SDCS-02
SECTION 19
Rev.00
This document contains proprietary information developed by and for exclusive use of Saudi Electricity
Company (SEC) Distribution Network. Your acceptance of the document is an acknowledgment that it must be
used for the identified purpose/application and during the period indicated. It cannot be used or copied for any
other purposes nor released to others without prior written authorization of SEC Distribution Services Sector.
SEC shall assume no responsibility for any type of misuse and/or misapplication, and any harm resulting there
from. SEC also reserves the right to take any necessary actions to protect its interest against unauthorized use.
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:2 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
Table of Contents
1 Scope 4
2 Cross References 4
3 General Requirements 5
4 Safety Requirements 6
5 Material 7
6 Manhole Requirements 9
8 Drawing 12
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:3 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
1.0 SCOPE
This standard specifies the design, and installation practices to be applied in the construction of
concreate cable ducts banks system. It is intended to guide the designers, engineers and field
personnel to achieve standardization in construction and to ensure a satisfactory and economical
level of service without operating restrictions so that the operational errors should be minimum
for safety and reliability.
The latest revision/amendments of the following codes and standards shall be applicable
for the equipment/material covered in this Distribution Material Standard Specification.
In case of any conflict, the vendor/manufacturer may propose equipment/material
conforming to one group of industry codes and standards quoted hereunder without
jeopardizing the requirements of this standard specification.
3.2 All cables inside the manhole shall be painted by approved fire rated paints.
3.3 Floor & wall should be painted by epoxy paints with gray color.
3.4 Every cable shall be tagged with 3 layers, engraving plastic tag or both sides of
manholes.
3.5 All ducts inside the manholes shall be labelled of numbering sequence.
3.6 All manhole shall have Single Line Diagram or Cable arrangement drawings.
3.7 Every manhole will be tag, to be include project no., manhole no., circuit
information and with dimension not less than 10 cm * 15 cm.
3.8 Cable De-rating calculation shall be provided by contractor for initial approval by
SEC.
3.9 All joints & termination shall perform inside the manholes; no any joints are allowed
to be inside the ducts.
3.10 25% of ducts shall be keep empty, minimum 1 pipe/duct bank, for emergency use.
3.11 The manhole shall be water treatment inside & outside, inside the manhole should
be cover by epoxy paint (gray color).
3.12 The maximum of cable joints in each side is 30% of the cable numbers.
4.6 Housekeeping
Good housekeeping shall be strictly observed. Materials/equipment being used shall
be arranged so as not to cause obstruction to traffic or to the public.
4.7 Signboards
The contractor shall provide cable trenching signboards on every trench/road
crossing and 200 meters on straight run.
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:6 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
5.0 MATERIAL
5.3.2.4 Manhole lids shall have a checkered design with the standard
LOGO of the company with the word SEC DISTRIBUTION
MANHOLE cast into the top surface. (refer to Fig. 14)
5.3.2.5 Manhole frames shall provide a 1200mm diameter opening. (refer
to fig. 11).
5.3.2.6 Manhole frames and covers shall be approved material by SEC.
The cover shall have two (2) pick holes 25.4mm diameter located
180° apart
5.3.2.7 Manhole shall have two (2) entering/access.
All conduit and end bells shall be 200mm² diameter, and use (PVC) or
5.3.3
(HDPE) class 4 or equivalent, cast in place in the concrete wall of the
manhole.
5.3.4 End bell shall be glued to the front and back of each Rigid PVC, HDPE
conduit class 4 or equivalent.
5.3.5 Manhole cable duct interface shall be sealed with approved sealant prior to
waterproofing.
5.3.6 Cable racks & Cable support arms shall be heavy duty, referring to the latest
revision for the MV cable tray specifications.
5.3.7 Cable Ladder should have minimum diameter 19.05mm (round metal
rungs). And the finished ladder shall be Hot-Dip galvanized conforming to
ASTM A123.
5.3.8 Cable clamps should be as per 12-SDMS-04 (latest revision)
5.3.9 Grounding
5.3.9.1 Grounding shall follow SEC grounding Specs. For grounding
materials (Rods, conductors, …)
5.3.9.2 Grounding resistances shall be less than 5 Ohm.
5.3.9.3 Grounding conductors (70mm2, CU) shall be thermal welding
with steel Structural.
5.3.9.4 One grounding point at each side shall be provided for metal
accessories and testing devices.
6.0 MANHOLE REQUIREMENTS
6.1 The minimum inside dimensions for a manhole was shown in the fig 11, Fig 12 and
fig 13.
6.2 Support the heaviest anticipated vehicular traffic weight of 40 Tons
6.3 Manholes shall be designed in compliance with ASTM C857-87, “Standard Practice
for Minimum Structural Design Loading for Underground Pre-cast Concrete Utility
Structures”. Wheel loading shall be HS-20.
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:8 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
6.4 Shall be designed per ACI 318-02 “Building Code Requirements for Structural
Concrete.” 4.6. Design loads shall consist of dead load, live load, impact, surcharge
load, and any other loads which may be imposed upon the structure.
6.5 Application of manhole type relative to site condition and soil bearing capacity shall
be specified.
6.6 The manhole floor should be sloped to the sump pit that have a concrete bottom and
located in the middle of floor below the entry hole and to be connected to drain
system.
6.7 Contractor shall verify all dimension and site condition prior to construction.
6.8 Structural calculation shall be prepared by the contractor and submit to SEC for
review and approval. Contractor shall verify all dimension and site condition prior to
construction.
6.9 Minimum Compressive Strength of Concrete at 28 Days as follows:
6.9.1 Blinding Concrete – 17.2MPa
6.9.2 Reinforced concrete for Structural Members – 34.5 MPa
6.10 A Hock eye to be add in each side, and 3 Hocks eye in the sealing roof as per fig 11,
fig 12 and fig 13.
7.1.1 Cable ducts shall be installed in those areas where access to the cables for
maintenance or repair is restricted. Such locations include areas beneath
existing or future roads and highways, areas in near proximity to structures
or footings where future excavations would be difficult and areas where
additional physical protection to the cables is required and inside the
substation also.
7.1.2 Spacers shall be installed with a maximum horizontal interval of 1.5 meter.
7.1.3 Ducts shall be free from all substances which may injuriously affect any
wire or cable sheath or jacket. The duct shall have a dense, uniform and
homogeneous wall with a smooth interior surface free from obstructions,
rough or flaky areas. The duct shall be non-magnetic, resistant to corrosive
action, unaffected by electrolysis and shall not soften, deform or deteriorate
when exposed to maximum safe operating temperature of cables or upon
immersion for long periods of time in ground water. The bore of the duct
shall be straight and circular in cross section.
7.1.4 Fittings and couplings shall be made of the same grade material as straight
lengths.
7.1.5 The duct and fittings shall be of the tapered sleeve joint type. A coupling
shall be provided for each joint of conduit. Joints for plastic conduit shall
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:9 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
be made with solvent cement after the conduit has been cut square, deburred,
cleaned and dried. The joints shall be manufactured so that they are
sufficiently tight to prevent water, silt or concrete from entering the duct.
7.1.6 The length for each size duct shall be standard with the manufacturer. Each
length shall be marked with the manufacturer's name or trade-mark.
7.1.7 Structural calculation shall be prepared by the contractor and submit to SEC
for review and approval.
7.1.8 A detailed de-rating calculation study for real case should be submitted for
SEC review and approval.
7.1.9 The maximum length of the duct bank between 2 manholes is 150 m or in
every corner bending on the road /unite substation/RMU.
7.2.1 All cable ducts, couplings and accessories shall be installed in strict
compliance with the manufacturer’s instructions.
7.2.2 The ducts material, size, class and type shall conform to 23-TMSS-01. The
system or manner of burial will depend on required physical protection or
loading of structures above the ducts, which shall be specified by Saudi
Electricity Company.
7.2.3 Both ends of all ducts runs shall have end-bells to prevent damage to the
cables during installation.
7.3 Installation
7.3.5 Plug the ends with ducts Seals. Duct sealing unit shall be as per 23-TMSS-
02. The installation and removal of any duct sealing unit shall comply with
the manufacturer’s recommendations.
7.3.6 For the selection of the type of conduits to be used, the following factors
shall be considered:
a) The lower coefficient of friction available. Refer to TES-
P104.05.
b) Heat transfer ability of the material
c) Resistance to deformation and fusion when cables are short
circuited
d) Dimensions of the conduit shall be according to NEMA.
The duct sealing units shall be designed and constructed to maintain sealing efficiency
for a period of 20 years under a constant pressure of 69 kPa (10 psig, 7.05 m of water
head) under service conditions.
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:12 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
8.0 DRAWINGS:
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:13 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:14 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:15 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:16 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE
FIG. 13 – 5M X 5M MANHOLE
Saudi Electricity Company
Distribution Services Sector
CONSTRUCTION STANDARD FOR UNDERGROUND Issue Date: DEC. 2023 Page:19 of 20
DISTRIBUTION NETWORK
PART 19 – GUIDELINES FOR CONCRETE DUCTBANK & SDCS-02-19 REV. 00
MANHOLE