Beamslabcons
Beamslabcons
Beamslabcons
A A
B B
C C
E E
F F
G G
STEP 3,4:
3,4 Set up the main purlin for beam and STEP 5, 6:
6 Set up the sub purlin for beam and
slab slab
- The spacing of each purlin is 1000 mm. - The spacing of each purlin is 300 mm.
- Cross section of purlin: 50x100. - Cross section of purlin: 50x50.
Level 7
STEP 10:
10 Remove formwork and scarfolding
22800 - After finish casting +3 floors level, scarfolding can be
removed.
A B C 1 : 50
HEAD OF
DEPARTMENT
Ph.D LONG HOAI LE
BEAM AND SLAB CONSTRUCTION METHOD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16