User Manual MPPT MEH160 200 V1.02
User Manual MPPT MEH160 200 V1.02
User Manual MPPT MEH160 200 V1.02
lk
day. The charging time exceeds 1 minute. The load will be automatically turned on at night. If the duration of load light. Therefore, it is suitable for use in areas with more cloudy and rainy days or poor remote control signal is easily attenuated under outdoors strong light. The remote control
Bu
Floating charge voltage
batteries/lithium batteries/colloidal batteries, etc. and widely applicable to solar street lamps, solar Charge return voltage charging time is less than 1 minute, the light will not on at night, and the controller dormancy shall lighting. communication distance is 5-6m. At night, the remote control communication distance 8-10m; the
courtyard lamps, etc. The product has characteristics such as high reliability, high efficiency, high continue. Middle-The storage battery at the starting point of power reduction has proper capacity and proper
B. If [PV awakening] function is selected as [no], after controller dormancy, if the photovoltaic panel is wireless remote control signal can penetrate the plastic shell or the aluminum shell. The wireless
precision, simple installation and easy maintenance. on duration of load light. Therefore, it is suitable for use in areas with requirements on both
connected, the controller charging can be awakened in days if the charging condition is satisfied in days. luminance and rainy days; remote control distance can be adjusted with a remote controller at 0.3m-20m.
Time Time
However, at night, the controller shall further enter into the dormancy state. Low-The storage battery at the starting point of power reduction has proper capacity and proper on The specific remote controller [parameter setting] and [operation status] are as follows:
Product characteristics (Note: [PV awakening] function can be selected with CU remote controller. 2.4 G wireless remote control Parameter setting:
Charging current Charging current duration of load light. Therefore, it is suitable for use in areas with higher requirements on luminance
MPPT maximum power tracking technology has as high as 99.5% tracking efficiency and as high as Duration Time:2h type can only be awakened with PV) effect.
(10~600min)
96% charging conversion efficiency. Time:3h Load power Parameter Name Default Parameter Parameter Range
Controller After Intelligent Power Curve
With DC detection function and DC, when battery voltage drops to DC switching voltage point, it Max. current 30
State Dormancy Awakening-R Awakening -W Charging Discharging dormancy Battery type Lead Lead/ lithium 12V/ lithium 24V
MEH Series
shall switch to DC power supply automatically. Without DC, when the battery continues to discharge Awakening LED indicator 25
beyond the over-discharge point, close the output. Way light State Induction delay No No
20
Settable switching voltage. Button Cannot be PV awakening Yes No/yes
CU-ALL5 Button ON -- -- All off 15 #1-High
Lead-acid batteries and lithium batteries are universal. Operating parameters can be set with a OFF awakened
Time Time #2-Intermediate
Light-controlled voltage 5V 3V-11V
remote controller.
Gen4 Intelligent MPPT Button 10
Charging Phase Diagram of Lead-acid Battery Charging Phase Diagram of CU-mini2 Button ON -- -- -- All off #3-Low Light-controlled delay 10s 5s-60min
Very low dormancy current, more energy-saving and convenient for long-distance transportation and OFF 5
storage Lithium Battery The controller starts with in 10 seconds Normal After awakening, the Over-discharge voltage 11.0V 9.00V-17.0V
AC/DC Hybrid Multistage temperature compensation and constant voltage charging of lead-acid batteries after the PV voltage is greater than charging load light shall be
0
Time
22:23:20
23:07:50
23:52:20
0:36:50
1:21:20
2:05:50
2:50:20
3:34:50
4:19:20
5:03:50
5:48:20
6:32:50
7:17:20
8:01:50
8:46:20
9:30:50
10:15:20
11:00:20
11:44:50
12:29:20
13:13:50
13:58:20
14:42:50
15:27:20
Bulk Charging the battery voltage by +1V, the load on automatically for Over-discharge return 12.6V 9.00V-17.0V
10-period programmable load power/time control PV awakening in days
-- is turned on for 10 seconds, and the 10s. Test whether the --
Solar Charge Controller High and low temperature protection function for storage battery in charging and discharging, and
settable operation temperature
In bulk charge stage, the battery voltage has not reached the set value of full voltage (i.e.
balanced/boost voltage), and the controller will charge the battery with MPPT and provide the
[yes] controller is awakened after charging
for 1 minute.
load is normal. The
load discharge Intelligent power experimental data
Boost charging
Floating charge
14.4V
13.8V
9.00V-17.0V
9.00V-17.0V
maximum solar energy to charge the battery. When the voltage reaches the preset value, the battery
With Step-up LED Driver Various intelligent power modes can be selected to automatically adjust the load power according to
the battery power. will be charged at constant voltage. The controller starts within 10 seconds
normally at night.
After awakening, the Comparison of Intelligent Power Consumption and Rainy Days
Charging at low temperature -35℃ -35℃-0℃
High precision digital boost constant current control algorithm, high efficiency and high constant after the PV voltage is greater than Normal load light shall be on Operation at high temperature 65℃ 40℃-90℃
Intelligent Power Grade Daily Power Consumption Continuous operation days
12V/24V current accuracy Constant Charging the battery voltage by +1V, the load charging automatically for 10s. Load current 0.33A 0.15A-7.0A
PV awakening is turned on for 10 seconds, and the Test whether the load No 100% 1
With infrared wireless communication, parameters can be set/read, states can be read, etc. When the battery voltage reaches the set value of the customer voltage, the controller will charge at a -- controller is awakened after charging in days --
[no] is normal; without Intelligent power Intermediate No/high/intermediate/low/automatic /*USE
Multiple protection functions, such as battery/PV reverse connection protection, LED short constant voltage without MPPT charge in the process. At the same time, the charging current will for 1 minute. discharge at night, Low 50% 2
circuit/open circuit/limited power protection, etc. the load dormancy
* Derating start 12.4V 9.00V-17.0V
gradually decrease with time. Customer charging is divided into two stages, namely, balanced Middle 25% 4
Extensible IoT remote communication and monitoring functions (-U/-C series) shall further continue. *Derating finish 11.4V 9.00V-17.0V
User Manual
charging and boost charging. These two charging processes are not repeated. Wherein, the balanced High
With all-aluminium metal shell and IP67 waterproof grade, it can be used in various severe 15% 6
charging is started once every 30 days. * Minimum current 0.15A 0.05A-1.00A
environments. 2.3 State of Indicator Light and Remote Controller Test Description: 1. Test battery is fully charged and loads have consistent maximum power and
The state of indicator light of the controller is shown below: operation duration. The Nth time 00:00-15:00
Boost Charging
2. Operation Instruction State of Remote
It is assumed that the power consumption at closure of intelligent power is 100%. Setting of load parameter
The Nth power 0%-100%
The default duration of the boost charging stage is 2 hours. Customers can also adjust the Indicator Light State of Indicator Light Description of Indicator Light The test result is the test data obtained under single condition (daily charging amount is 0).
maintenance time and the preset value of the boost voltage point according to actual demands. Controller System The practical use condition may be different from the test condition and the test result is only for Restore default No No/yes
Battery panel voltage is greater than the reference.
Product Type Application Scene 2.1 Introduction to MPPT Charging: When the duration reaches the set value, the system will be transferred to floating charging. Normally on
light-controlled voltage
Idling Switching voltage 11.5V 9.00V-17.0V
MEH160-W 160W Municipal Electricity Complementation MPPT Operation point of common controller Equalizing charge Battery panel voltage is smaller than the
Automatic-intelligent power mode can automatically select the high/middle/low shifts for operation
Charging Control Constant Current All-In-One Machine, Off Idling according to the charging amount, power consumption and other parameters on the day. Default value set for load parameter:
Current
Certain types of batteries benefiting from regular balanced charging can agitate the electrolytes, light-controlled voltage
2.4G Wireless Remote Controller Maximum power point For example, in summer, more charging quantities are required, operating at intelligent mode - low;
balance battery voltage and complete chemical reactions. Balanced charging increases the battery ① Slow flash Charging Charge there are better lighting effects; in winter, less charging quantities are required, operating at intelligent Duration Hour/minute Power of duration
MEH200-R 160W Municipal Electricity Complementation MPPT voltage so that it is higher than the standard complementary voltage and gasifies the battery PV indicator light mode - high; the load operating in power saving mode can withstand more rainy days.
Double flash Fully charged battery Full charge 1 00:30 50%
Charging Control Constant Current Integrated Machine, USE (Custom) - Users set the derating start point voltage, derating finish voltage and minimum load
electrolyte. If the detection controller automatically controls the following charge for balanced BMS protection of lithium battery E-BMS
Infrared Remote Controller 2 00:30 70%
charging, the balanced charging shall last for 120 minutes (default). Balanced charging and boost Or BAT excessive voltage BV excessive temperature current value for intelligent power.
MEH200-W 200W Municipal Electricity Complementation MPPT Quick flash 3 02:00 100%
charging are not repeated during a full charging process to avoid too much precipitated gas or Or PV excessive voltage PV excessive temperature
Charging Control Constant Current All-In-One Machine, Or over temperature (ambient temperature) Over-temperature Load current (mA) Derating start voltage 4 00:30 70%
battery overheating.
2.4G Wireless Remote Controller
Normally on Normal operation of storage battery Idling 5 00:30 50%
Voltage Floating Charging ②
MEH200-R 200W Municipal Electricity Complementation MPPT Battery is not connected or over-discharge
Off / 6 04:00 30%
Charging Control Constant Current Integrated Machine, Taking 12V battery as the example Floating charging is a continuous charging stage after which the controller shall decrease the BAT indicator light protection of lithium battery protection panel Derating finish voltage
Infrared Remote Controller battery voltage by reducing the charging current and keep the battery voltage at the set value of 7
Quick flash Over-discharge of battery Over discharge
Maximum Power Point Tracking (MPPT) is an advanced charging method. MPPT controller can floating charging voltage. In the floating charging stage, the battery is charged very slightly to 8
Normally on Load opening Discharge 00:00 0%
detect the power generated by solar panels in real time and track the maximum voltage and current ensure that the battery is maintained in full state. In the floating charging stage, the load can obtain 9
③ Off Load off Idling
value (VI), so that the system can charge the battery at the highest efficiency. Compared with the nearly all the solar energy. If the load exceeds the electric quantity provided by the solar energy, the Minimum load current
LOAD indicator light Slow flash Open circuit of load Open circuit Morning light
traditional PWM controller, MPPT controller can give play to the maximum power of the battery controller will not be able to maintain the battery voltage at the floating charge stage. When the
Double flash Short circuit of load Short circuit 150mA
panel, so it can provide greater charging current. Generally speaking, MPPT can improve the energy battery voltage is low enough to raise and resume the set charging value, the system will exit from
Off No DC access /
u t i l i z a t i o n r a t i o b y 1 5 % - 2 0 % c o m p a r e d w i t h t h e P W M c o n t r o l l e r. the floating charging stage and return to the fast charging stage again. ④ Slow flash DC access / Status data:
MPPT cannot be used independently as a charging stage. Usually it needs to be combined with 12.7V 12.0V Voltage of storage battery (V)
DC indicator light Normally on With DC access, and load power is supplied by DC / In any interface, [operation state] data of the controller can be read by pressing key [state] of the
elevation charging, floating charging, balanced charging and other charging methods to jointly
Quick flash Abnormal DC voltage / No (turn off) -turn off the intelligent power and load power is output according to the power at the set remote controller.
Version: V1.02 complete the battery charging.
No communication duration. In any interface, press key [state] of the remote controller for long time to enter into sub-menu of
Any change shall not be notified in advance. A complete lead-acid battery charging process includes fast charging, maintenance charging and Four indicator light Under lead-acid cell mode, only DC power can be performed, Note: When the intelligent power is turned on, the intelligent power will take effect only when power is
floating charging. There is no balanced charging or floating charging process in the charging ①②③④ flashes in flowing [state data], choose to read [operation state]/ [historical data]. After choosing [operation state] or
or solar panel is connected. waiting for storage
at 1Hz supplied to load from the battery. When the power is supplied from DC, the load power is equal to the
process of lithium batteries. battery connection. [historical data], press key [state] to read corresponding state data.
power at the set current duration.
Operation State: 2.6 Dimensional Figure:
4. Protection Function 5.Electrical Connection Diagram 7.Common Abnormity and Treating Method
Name of State Example Description of State Value
System state Discharge Current operation state: discharge/charge/idle/full ● Waterproof protection
/over-discharge, etc. Waterproof grade: Ip67 No. Phenomenon Problem Treatment Method
Wrong password of remote B1. Press keys "+" and "-" at the same time to call out [remote
Battery voltage 12.3V Current voltage of battery ● Overcharge Detection Protection for Lithium Batteries BMS controller controller setting] interface and set a correct password.
Gen4 Intelligent MPPT
MEH200 dimensions are shown below: When the controller detects BMS overcharge protection, the controller immediately stops charging to AC/DC Hybrid Incorrect operation way is B2. Press keys "+" and "-" at the same time to call out [remote
PV voltage 17.6V Current solar panel voltage Product dimension: 155*114.4*34mm
Solar Charge Controller
With Step-up LED Driver selected for remote controller setting] interface, and then select [infrared remote
prevent the high voltage at the photovoltaic end from being added to both ends of BMS for long time, Remote controller controller (infrared or controller] or [wireless remote controller]
Charging current 0.0A Current charging current Installation size: 102*123mm 1 cannot be used. wireless) C1. Press keys "+" and "-" at the same time to call out [remote
thereby resulting in the high voltage damage of BMS; Wireless remote control controller setting] interface, and then perform test after turning
Hole size: Φ3.5mm Model MEH200-R
Charging power 0.0W Current charging power ● Low Temperature Charging Protection for Lithium Batteries Syste m Voltage 12V 24V
distance is too short up [remote control distance] option.
Dimensional size of controller:
Max.Solar Powe r 260W 520W
Charging ampere-hour 0.01AH Charging ampere-hour on the day Max.Charg ing Curre nt
200W
of remote controller
LEDs Voltage 15V~75V 30V~75V
irreversible damage to lithium battery caused by low temperature charging; Power Supply Voltage 10V~14V 20V~28V
The controller has A. Battery power supply A1. Check whether the battery wiring is in good condition
Load voltage 27.1V Current load voltage
Connect with Exte rnal
Hybrid Mode
no response when problems A2. Whether there is voltage at the storage battery terminal,
AC /DC Powe r Supply
● High temperature protection connected to the B. Controller dormancy whether the protection board is protected. If there is no voltage
Load current 0.19A Current load current When the ambient temperature is higher than the set value, the controller stops charging and 4 battery, the at the storage battery terminal, activate the storage battery by
indicator light is charging the storage battery.
Load power 5.15W Current load power discharging to prevent the risk of lithium battery damage caused by excessive temperature; 3 2 not on, and the B1. Activate the controller by pressing key "ON" of the remote
AC/DC remote controller controller.
AC220V input
Lighting duration 05:20 Practically total illumination duration on the night ● Reverse polarity protection of storage battery switch
power is unresponsive. B2. Connect the battery panel to activate the battery by
activation.
The system will not operate after the battery is connected with reverse polarities, thereby it shall not
Illumination duration for actually induced human power
Induction duration 01:10 burn out the controller.
on the night 3.Technical Parameter ● Overvoltage protection of photovoltaic input end
2 Charging
normal during the
is A. Dormancy
controller
state of A1. Activate the controller by pressing key "ON" of the remote
controller.
Discharge ampere-hour 2.05AH Discharge ampere-hour on the night day, but the load A2. Please select <PV awakening> as yes, the controller is
In case of excessive voltage at the input end of the photovoltaic panel, the controller will automatically 1 light is not on at activated automatically after charging in days.
3 night, and the LED
Ambient temperature 23℃ Presently internal temperature Adjustable Default cut off the photovoltaic input.
Parameter Name Parameter Value indicator light on
Operation days 15D Accumulated operation days Parameter Value ● Short circuit protection for photovoltaic input end the controller is
still not on.
Model MEH160 MEH200 Wiring sequence: Please connect the load first, then the battery, then the solar panel, and finally the DC.
Overdischarge times 2N Total overdischarge times of lithium batteries When the input end of photovoltaic array is short-circuited, the controller disconnects the charging. Battery indicator A. Insufficient battery A1. Inspect whether the battery panel is charged normally and
Remote control type 2.4G wireless remote control -MEH200-W; infrared remote control -MEH200-R Please don't connect 220V AC directly to the controller! light flashes capacity whether the battery panel is blocked.
When the short circuit condition is cleared, the charging will restore automatically.
Full charging times 10N Total full charge times of lithium batteries System voltage 12V/24V √ Lead 4 quickly, LED lamp A2. Inspect whether the wire between the storage battery and
● Photovoltaic input reverse connection protection When system voltage is [lithium 12V] or [lithium 24V], even if no battery, but only DC power, solar panel holder of the load the battery panel is broken or loose.
-R Infrared: < 10mA/12V; <7mA/24V is not on.
Date of manufacture 1909 Production date of controller Static power consumption
-W Wireless: < 30mA/12V; <15mA/24V When the polarity of photovoltaic array is connected reversely, the controller will not be damaged and it and load are connected, the controller can operate normally;
When system voltage is [lead], in the first poweron, the controller can operate normally after the battery Short light on Insufficient storage battery A1. Inspect whether the battery panel is charged normally, or
Software version 1000 Software version number of controller Sleep power consumption <1mA/12&24V will continue to operate normally after correcting wiring errors. time for load capacity configured correctly.
Load current 50mA~5600mA 50mA~7000mA √ 330mA ● Limited power protection of load is connected for automatic identification of system voltage. Excessive load power A2. Inspect whether there is single battery protection condition
5 for the lithium battery.
2.5.2 Remote controller CU-mini2: Load voltage 15V~75V When power of LED lamp holder used by the customer is too large or the load current is adjusted too A3. Open "intelligent power" option.
Small remote controller CU-mini2 is used for on/off and test.
Load maximum power 80W/12V ;160W/24V 100W/12V ;200W/24V large, the controller will limit the load power output to be less than the rated power to ensure that the 6.Complementar y Function of Commercial Power B1. Inspect whether controller current is set correctly and
whether the load power is normal.
Load conversion efficiency 90% ~ 96%
controller and the LED load will not be damaged. Load light on A. Intelligent power A1. Close "intelligent power" and then test the load current.
Load current accuracy < 3% current does not regulation load current B1. Turn down the set current or replace less lamp holders
Controller awakening Controller dormancy ● Load overload and short circuit protection Commercial power switching function of MEH series controller has two functions: battery priority and 6 reach the set B. LED lamp holder power connected in the series.
Load power High/intermediate/low/automatic/custom/no √ Middle
value exceeds the rated power
ON OFF In case of less lamp holders and beads (3 strings or less) connected in series with the lo ad, the controller market priority.
Load operation period Nine periods + morning light Load indicator Open circuit of load A1. Please inspect whether the load wire is correct and whether
will stop output immediately to prevent LED load or the controller against damage; In case of any short 6.1 Battery Priority: light flashes and Short circuit of LED load LED positive and negative poles are connected reversely.
Period regulation range 1 minute/10 minutes
circuit, the controller will immediately cut off the load output to prevent the controller against damage. When the battery voltage is higher than the [switching voltage], the battery power should be used load LED light is wire or too few LED lamp B1. Please inspect whether the load wire is short circuited and
Power regulation range 1%/10% not on. holder connected in series whether LED positive and negative poles are connected
+10%
After the load short-circuit condition is relieved, the controller can restore output automatically within 1 preferentially; when the battery voltage is lower than the power supply and [switching voltage] is set 7 reversely.
Maximum solar input power 200W/12V;400W/24V 260W/12V;520W/24V
B2. Please inspect whether LED lamps are connected in series
70% 50% 30%
Load test command Maximum charging current 15A 20A minute (in case of short circuit for long time, the controller can restore output automatically within 1 lower than the battery voltage, the battery is in the preferential mode. correctly and substitute LED lamp holders with suitable
hour), or you can also press the test key of the remote controller (CU or mini2) for 10s for restoring 6.2 Municipal Electricity Priority: quantities connected in series or parallel.
-10% Solar input voltage ≤ 95V
Light cannot be A. There is a problem with A1. Substitute boost lamp holder (more than 5 in series).
Overvoltage Lead-acid battery: 16V; lithium battery: charging voltage +2V; x2/24V output automatically. In case of municipal power access, municipal power shall be supplied to the load preferentially. When adjusted via LED number of lamp holder
Equalizing charge voltage Lead-acid battery: 14.6V; lithium battery: without balanced charge; X2/24V ● Open protection of load there is no municipal power or the municipal power voltage is incorrect, it shall switch to battery for load lamp holder connected in series. Lamp
8 holders are connected in 3
Equalizing charge interval 30 days When the load wire is disconnected suddenly during normal on of LED load light, the controller can power supply. When [switching voltage] is set higher than the maximum voltage of the battery, the circuits or voltage drop
Green power is changing our life.
Boost charging voltage (lead acid) lamp holders are used.
9.00V -17.00V settable; x2/24V √ 14.4V immediately turn off the load output and protect the controller from damage. When the load commercial power is in the preferential mode.
Charging voltage (lithium) Light cannot be Battery panels are not A1. Inspect whether the battery panels are connected correctly
connection is restored, the controller automatically restores the output within 10 seconds (in case of 6.3 When the commercial power complementary controller is in use, it is required to pay attention adjusted via LED connected and whether wires are connected reliably.
Icons and description about seven keys [ON], [OFF], [70%], [50%], [30%], [+10%] and [-10%] are shown below: Floating charging voltage (lead acid) 9 load lamp holder Battery panels are B1. Battery panel wires are connected reversely in days and
9.00V -17.00V settable; x2/24V √ 13.8V open circuit for long time, the output shall be restored once at every 1 hour), or the output can be to: connected reversely. observe whether the indicator light for charging flashes.
Charging return voltage (lithium)
restored automatically after pressing the test key of the remote controller (CU or mini2). A. AC/DC power only supplies power to the load, but not to the battery. With sunshine in A. Battery panel failure or A1. Inspect whether the solar panel is connected correctly and
Icon Key Description Over-discharge voltage 9.00V -17.00V settable; x2/24V √ 11.0V
● Reverse charge protection at night B. AC/DC power supply range: 10~14V/12V system; 20~28V/24V system, the controller will not be days, the charging battery panel wiring error reliably and whether the solar panel is covered.
Over-discharge return voltage 9.00V -17.00V settable; x2/24V √ 12.6V indicator light
10
ON Controller is awakened from dormancy At night, the storage battery shall be protected against discharge via the battery panel. connected to the commercial power if beyond the range. shall not flash
Switching voltage 9.00V -17.00V settable; x2/24V √ 11.5V slowly for
DC voltage input range 10-14V/12V system; 20-28V/24V system ● TVS lightning protection at night C. In case of normal access of AC/DC power, the battery voltage drops to the DC switching voltage charging.
OFF Controller enters into dormancy mode with low power consumption Light control voltage 3V ~ 11V ;×2/24V √ 5V point, and the load is automatically switched to DC power supply. If there is no DC access or DC range is LED load is not on A. Battery panel voltage is A1. Wait for automatic on after voltage of the battery panel is
and storage not lower than the reduced.
Temperature compensation Lead acid battery: -3.mV/℃/2V; incorrect, the accumulator shall continuously discharge to the overdischarge point for closure and 11 battery indicator light-controlled voltage or B1. The controller is recharged for resetting the timer.
70% The controller operates for one minute at 70% of the set load current coefficient lithium battery: without temperature compensation light is normally delay time is not up.
output. on. B. Controller time is up.
Light control delay 5s~60s/2min~60min √ 10s
D. Switching voltage point can be set via the remote controller. Charge indicator A. Overcharging protection A1. Wait until the voltage of lithium battery is reduced to the
50% The controller operates for one minute at 50% of the set load current High temperature operation 40℃ ~ +90℃ √ 65℃
E. In the course of using, if the battery is removed, under normal power supply condition of battery light flashes of lithium battery BMS overcharge return voltage, restore charging automatically.
Low temperature charging 0℃ ~ -35℃ √ -35℃ 12 quickly, and there protection board
30% The controller operates for one minute at 30% of the set load current Operation temperature -35℃ ~ +65℃ panel and AC/DC power, DC power can be supplied to the load at night and the load can operate is no charge
current.
IP rating IP67 normally.
The test current is increased by 10% and the device operates for 1
Reverse polarity protection of storage battery, reverse polarity protection of F. When the intelligent power is turned on and the load is switched to DC power supply, the intelligent
+10%
minute after each press battery, overvoltage protection of battery panel, overcharge and overdishcarge
Protection function protection of lithium battery, BMS overcharge detection protection of lithium
power fails, and the current power of the load is the power set for the period.
The test current is decreased by 10% and the device operates for 1
-10%
minute after each press battery, overtemperature protection, load open-circuit and short-circuit G. In order to ensure reliability and stability of the system, please ensure that the output power of
protection, load overcurrent protection, etc.
AC/DC power supply is more than 1.2 times of the maximum operating power of the load; AC/DC power
Weight 780g
output is constant voltage source output. The output voltage maintains unchanged.
Code:104149