Beamslabcons

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D SCARFOLDING BEAM SCARFOLDING SLAB STRINGER SLAB JOIST SLAB D


1 2 3 4

E E

F F

G G

FORMWORK BEAM FORMWORK SLAB CAST CONCRETE RINGLOCK SYSTEM


5 6 7 D
H H

STEP 1:1 Set up the ringlock system for beam STEP 2:


2 Set up the ringlock system slab
- The spacing of each ringlock set is 1000 mm. - The spacing of each ringlock set is 1000 mm.
Level 8 - There is a space width 1000m for moving in - There is a space width 1000m for moving in
construction. construction.
I 26600 - the height of beam ringlock system is
I
3200mm.

STEP 3,4:
3,4 Set up the main purlin for beam and STEP 5, 6:
6 Set up the sub purlin for beam and
slab slab
- The spacing of each purlin is 1000 mm. - The spacing of each purlin is 300 mm.
- Cross section of purlin: 50x100. - Cross section of purlin: 50x50.

STEP 7,8: Set up Fromwork for beam and slab STEP 9:


9 Cast concrete
Each plywood plate is 18mm thickness 2440 - Type of concrete: C25/30.
mm length. - Pour concrete continuously for all floor beams of
K each floor level. K
*Pay attention to compacting with the correct
technique. Do not compact too lightly or too
compacted.

Level 7
STEP 10:
10 Remove formwork and scarfolding
22800 - After finish casting +3 floors level, scarfolding can be
removed.

VIETNAM NATIONAL UNIVERSITY HO CHI MINH CITY


CAPSTONE PROJECT
L L
HO CHI MINH CITY UNIVERSITY OF TECHNOLOGY

6 7 FACUALTY OF CIVIL ENGINEERING


PROJECT OF DESIGN AN KHANG HOSPITAL

FRONT VIEW RIGHT VIEW Section 1


DEPARTMENT OF CONSTRUCTION AND MANAGEMENT

A B C 1 : 50
HEAD OF
DEPARTMENT
Ph.D LONG HOAI LE
BEAM AND SLAB CONSTRUCTION METHOD

M RECEIVED DATE FINISHED DATE DRAWING M


ADVISOR ASSOC. PROF. SY TIEN DO
NO

12/01/2023 09/05/2024 TC2


STUDENT KHOA ANH VU 2053147