Design of Rainfall Intensity
Design of Rainfall Intensity
Design of Rainfall Intensity
Rainfall Intensity,
Where,
I = Average rainfall intensity (mm/hr)
T= Average recurrence interval (year) , high ARI = 2 ≤ T ≤ 100
d= Storm duration (hours), 5 minutes to 72 hours
λ,, κ,, Ѳ,, ɳ = Fitting
g constant dependent
p on the rain g g location
gauge
Intensity
Return Period, T (Years) - CCF
(mm/hr)
Min 2 5 10 20 25 50 100
2.5 208.88 263.61 309.30 362.79 383.01 445.42 517.96
5 187.25 236.32 277.27 325.23 343.36 399.30 464.33
10 157.24 198.44 232.83 273.10 288.32 335.30 389.91
15 137.10
137 10 173.03
173 03 203.01
203 01 238.12
238 12 251.39
251 39 292.36
292 36 339.97
339 97
20 122.48 154.57 181.36 212.72 224.58 261.17 303.71
25 111.29 140.45 164.78 193.28 204.06 237.31 275.95
30 102.39 129.22 151.61 177.83 187.75 218.34 253.90
35 95.11 120.04 140.84 165.20 174.41 202.82 235.86
40 89.03 112.36 131.84 154.64 163.26 189.86 220.78
45 83.86 105.83 124.17 145.65 153.77 178.82 207.95
50 79.39 100.20 117.56 137.89 145.58 169.30 196.87
55 75.49 95.27 111.78 131.11 138.42 160.97 187.19
60 72.04 90.92 106.68 125.13 132.10 153.62 178.64
65 68.97 87.05 102.13 119.79 126.47 147.08 171.03
70 66.22 83.57 98.05 115.01 121.42 141.20 164.20
75 63.73 80.43 94.36 110.69 116.85 135.90 158.03
80 61.47 77.57 91.01 106.76 112.71 131.07 152.42
85 59.40 74.96 87.95 103.16 108.91 126.66 147.29
90 57.50 72.57 85.14 99.87 105.43 122.61 142.58
95 55.75 70.36 82.55 96.83 102.23 118.88 138.24
100 54.13 68.31 80.15 94.02 99.26 115.43 134.23
105 52.63 66.42 77.93 91.40 96.50 112.22 130.50
110 51.23 64.65 75.85 88.97 93.93 109.23 127.02
115 49.92 63.00 73.91 86.70 91.53 106.44 123.78
120 48.69 61.45 72.10 84.56 89.28 103.83 120.73
125 47 54
47.54 59 99
59.99 70 39
70.39 82 56
82.56 87 17
87.17 101 37
101.37 117 88
117.88
130 46.45 58.62 68.78 80.68 85.18 99.05 115.19
Time of Concentration, tc = to + td
Where,
L = Overland sheet flow path length (m) = 59.70 m
n = Manning's roughness value for the surface = 0.035 (Table 2.2 MSMA 2)
S = Slope of overland surface (%) = 256.000
Where,
L = Length of reach (m) = 6 m
n = Manning's roughness coefficient = 0.035 (Table 2.3 MSMA 2)
S = Friction slope (m/m) = 0.0033
R = Hydraulic radius (m) = 1.104 m
= 0.011 x 83
60 x 0.5332/3 x 0.0021/2
= 0.06 min
tc = tcs = to + td
Runoff coefficient, C = 0.35 (Open space - Bush Cover, 0.40 - Grass cover)
= 0.90 (Commercial & Business Centre)
Qy = cxixA
Rational Method
360
Using Equation 19.1 with Equation 19.1a and 19.1b for below ground storage (MSMA)
a - (a2 - 4b)
PSD =
2
a=
= 64,395.15
b = 8.548 Qa Qp
= 175,124,755.76
d = 0.117 PSD2/Qd
Storage Volume (m3)
6000.00
5000.00
4000.00
3000.00
2000.00
1000.00
0.00
0 20 40 60 80 100 120
Storm Duration (Minutes)
From the table, Maximum SSR of 6895.85 m3 occurred at duration of 105 mins
Provided SSR = 7078.50 x 1.5 m depth = 10,617.75 m3 > 6895.85 m3 SSR --------> OK!
PSD
Ao =
Cd (2gHo)
1991.67 x 10 -3
=
0.62 (2x9.81x1.15)
= 0.68 m2
0.45 m
1.50 m
Q for post-development:
Q1 = C0 A0 (2gHo)0.5
= 1.979
= 11.876 m3/s
Qweir = Q2 - Q1