GENERAL NOTES

GENERAL NOTES:
NOTE 1
132-VV-504 132-VV-511 A) SIZE OF HEADER FOR EACH SINGLE SPRAY NOZZLE SHALL BE 1". SPRAY NOZZLE HEAD END
CONNECTION IS NPT MALE THREADED.
3/4"
NC 1" 1" 1" 1" B) HORIZONTAL DRY PIPING. DOWNSTREAM OF THE BLOCK VALVE AND OF THE AUTOMATIC ON-OFF VALVE,
SHALL BE FITTED WITH ADEQUATE DRAIN FACILITIES; WEEP HOLES IN SPRAY HEADERS AND AUTOMATIC
1 DRAIN VALVES SHALL BE PROVIDED AT DIFFERENT LOCATIONS. ALL DRAINS SHOWN ON THIS P&ID ARE FOR 1
4300-SZ-DM-660260015

1" 1" 1" 1" REFERENCE ONLY. FOR ACTUAL LOCATION REFER TO ISOMETRIC DRAWINGS.
1"
1"
66-PP-152-260015

DETAIL "A"

C V
1" 1/2"
CONTRACTOR :

1"x1/2"
1-1/2"x1"
BOROUGE :

1-1/2"x1" 1-1/2"x1" 1-1/2"x1"


DETAIL- "A"

BOTTOM RING

BOTTOM RING
1-1/2"x1" 1-1/2"x1" 1-1/2"x1" 1-1/2"x1" (APPLICABLE FOR ALL SPRAY NOZZLES)

MIDDLE RING

MIDDLE RING
1-1/2"x1" 1-1/2"x1" 1-1/2"x1" 1-1/2"x1"
TOP RING

TOP RING
NOTES:
1). INSPECTOR TEST VALVE 3/4" SHALL BE PROVIDED AT 1200 MM, FROM GRADE LEVEL.

1-1/2"
VALVE SHALL BE DESIGNED TO SEAL IN CLOSED DIRECTION.

1-1/2"
1-1/2"
1-1/2"

1-1/2"
2 2
1-1/2"

1-1/2"
1-1/2"
1-1/2"

1-1/2"

1-1/2"

1-1/2"
REFERENCES:
FOR GENERAL NOTES AND REFERENCES SEE DWG N. FROM PU-PP-152-01000-01÷15;
PIPING AND INSTRUMENTATION DIAGRAM-SYMBOL, ABBREVIATIONS AND NOTES.

PUX-MR-572-00004 FIRE FIGHTING WATER SPRAY DELUGE / SPRINKLER SYSTEMS DATASHEETS


BGS-MU-200 GENERAL SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY

1-1/2"-66-FW-26261-A2RU16-V

1-1/2"-66-FW-26264-A2RU16-V
1-1/2"-66-FW-26260-A2RU16-V

1-1/2"-66-FW-26263-A2RU16-V
BGS-MU-201 GENERAL SPECIFICATION WATER SPRAY FIRE PROTECTION SYSTEMS
1-1/2"-66-FW-26259-A2RU16-V

1-1/2"-66-FW-26262-A2RU16-V
BGS-IS-003 GENERAL SPECIFICATION FIRE AND GAS DETECTION SYSTEMS
P4-PH-567-00002 FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT
P4-PH-563-00001 FIRE & GAS SYSTEM GENERAL SPECIFICATION PO & 1-HEXENE PLANT

1003

1003
PUX-PH-581-00009 DELUGE AND SPRINKLER SYSTEM TECHNICAL SPECIFICATION
1003

1003
1003

1003
PU-PH-407-00001 HYDRAULIC CALCULATION UNDERGROUND FIREWATER NETWORK PO, 1-HEXENE AND U&O
132-PH-407-00001 FIREFIGHTING SYSTEMS HYDRAULIC CALCULATION WATER SPRAY SYSTEM - PE6 PLANT WET
AREA-1 (AREA 00, LOOP REACTOR & JACKET WATER, GAS PHASE REACTOR)
PP-PP-152-260034 PIPING AND INSTRUMENTATION DIAGRAM UNIT-66 - SPRINKLER AND DELUGE
AUTOMATIC AND MANUAL WATER SPRAY DELUGE SYSTEMS 66-SD-13356, POLYETHYLENE (PE 7)

3"x1-1/2" 3"x1-1/2" 3"


3"-66-FW-26270-A2RU16-V 3"
3 3
1003
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,

Q
4"x3"

4"
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.

132-5-66-23 Fire Water Spray Deluge System 66-SD-13256


4" 4"

6"x4"

4 4
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).

Q Q 1" 1"
1" 1"

1"

3"-66-FW-26269-A2RU16-V
Q
Q 1-1/2"x1" 1-1/2"x1" 1-1/2"x1" 1-1/2"x1"
1"

1003
1-1/2"-66-FW-26268-A2RU16-V
1-1/2"-66-FW-26267-A2RU16-V
132-XP-504B 132-XP-504A 132-XP-505B 132-XP-505A
1"-66-FW-26266-A2RU16-V
1"-66-FW-26265-A2RU16-V

TR-TCMS-NSH-P01451
1003

1003
1003
1003

2"x1" 2" 2" 2" 3"


6" 3"x2"

5 5

FIRE WATER
6"-66-FW-26209-A2RU16-V
66-PP-152-260003 26514 DOCUMENT NOTE:
1003 THIS P&ID FOR PE6 IS ISSUED STARTING FROM REV. P SINCE IMPLEMENTING OUTCOME OF P&ID
DELUGE MANIFOLD OF
(SYSTEM 66-SD-13256) REVIEW AND OTHER UPDATES PERFORMED ON P&ID OF PE7.

RATE OF REQUIRED
SL. NO. EQPT. NO. DESCRIPTION HEIGHT(M) SURFACE AREA TYPE
DIA(M) DELUGE SYSTEM APPLICATION FLOW DEMAND NO. OF NOZZLES K-FACTOR CONE ANGLE P4-MR-106-000001
(M2)
(LPM/SQ.M) (M3/HR) COMMODITY / IDENT CODE
Q 27-Sep-2023 APPROVED FOR CONSTRUCTION A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger
1 132-XP-504A(2) + CO-MONOMNER REFLUX PUMP PACKAGE 1.600 5.200 16.64 20.4 53.2 8 64.0 90° MEDIUM VELOCITY 66-SF-3E_SN_P4 / I65500906
Q P 23-Mar-2023 APPROVED FOR DESIGN A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger
132-XP-504B(2) Q
Prepared Checked Approved
Rev. Date Description
By By By
2 132-XP-505A(4) + REC. DILUENT FEED PUMP 1.600 5.700 18.24 20.4 53.2 8 64.0 90° MEDIUM VELOCITY 66-SF-3E_SN_P4 / I65500906
132-XP-505B(4) ABU DHABI POLYMERS COMPANY LIMITED
(BOROUGE)
3 66-SD-13256
132-VV-504 CO-MONOMER COLUMN OVHD DRUM 3.000 7.000 79.13 10.2 73.0 39 18.0 120° MEDIUM VELOCITY 66-SF-3F_SN_P4 / I65500907
6"
PETROCHEMICALS PROJECT
4 132-VV-511 FLUSH DILUENT TANK COMPANY PROJECT NO PROJECT TITLE:
3.000 7.000 79.13 10.2 73.0 39 18.0 120° MEDIUM VELOCITY 66-SF-3F_SN_P4 / I65500907
6 Q 4700000900 BOROUGE 4 PROJECT - EPC PACKAGE 3 - 6
CONTRACTOR PROJECT NO
4300 - PO
PO UNIT - RUWAIS, UAE
TOTAL 278.5
Q DRAWING TITLE: PIPING AND INSTRUMENTATION DIAGRAM
UNIT 66, SPRINKLER AND DELUGE, WATER SPRAY DELUGE SYSTEM 66-SD-13256
POLYETHYLENE (PE6)
BOROUGE DOCUMENT CLASS' N PROJECT DRAWING NO REV: Q

CONTRACTOR: 4300-SZ-DM-660260015 SHEET UNIT: 66


1 BOROUGE: 66-PP-152-260015 OF AREA: 26
CADD SHEET
A B C D E F REF. 66-PP-152-260015-ISQ SCALE: SIZE A1

You might also like