETWEEN ALUMINIUM FRAME AND COPPER WIRE.
9. INVERTER TRANSFORMER NEUTRAL SHALL BE FLOATING, NOT TO BE EARTHED.
52,1

1
10. TRANSFORMER TANK,CABLE BOX, MARSHALLING BOX AND ALL OTHER BODY
FENSING EARTH POINTS SHALL BE EARTHED.
DATALOGGER 11. NEUTRAL AND BODY OF THE AUXILIARY TRANSFORMER SHALL BE EARTHED.
12. METALLIC ENCLOSURE OF ALL ELECTRICAL EQUIPMENT INSIDE THE
TRANSFORMER YARD AND ITC SHALL BE CONNECTED TO THE EARTH GRID BY TWO

5,0
SEPARATE AND DISTINCT CONNECTIONS. C

BOTTOM VIEW
13. CABLE RACKS AND TRAYS SHALL BE CONNECTED TO THE EARTH GRID AT MINIMUM

CABLE I/G
F TWO PLACES USING GALVANIZED STEEL FLAT.
14. SCADA AND OTHER RELATED ELECTRONIC DEVICES SHALL BE EARTHED
0,3 0,4 SEPARATELY USING MINIMUM TWO NO. OF EARTH ELECTRODE.
15. THE CONNECTION BETWEEN MMS AND DC EARTH GRID SHALL BE BOLTED OR
WELDED.PORTION OF MMS WHICH UNDERGOES WELDING AT SITE SHALL BE
COATED WITH TWO COATS OF COLD GALVANIZING AND ANTI -BLACK BITUMINOUS
PAINT AFTERWARDS.

BOTTOM VIEW
0,5

CABLE I/G
TLOB NOITADNUOF

1,25 1,5
IDT-EP-1

UPS DB
002*61M

BUSBAR
0,5

ALLEY
F

BOTTOM VIEW

LT PANEL
F

6,29
CABLE I/G
SLOPE 1:100

EDIS .V.H

℄ OF X'MER D

BOTTOM VIEW
1 F

AUX DB
CABLE I/G
1,5
)005X005x005(
TIP MUS

57,0
Remove this table & instead of

5,0
℄ OF X'MER

Fire wall
1 HT PANEL
that provide the table with
SLOPE 1:100
11 kV quantity of all earthing items
VCB F
3,05
I/C CABLE O/G CABLE 1,83 E

TYP. VIEW OF 4 MVA

5,0
52,1

IDT STATION

IDT-EP-4 IDT-EP-2
PRELIMINARY TENDER INFORMATION
RELEASED FOR :-
APPROVAL CONSTRUCTION AS BUILT

REV. NO. REV. DATE STATUS

PROJECT :

NAME SIGN. DATE

DRN.
G
SCALE
DGN.
N.T.S
CKD.

APPD.
DRAWING NO. REV.
DRAWING TITLE:

ICR EARTHING LAYOUT SHT. No. 01 No. OF SHT. 02

8 9
1 2 3 4 5 6 7 8 9

N KEY PLAN :-
LA drawing shall be shown in lightning
1C x 4SQMM CABLE FOR protection layout of the plant
MODULE TO MODULE &
MODULE TO STRUCTURE
EARTHING
Z:\Solar\Projects\25MWp SCCL\Datasheet\LA\INDELEC\From_17.03.2023\PDF Images\Indelec Drawing for LA for 22MW Project (Gensol)-Model370e27bc.png
W E
A A
Z:\Solar\Projects\25MWp SCCL\Datasheet\LA\INDELEC\From_17.03.2023\PDF Images\Indelec Drawing for LA for 22MW Project (Gensol)-Modelc9b262b5.png

Z:\Solar\Projects\25MWp SCCL\Datasheet\LA\INDELEC\From_17.03.2023\PDF Images\Indelec Drawing for LA for 22MW Project (Gensol)-Model5271b9cb.png

DETAIL-B Z:\Solar\Projects\25MWp SCCL\Datasheet\LA\INDELEC\From_17.03.2023\PDF Images\Indelec Drawing for LA for 22MW Project (Gensol)-Modelbf2dac5e.png

S
NGL NGL

25X6 MM GI EARTH
STRIP FOR MMS
EARTHING

MAIN EARTH GRID


Module frame to frame earthing with separate cable is not 575Wp_2P x 14 MMS
LEGENDS

required but for the same declaration from the module 575Wp_2P x 7 MMS

B
manufacturer is required. PERIPHERAL ROAD
B
PLANT GANTRY

SMU BOX SMU BOX BOUNDARY


SERRATED EARTH PIT
WASHERS AND
25 * 6 EARTH STRIP
SS BOLTS.
BERTHING TRENCH
VIEW A
GENERAL NOTES:-
SPD EARTH 00

TERMINAL Indelec
Compteur de coups de foudre
1. ALL DIMENSIONS ARE IN MM, UNLESS OTHERWISE SPECIFIED.
2. LOCATIONS SHOWN FOR EARTH PITS ARE INDICATIVE, IT MAY CHANGE AS PER
Lightning flash counter

SITE CONDITION.
3. EARTH CONDUCTORS BURIED IN GROUND SHALL BE LAID MINIMUM 600 MM
ET -ve Input TB 6sqmm ET

1C x 35SQMM 16sqmm
SPD
Type 2
Shield
Clamp

CU CABLE BELOW GROUND LEVEL UNLESS OTHERWISE INDICATED IN THE DRAWING.


4. ALL SMB SHALL BE EARTHED AS PER OEM RECOMMENDATIONS.
CONNECTION OF EARTH
5. THE MODULE FRAMES SHALL BE EARTHED WITH 1C X 2.5 SQMM CU EARTHING
STRIP WITH 4 SQ.MM FLEXIBLE WIRE. THE COPPER WIRE SHALL BE CONNECTED TO THE EARTH HOLE
CABLE WITH NUT & BOLTS PROVIDED IN THE MODULE FRAME USING SUITABLE ARRANGEMENT IN LINE
WITH THE MANUFACTURER RECOMMENDATION. THE EARTHING ARRANGEMENT
C SHALL USE STAINLESS WASHERS TO PREVENT GALVANIC CORROSION C
NGL NGL NGL BETWEEN ALUMINIUM FRAME AND COPPER WIRE. IN ORDER TO ACHIEVE
EFFECTIVE EARTHING, SERRATED WASHERS SHALL BE EMPLOYED TO
PENETRATE THE ANODIZATION LAYER OF THE MODULE FRAME.
25x6 EARTHING 6. THE SPACING BETWEEN TWO ELECTRODES SHALL BE ATLEAST EQUAL TO
STRIP TWICE THE LENGTH OF THE ELECTRODE.
7. EARTHING CONNECTIONS TO EQUIPMENT TERMINALS SHALL BE OF BOLTED
25 x 6MM GI. FLAT TYPE.
8. EARTH ELECTRODES SHALL NOT BE SITUATED WITHIN 1.5M FROM ANY
BUILDING WHOSE INSTALLATION SYSTEM IS BEING EARTHED. MINIMUM
DISTANCE BETWEEN EARTH ELECTRODES SHALL BE THE DRIVEN DEPTH OF
THE ELECTRODE.
9. ALL UNDERGROUND CONNECTION SHALL BE MADE BY ELECTRIC ARC WELDING.

Earthing cable for inverter shall be 10.


THE WELDING JOINT SHALL BE ALLOWED TO COOL NATURALLY.
ALL THE WELDED JOINTS SHALL BE TREATED WITH RED LEAD FOR RUST
PROTECTION AND THEN COATED WITH BITUMEN COMPOUND FOR CORROSION

selected as per theELEVATION


recommendation
VIEW
of VIEW A 11.
PROTECTION.
MISCELLANEOUS ITEMS SUCH AS JUNCTION BOXES, CABLE END BOXES SHALL

inverter OEM DETAIL-B 12.


BE EARTHED WHETHER SHOWN OR NOT.
CABLE TRAY SHALL BE EARTH AT LEAST AT 2 POINTS TO NEARBY EARTHING
SMU EARTHING DETAILS GRID.
STRUCTURE EARTHING DETAIL 13. EARTH PIT NUMBER WILL VERY AFTER EARTHING CALCULATION APPROVAL.
14. ITC EARTHING SHOW AS TENTATIVE ,FOR FINAL CONSIDER ITC EARTHING
D LAYOUR(TRN-32). D
HDPE CHAMBER WELD JOINT
COVER 100 6
150

FGL FGL
150
260

HDPE CHAMBER
STRAIGHT JOINT
FLAT TO FLAT
FACTORY BUILD HOLES
25 x 6 mm GI FOR STRIP ROUTING
EARTH STRIP
BACK FILLING
COMPOUND
3000

E NATURAL SOIL ARC WELD E


ARC WELD
6
6
17.2MM Ø 3MTR LONG
COPPER BONDED ELECTRODE
T JOINT FLAT
TO FLAT
150

NATURAL SOIL/BACK FILLING


COMPOUND
100

TYP. MAINTENANCE FREE CROSS JOINT


EARTH PIT DETAIL FOR DC
TYPICAL EARTH STRIPS
FLAT TO FLAT
F
EARTHING CONNECTIONS F
MAX.
120

PRELIMINARY TENDER INFORMATION


RELEASED FOR :-
APPROVAL CONSTRUCTION AS BUILT

SERRATED WASHER FOR M8 HEX BOLT

REV. NO. REV. DATE STATUS

PROJECT :

NAME SIGN. DATE


G G
DRN.
1.6-2.0

SCALE
TYPICAL COPPER DGN.

CKD.
N.T.S

PLAIN WASHER FOR M8 HEX BOLT


SPRING WASHER FOR M8 HEX BOLT BOUNDED ROD DETAILS APPD.
DRAWING NO. REV.
TYP. DETAILS FOR MODULE TO MODULE EARTHING 1CX4 SQ.MM, DRAWING TITLE:

(REFER: MODULE INSTLLATION MANUAL) CU flexible ARRAY EARTHING LAYOUT SHT. No. 01 No. OF SHT. 02