GADHADA Earthing
GADHADA Earthing
GADHADA Earthing
N KEY PLAN :-
W E
A A
6
.7
81
Provide the quantity of each item
7,8
E767524.1517
N2430950.5196
E767459.9981
12
.1
N2430945.3456
82
Ep
5
INVT-01(302Kw)
-0
EP
6
-0
EP
LEGENDS
575W 2P x 14 MMS
575W 2P x 7 MMS
PERIPHERAL ROAD
B PLANT GANTRY
B
02
.3
80
BOUNDARY
EARTH PIT 12
INVT-02(302Kw)
25 * 6 EARTH STRIP
93
.8
82
Ep
BERTHING TRENCH
GENERAL NOTES:-
14
.0
83
FLEXIBLE WIRE. THE COPPER WIRE SHALL BE CONNECTED TO THE EARTH HOLE
PROVIDED IN THE MODULE FRAME USING SUITABLE ARRANGEMENT IN LINE
7
-0
EP
WITH THE MANUFACTURER RECOMMENDATION. THE EARTHING ARRANGEMENT
C SHALL USE STAINLESS WASHERS TO PREVENT GALVANIC CORROSION C
BETWEEN ALUMINIUM FRAME AND COPPER WIRE. IN ORDER TO ACHIEVE
7,8
EFFECTIVE EARTHING, SERRATED WASHERS SHALL BE EMPLOYED TO
PENETRATE THE ANODIZATION LAYER OF THE MODULE FRAME.
6. THE SPACING BETWEEN TWO ELECTRODES SHALL BE ATLEAST EQUAL TO
TWICE THE LENGTH OF THE ELECTRODE.
INVT-04(302Kw) 7. EARTHING CONNECTIONS TO EQUIPMENT TERMINALS SHALL BE OF BOLTED
TYPE.
93
93
83
.5
76
Ep
4
-0
EP
11. MISCELLANEOUS ITEMS SUCH AS JUNCTION BOXES, CABLE END BOXES SHALL
69
.1
84
85
.7
83
Ep
7,8
89
.9
83
Ep
E767342.3369
N2430742.6493
INVT-06(302Kw)
08
-
EP
7,8
E767249.3126
N2430716.6831
E767191.9473
N2430714.9583
72
.8
86
92
.6
87
Room
58
.6
86
EP- 10
59
57
.4
.7
87
Room
86
3
EP
23
.0
Ep84
39
.0
88
Room
99
.7
88
s4
64
.0
88
Room
E
INVT-9(302Kw)
E767295.8721
N2430693.3918 INVT-07(302Kw) separate earth pit is not required for string inverter & E
BOTTOM
VIEW
LT
PANEL
VIEW
ALLEY
BUSBAR
CABLE
BOTTOM
I/G
VIEW
ALLEY
BUSBAR
EP- 09
65
.2
92
Room
33
54
84
72
.4
earth grid/strip.
.3
Ep84 .8 27
.3
.2
87
86
GCP1
84
92
Ep Room .7
19
84
.7
06
Room
91
.7
85
well
3
51
E767377.1947
.7
84
Room
Room
.5
.2
91
85
Room well
46
72
.4
.7
85
84
Ep Ts3
17
.4
3
-0
5385
well
EP
.3
82
85
Room
.2
85
well
98
.3
85
94
well
.4
85
well
.5
.4
85
Room
85
well
23
.6
87
Ts2
86
.6
85
Room
INVT-10(302Kw)
E767201.4681
N2430651.9232
18
.5
85
Ep
13
.4
86
Ep
EP- 12
INVT-14(113.6Kw)
23
.2
86
Ep
Ep86
.3
44
IDT-
EP
-5 INVT-12(302Kw)
99
1,25
ET
AG
.3
86
Ep
FENS
FOUNDA
ING
TION
M16*200
BOLT
SLOP
IDT-
H.V.
E 1:100
4,83
℄ OF
0,3
SIDE
X'MER
1,25
EP
-3
VIEW
I/G
BOTTOM
DATAL
CABLE
OGGE
R
1,5 0,4
0,5
0,5
VIEW
F
I/G
BOTTOM
CABLE
(500x5 SUM
℄ OF
SLOP
BUSBAR
TY
1,25
E 1:100
ALLEY
00X50PIT
X'MER
P. V
VIEW
0)
BOTTOM
I/G
IDT IEW
CABLE
PANEL
0,5
UPS
F
LT
F
VIEW
IDT- STA OF 4
DB
I/G
BOTTOM
CABLE
Fire
EP TIO MV
wall
-4 N A 1,5 F
IDT-
0,75
6,29
3,05 1
AUX
EP
96
HT
-1
DB
PANE
L
.0
I/C
CABLE
11
VCBkV
0,5
O/G
CABLE
86
F Ep
0,5
1,83
29
PLAN
F F
.2
87
SW IDT-
EP
-2
ITC
HY
AR
D
OFF
ICE-
PO
RTA
BL
EC
AB
IN
INVT-11(302Kw)
E767222.5201
N2430604.3954
EP
- 01
INVT-13(302Kw)
.7
87
13
.6
87
RELEASED FOR :-
3
Ep
55
.6
86
Ep
E767305.0681
N2430568.1326
PROJECT :
58
.0
87
Ep
CKD.
APPD.
DRAWING NO. REV.
DRAWING TITLE:
1 2 3 4 5 6 7 8 9
8 9
N KEY PLAN :-
ITC-1 W E
A
If above ground GI cable tray is considered between LT panel & transformer that its earthing shall also be shown in the layout.
S
LEGENDS
MAINTENANCE FREE CHEMICAL EARTH PIT
IDT-EP-5
MAINTENANCE FREE CHEMICAL EARTH PIT - FOR ELECTRONIC EQUIPMENTS
10 Sqmm CU CABLE B
STRIP JOINT
NOTES :-
16sqmm
1. ALL EARTHING SHALL BE DONE AS PER IS-3043
2. EARTHING DESIGN ON BASIS OF SYSTEM FAULT CURRENT AND SOIL RESISTIVITY
3. INSPECTION CHAMBER AND LID SHALL BE PROVIDED AS PER IS-3043.
GATE IDT-EP-3 4. THE EARTH STRIP ROUTING SHOWN IN THE LAYOUT IS TENTATIVE
ONLY.HOWEVER THE EXACT ROUTING TO BE AS PER THE SITE CONDITION.
5. THE MINIMUM DISTANCE MAINTAINED BETWEEN TWO EARTH PITS IS 3.0 METERS.
6. EARTH STRIPS TO BE LAID AT DEPTH OF 600MM FROM FGL.
4,83 7. EARTH ELECTRODE SHALL NOT BE SITUATED WITHIN 1.5M FROM ANY BUILDING
WHOSE INSTALLATION SYSTEM BEING EARTHED.
8. EARTHING ARRANGEMENT SHALL USE STAINLESS WASHERS TO PREVENT
GALVANIC CORROSION BETWEEN ALUMINIUM FRAME AND COPPER WIRE.
9. INVERTER TRANSFORMER NEUTRAL SHALL BE FLOATING, NOT TO BE EARTHED.
52,1
1
10. TRANSFORMER TANK,CABLE BOX, MARSHALLING BOX AND ALL OTHER BODY
FENSING EARTH POINTS SHALL BE EARTHED.
DATALOGGER 11. NEUTRAL AND BODY OF THE AUXILIARY TRANSFORMER SHALL BE EARTHED.
12. METALLIC ENCLOSURE OF ALL ELECTRICAL EQUIPMENT INSIDE THE
TRANSFORMER YARD AND ITC SHALL BE CONNECTED TO THE EARTH GRID BY TWO
5,0
SEPARATE AND DISTINCT CONNECTIONS. C
BOTTOM VIEW
13. CABLE RACKS AND TRAYS SHALL BE CONNECTED TO THE EARTH GRID AT MINIMUM
CABLE I/G
F TWO PLACES USING GALVANIZED STEEL FLAT.
14. SCADA AND OTHER RELATED ELECTRONIC DEVICES SHALL BE EARTHED
0,3 0,4 SEPARATELY USING MINIMUM TWO NO. OF EARTH ELECTRODE.
15. THE CONNECTION BETWEEN MMS AND DC EARTH GRID SHALL BE BOLTED OR
WELDED.PORTION OF MMS WHICH UNDERGOES WELDING AT SITE SHALL BE
COATED WITH TWO COATS OF COLD GALVANIZING AND ANTI -BLACK BITUMINOUS
PAINT AFTERWARDS.
BOTTOM VIEW
0,5
CABLE I/G
TLOB NOITADNUOF
1,25 1,5
IDT-EP-1
UPS DB
002*61M
BUSBAR
0,5
ALLEY
F
BOTTOM VIEW
LT PANEL
F
6,29
CABLE I/G
SLOPE 1:100
EDIS .V.H
℄ OF X'MER D
BOTTOM VIEW
1 F
AUX DB
CABLE I/G
1,5
)005X005x005(
TIP MUS
57,0
Remove this table & instead of
5,0
℄ OF X'MER
Fire wall
1 HT PANEL
that provide the table with
SLOPE 1:100
11 kV quantity of all earthing items
VCB F
3,05
I/C CABLE O/G CABLE 1,83 E
5,0
52,1
IDT STATION
IDT-EP-4 IDT-EP-2
PRELIMINARY TENDER INFORMATION
RELEASED FOR :-
APPROVAL CONSTRUCTION AS BUILT
PROJECT :
DRN.
G
SCALE
DGN.
N.T.S
CKD.
APPD.
DRAWING NO. REV.
DRAWING TITLE:
8 9
1 2 3 4 5 6 7 8 9
N KEY PLAN :-
LA drawing shall be shown in lightning
1C x 4SQMM CABLE FOR protection layout of the plant
MODULE TO MODULE &
MODULE TO STRUCTURE
EARTHING
Z:\Solar\Projects\25MWp SCCL\Datasheet\LA\INDELEC\From_17.03.2023\PDF Images\Indelec Drawing for LA for 22MW Project (Gensol)-Model370e27bc.png
W E
A A
Z:\Solar\Projects\25MWp SCCL\Datasheet\LA\INDELEC\From_17.03.2023\PDF Images\Indelec Drawing for LA for 22MW Project (Gensol)-Modelc9b262b5.png
DETAIL-B Z:\Solar\Projects\25MWp SCCL\Datasheet\LA\INDELEC\From_17.03.2023\PDF Images\Indelec Drawing for LA for 22MW Project (Gensol)-Modelbf2dac5e.png
S
NGL NGL
25X6 MM GI EARTH
STRIP FOR MMS
EARTHING
required but for the same declaration from the module 575Wp_2P x 7 MMS
B
manufacturer is required. PERIPHERAL ROAD
B
PLANT GANTRY
TERMINAL Indelec
Compteur de coups de foudre
1. ALL DIMENSIONS ARE IN MM, UNLESS OTHERWISE SPECIFIED.
2. LOCATIONS SHOWN FOR EARTH PITS ARE INDICATIVE, IT MAY CHANGE AS PER
Lightning flash counter
SITE CONDITION.
3. EARTH CONDUCTORS BURIED IN GROUND SHALL BE LAID MINIMUM 600 MM
ET -ve Input TB 6sqmm ET
1C x 35SQMM 16sqmm
SPD
Type 2
Shield
Clamp
FGL FGL
150
260
HDPE CHAMBER
STRAIGHT JOINT
FLAT TO FLAT
FACTORY BUILD HOLES
25 x 6 mm GI FOR STRIP ROUTING
EARTH STRIP
BACK FILLING
COMPOUND
3000
PROJECT :
SCALE
TYPICAL COPPER DGN.
CKD.
N.T.S
(REFER: MODULE INSTLLATION MANUAL) CU flexible ARRAY EARTHING LAYOUT SHT. No. 01 No. OF SHT. 02
1 2 3 4 5 6 7 8 9