EmpTech - 4th Quarter Reviewer
EmpTech - 4th Quarter Reviewer
➢ Review each idea carefully, considering factors 2. Critical Thinking – using logic and reasoning to identify
like cost, effectiveness, and safety, and choose strengths and weaknesses of solutions, conclusions, or
the best ones approaches
3. Time Management – managing own/others’ time
GUIDELINES IN DESIGNING AN ICT PROJECT 4. Effective Writing – communicating effectively in writing
1. Quality
as appropriate for the needs of the audience
➢ Produce value for money
5. Reading Comprehension – understanding written
➢ Product is useful and provides solution
sentences and paragraphs in work related documents
➢ Conveyed in proficient way
6. Speaking – talking to others to change their minds
2. Timeliness
7. Active Learning – adjusting actions in relation to others
➢ Project must be finished on time
8. Persuasion – persuading others to change their minds
➢ Flexible in uncommon scenarios
9. Coordination – adjusting actions in relation to others
3. Teamwork
10. Equipment Selection – determining the kind of tools
4. Consistency
and equipment needed to do a job
➢ Project must be overseen in a predictable
11. Monitoring – assessing performance to make
manner
improvements
5. Business Value
12. Complex Problem Solving – identifying complex
➢ Project should be connected to business goals
problems and reviewing related information to
6. Communication
develop and evaluate options and implement
7. Flexibility
solutions
8. Required Format
13. Judgment and Decision Making – putting more
➢ Consisting of layout and typography
thoughts and considering the cost and benefits of an
9. Organization
action
➢ Enumerates the sections essential for proposal:
14. Instructing – teaching others how to do something
i. Title page
15. Leaning Strategies – using training methods and
ii. Summary
procedures appropriate for the situation or learning
iii. Table of contents
new things
iv. Statement of the problem
v. Objectives SUSTAINING AN ICT PROJECT FOR SOCIAL CHANGE
vi. Technical approach
vii. Project management flow PROBLEM MANAGEMENT
Problem
COPYWRITING FOR AN ICT PROJECT ➢ It is the unknown underlying cause of one or more
Copywriting
incidents.
➢ It is the key component of all product promotions,
campaigns, and marketing Problem Management
➢ According to Edmondson (2020), it is the skill or field ➢ It aims to resolve the root cause of incidents.
of working of writing sales promotion and other ➢ To minimize the adverse impact of incident caused
marketing materials by errors.
➢ Copy refers to the written content or text used in ➢ Aims to primarily find and resolve the root of a
various marketing materials, advertisements, problem and thus prevent further incidents.
websites, social media posts, emails, and other
promotional materials. This content is specifically Problem Management Process
crafted to communicate a message, promote a 1. Problem Detection
product or service, persuade the audience to take 2. Problem Logging
action, or achieve other marketing objectives. 3. Investigation & Diagnosis
➢ Its goal is to persuade people to take action, 4. Provide workaround
whether it’s buying something, enter an email ➢ A workaround refers to overcoming a problem
address, donate money, or clicking a button. or limitation in a program or system.
5. Create known error record
KINDS OF COPYWRITER ➢ A known error refers to a condition identified by
1. Marketing Materials - are leaflets and brochures successful diagnosis of the root cause of a
2. Advertising - has several distinct media kinds with problem and the subsequent development of a
scripted advertising material, which include: banners, workaround.
television advertisements, broadcast commercials, 6. Closure
internet sites, catalogs 7. Resolution
3. Websites - writing content for online publication …along with ongoing communication and
4. SEO (Search Engine Optimization) - writing content for monitoring.
websites in such a way that it appeals to search
engines CHANGE MANAGEMENT
5. B2B (Business to Business) - writing communications Change
from one business to another ➢ An event that results in a new status of one or more
6. B2C (Business to Consumer) - helping companies sell configuration items which are approved by the
to the public management.
➢ However, change is usually accompanied by
SKILLS NEEDED IN COPYWRITING uncertainty, poor communication, power-plays,
1. Active Listener – giving full attention to what other and chaos.
people are saying; taking time to understand the
points being made Change Management
EMPOWERMENT
FOURTH QUARTER REVIEWER
TECHNOLOGIES
Susi, Jeo Patrick N. | 12 - Jehoshaphat Second Semester | 2023 - 2024
➢ It aims to ensure that standardized methods and 1. How people view a webpage
procedure are used for efficient handling of all a. (Audience profiling)
changes. b. F pattern but it is only applicable to average
➢ It refers to thoughtfully and carefully re-aligning the persons
organization. 2. Design techniques that should be considered
a. Using of thumbnails has a huge impact to the
Change Management Process audience as they base their interest on what is
1. Request for change
depicted on the thumbnail
2. Impact analysis
3. The option of changing a website
3. Approve/deny
a. Updates of the page or site that showcases its
4. Implement change
new features/updates
5. Review/reporting (then repeat.)
4. File formats that are acceptable when uploading a
How do we manage change successfully? website
If you are managing a change, ensure that you: a. One rule in uploading a website is to keep the
a. Communicate the threat of not changing. quality of the website while minimizing storage
b. Involve your team in decision making (when space usage. There are 4 major supported
possible). image formats:
c. Minimize uncertainty. i. GIF (Graphics Interface Format)
d. Celebrate successes in moving towards the goal. ii. JPG (Joint Photographic Experts
e. Keep explaining the reasons to change. Group)
f. Be transparent as possible. iii. PNG-8 (Portable Network Graphics
8-bit)
Aims Of Change Management iv. PNG-24 (Portable Network Graphics
1. Minimal disruption of services 24-bit)
2. Reduction in back-out activities
3. Economic use of resources in the change. GIF JPG PNG-8 PNG-24
24-bit 24-bit
Request Fulfillment Supports 8-bit color 8-bit color
color color
➢ It focuses on fulfilling service requests, which are Photogra
minor (standard) changes or request for information. Logos, Logos, phs with
Photogra
Best for drawing, drawing, needed
Standard Change phs
cartoons cartoons transpare
➢ It means pre-approved, repeatable, pre-defined, ncy
low risk changes. Type of
compres Lossless Lossy Lossless Lossless
INFRASTRUCTURE MANAGEMENT
sion
Infrastructure
➢ IT Infrastructure - are the basic hardware, software, Well
supporte
networks and facilities upon which an organization’s All All All Not on IE6
d in
information technology are built.
browsers
➢ Examples:
Varying
o Network equipment levels of
o Telecommunication services Transpar opacity
1 color No color 1 color
ency and
Infrastructure Management
transpare
➢ The process of managing equipment, software, and
ncy
services. It is also another branch of Information
Animati
Technology Library (ITIL). Yes No Yes Yes
on
➢ The goal of infrastructure management is to use
proven, repeatable processes. DESIGN TECHNIQUES THAT SHOULD BE CONSIDERED
➢ According to an online article by Conversion XL
OPERATIONS MANAGEMENT
Founder Peep Laja, one design technique that
Operations Management
works effectively is that the first paragraph of an
➢ This provides the day-to-day technical supervision of
article in a webpage should be slightly larger that
the ICT infrastructure.
the rest of the content.
Technical support o A user focuses on the logo for about 6.48
➢ These are people who monitor and maintain seconds before moving on.
computer systems and networks within an o The navigation menu is the second most viewed
organization. part of the webpage; subjects spent an
➢ Provide assistance to those who experience average of 6.44 seconds viewing the menu.
technical, hardware, or software issues. o The search box was viewed for 6 seconds.
o Social networking links were viewed for 5.95
PUBLISHING AN ICT PROJECT seconds before moving on.
Uploading and Website Management o The site’s main image was viewed for 5.94
➢ There are multiple ways to upload a website: seconds.
o Purchasing a domain name. o The site’s written content was viewed for 5.9
o The use of 3rd party websites that enables us to seconds.
create a sub website (e.g. wix.com) o The site’s bottom part was viewed for 5.25
seconds.
Before considering uploading a website, a designer must
consider the following in chronological order:
EMPOWERMENT
FOURTH QUARTER REVIEWER
TECHNOLOGIES
Susi, Jeo Patrick N. | 12 - Jehoshaphat Second Semester | 2023 - 2024