Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

SGS5G Company 2020 2040 Latest

Download as pdf or txt
Download as pdf or txt
You are on page 1of 38

SUPER GLOBALSTAR5 GROUP SDN

BHD COMPANY PROFILE 2020


TO 2040

COMPANY PROFILE FROM DEC 2004 TILL PRESENT STILL


UPGRADING
OILFIELD : MARINE : ENGINEERING : TRADING : PROJECT
MANAGEMENT SERVICES
NEW OIL PRODUCTION PROJECTS
• We are a small company but we think big in
providing good technical expertise to our client in
marine,oil and gas and engineering services.Our
team have more than 100 years of experiences in
Drilling,Logging,Cementing,Drillfloor equipment,Top
Drives,Sub- Sea Equipment,Fabrication,Pressure
Test,Downhole tools,such as
Valves,Manifolds,Flanges,Tees, Crosses,Drilling
HISTORY Spools,Master
Bushing,Slips,Pumps,Modules,Controls,etc
• We service,repair and test as per client requirement
from 1991 to 2014

• Now 2020 we are focusing on Investor interest to


invest in Indonesia with Government projects.
SUPER GLOBALSTAR5 GROUP TEAM A
• Project Consultant/Management Team
• Marine/Offshore Engineering
• Fabrication & Piping/Inspection
• Valves – service,repair & test up to
22,000psi
PROJECT • Safety Equipment and Manpower Supply

MANAGEMENT • Survey,Repair on Board/Oil Rigs/Vessel


• Power Plant,Refineries,Port etc
2020 to 2040
• Consultant for Subsea,Drilling
Equipment/Services Onshore and Offshore
• API Workshop – API Q2, API SPEC7-1 - 2, API
6A, API 16A,5CT and Hard Banding
Technology
• Oil Production for wells and Blocks Projects
• Technical Director : Medzi Che Din – Asia Pacific
• Business Director : Abdullah Md Dawood – Asia
Pacific/World
• Indonesia Oil Head : Latiff Kadir
• Technical Advisor : Bohari Hj Siraj – Malaysia
• Consultant/CEO : Roger Bell – United
Kingdom/World
• Assets Manager : Zulkifli Mohamad - Singapore

MANAGEMENT •

Administrator : Fatin A.Rahman – Malaysia
Operations Manager : A.Rahim Hassan – Indonesia
TEAM • Accountant : Sukhbhir Singh – Singapore
• Legal/Investment Advisor – Lim Kok Tiong,Danny –
Singapore/World
• International Lawyers – GENESIS.Singapore
• Financial Advisor – Abdul Karim Ahmad –
Singapore/World
• OIL PRODN/CEPU 2020 • $ 115,000,000.00
INVESTMENT
• OIL PRODN/RIAU 2020 • $ 135,000,000.00
BREAKDOWN • $
• PRAWN FARMING 2020 20,000,000.00
– 2020-2040 – • PORT DEVPT 2020 • $7,050,000,000.00
USD • House Development • $ 20,000,000.00
• ACEH GAS/OIL • $ 60,000,000.00

• Total Investment • $0,000,000,000.00


estimated • --------------------------------
• Any different in value • All project value will
depend
• Will be added to
cashflow,detail attached • On Investor interest
• All numbers is in US
Dollars
• RIAU OIL BLOCK • ES/CASHFLOW DONE
DETAIL
ATTACHED • OIL WELL LIFTING CEPU • EXECUTIVE
SUMMARY/CASHFLO
FOR 2 • VIDEO ATTACHED
W DONE

PROJECTS
• EXECUTIVE
• CPO DUMAI SUMMARY/FEASIBLE
PORT/Mandate Letter STUDY DONE

• TRADING OFFICE - SPORE


• PLANNING
• OPERATION OFFICE EXECUTION
MALAYSIA & JKT/JB
• OILPRODUCTION/ROKAN • INV 39% - GOVT/BUMD -
JOINT HILIR/API

61%
INV 70% - GSTAR5/PT.PPP –
• OIL WELL LIFTING –
VENTURE CEPU/JAVA ISLAND
30%

PROPOSAL • PRAWN FARMING/DUMAI • INV 60% - GSTAR5 – 40%


Nett profit ASAP
• USD20M
• ALL NEGOTIABLE

• OTHER PROJECTS
AVAILABLE ON REQUEST
• Legend :
• CPO PLANT/FACTORY
• INV – INVESTOR
• POWER PLANTS • GSTAR5 – SUPERGLOBSTAR5
• SEA/RIVER SNDS
• HOUSE DEVELOPMENT
1. KHAIRUL MUNIR – PUMPING UNIT EXPERT 25 YEARS – 5000
WELLS
2. ARIEF JUWANTO – EX - PERTAMINA ,PERSONAL FRIEND – BY
TRAINED GEOLOGIST/INDONESIAN COMMERCIAL EXPERT

Business 3. KUD/BUMD – LOCAL GOVERNMENT/DUMAI GOVERNMENT


4. PERTAMINA EP.- BOJONEGRO.EAST JAVA,INDONESIA – 55

Contact – WELLS
5. PERTAMINA EP – CEPU EAST JAVA,INDONESIA - 10- 100
WELLS/BLOCKS
Super 6. API/HARDBANDING WORKSHOP – MEDZI/HASHIM
EXPERTISE – 35 YEARS
Globalstar5 7. TRADING OIL AND GAS EQUIPMENT – MEDZI/ROGER BELL
EXPERTISE – 40 YEARS
8. COPPER SCRAP,HMS 1 & 2,COPPER TRADING –
WIP/PRESENT
9. INVESTOR REQUIRED FOR OIL PRODUCTION / PORT ASAP
• STRAINERS FOR TG BIN POWER PLANT – 2011 to 2013
• LOGGING TOOLS FOR SCHLUMBERGER/HALLIBURTON –
1992 to 2011
• API 6A VALVES,FLAPPER VALVE 1.5M IN DIA. FOR TG BIN
POWER PLANT 3 PCS 100% COMPLETED in 2011 - 2013
• OVERHEAD CRANES, WINCHES AND MANHOLES – 2008 -
2011

COMPLETED • ENGINEERING,DRILLING/ROTARY
EQUIPMENT,SALES,SURVEY, REPAIR,MANUFACTURE
PROJECTS IN NEW,SERVICE,FABRICATION AND HYDROTEST UP TO
22,500 PSI – 1988 – 2014 – CLIENT DRILLING
1978 - 2014 CONTRACTORS

• TEST LOOP 26” PIPE X 100 FEET LONG, FULL


FABRICATION TESTED with SMART PLUG 100% FOR
TALISMAN in MALAYSIA – 2013 – CLIENT : TD
WILLIAMSON,SINGAPORE
Bohari Hj Siraj – Technical
Advisor at Tg Bin Power
Plant,Pontian,Malaysia Tilting
Valve – 2011 - 2013

• Vast experiences in Oil and Gas expertise


in Logging and Drilling
Equipment,Hydraulic,Pheumatic,Electrica
l,Pumps,Mechanical and Services in
Halliburton,Schlumberger and P.Brani
Port – 40 years in Singapore and around
the world
MERKAB, DRILLING HEAD
SERVICING IN KEPPEL IN SINGAPORE - 2010
DRILLING
EQUIPMENT,CHRIST
MAS TREES,MARINE
RISERS
SPOOLS,Refurbished
and REPAIR for
SMEDVIG
OFFSHORE/SAPURA
ENERGY ( new owner
) – 1998 - 2004
ROTARY EQUIPMENT MACHINING
SUCH AS DRILLING SPOOLS
ELEVATORS,FLANGES,DRILLING
EQUIPMENT – 30 YEARS -1988 -
2014

• WE NEED ONE STOP API


WORKSHOP IN
DUMAI,SUMATRA
• ANOTHER ONE IN
MALAYSIA
FGD PUMP AND
VALVES SURVEY AT
POWER
PLANT,PONTIAN,2010
- 2012
FGD,FLAPPER VALVE – 8 TONS
A,B,C,OVERHAULED,COMMISSIONING
COMPLETED IN 2011-2013

PROJECT VALUE RM1,000,000.00


RAW-WATER
TOWER,JACKUP
LEGS
FABRICATION
COMPLETED
2007 -2008,
SINGAPORE

CLIENT : CPOE
PROJECT VALUE
USD480,000,000.
00
E & I, FPSO in Pasir Gudang,Survey/Commissioning – Johor 2009
PRECISION MACHINING -1987 - 2014
MARINE SHEAVES REPAIR- 2010
FOR MERKAB DRILLING – KEPPEL,SINGAPORE
ELECTRICAL,JACKING SYSTEM conversion FPSO
NAN WANG 256 AT MMHE,2008 - 2009,MALAYSIA
PLC.ELECTRICAL
SYSTEM TROUBLE
SHOOTING –
MMHE – JACK-
UP,2008 -
2009,Malaysia

Project value
RM6,000,000 Each
MUD PUMP OVERHAUL IN SINGAPORE
FOR CENTURY DRILLING 2002
API Rotary Equipment MACHINING – 1987 - 2009
• Business Director : Md Abdullah
Md Dawood
• Technical Director : Medzi Che
Din
• Technical Advisor : Bohari Hj
Siraj
• Consultant/CEO : Roger Bell
• Indonesian Head : Latiff Kadir
• Senior Project Manager :
Mahmud Mustapha
• Consultant/Exploration Expert :
Alfian Usman
• API Workshop Expert :
Sulaiman Wahab
• Project Coordinator : Ramat
Samsi
• Consultant : Torgeir Herfindal -
Norway
SURVEYING Trans Ocean Jack-up/TTS • Consultant : Tom Milne - Dubai
Survey ships in 2008-2009
OIL RIGS AT JOHOR PORT,MALAYSIA
• SAPURA KENCANA • CHEVRON,SUMATRA
Drilling • TRANSOCEANS • MITCO PERTAMINA
Contractor • DIAMOND OFFSHORE • DRILLING
CONTRACTORS
CLIENTS • SEADRILL AROUND THE WORLD
• ENSCO • DUMAI GOVERNMENT
• PERTAMINA • RIAU/ROKAN
• PETRONAS GOVERNMENT
• WEATHERFORD
CONSULTANT/MANDATE • From • Meeting done in
LETTERS DUMAI in October
• Government of DUMAI and December
in 2017 and 25.10.2019 2017/2019 endorsed
• Attached below by Mayor of DUMAI
City
• More projects in
pipeline private and
government
• Mechanical/Electrical • Razak Salimon
Candidate • Inspection • Dedi Suwandi
Project • Transportation • Jisman Siregar
Managers - • Safety • Amrizal
• Pumping Unit Expert 6 • Khairul Munir Lead
01 pax
• Zulkifli Mohamad
• Mechanical/Electrical
• Sulaiman Wahab
• API Workshop
• Rahim Hj Hasan
• Mechanical/Store
• Riduan Md Sah
• Engines
• Bahri Mahadi
• Caterpillar Engines
• Michael Lim
• Procurement
• Rimanto Ato/Engineer 16 • Fabrication/Procureme
Candidate pax nt

Project • Rizal Hakiki • Refinery Engineer


• Menzano • Mechanical
Managers - • Batam Engineers • Cranes
02 • Kimi/Bohari/Pontian
Team
• Valves/Underwater/Divi
ng
• Azri Azizan • Head Pipeline Solutions
• Norazmi Ibrahim • Oil Trader/Procurement
• Hashim Sarman • Hardbanding/Drillpipes
• Agus Affendy • HSE
• Indian Schlumberger • Logging Tools Engineer
• Giransari • Inspection
• Ramat Samsi • Wellhead System
Candidate • Rizal Ahmad • Cranes Expert
Project • Jahangir Gates • Mech/Elect Engineer
Managers
• Adam Johari • Mechanical/Funds
Candidate • Ilmy Hashim • Mechanical/Digital
for Trainee • Gadafi Abdul Hamid • CPO Refinery
Managers • Zailani Maksom • Mechanical/Sales
• Rizal Mohammad • Mechanical
• Farhan Mahmud • HSE
• Taliboy • Mechanical
• Fatin Faizal • Administrator/Accoun
ts
• Maniam daughter
• Accountant
• Rozita Jamil
• Administrator/Purchas
er
• Wan Johari • Oilfield Commercial
Candidate • Prodigee 10 pax
PR

for Trainee • Mint/Faizal Myanmar


• Singapore/Malaysia
• Mechanical
Managers
SGS5G TO BUILD
SCHOOLS/TRANSFER
TO BUILD MOSQUE IN
INDONESIA
TO BUILD API
TRAINING CENTER

FOUNDATION TECHNOLOGY

MISSION
2020 - 2040
TO AWARD TO BUILD R & D SITES TO HELP THE POOR
SCHOLARSHIP 5 PAX AROUND THE WORLD
EVERY YEAR

You might also like