6 Sigma
6 Sigma
6 Sigma
3. Black belts: They receive four weeks of trainings and are directly
involved in the implementation of Six Sigma Projects. They are the
project leaders and go through in-depth training on Six Sigma
approach and tools and work full time on the project.
4. Master Black Belts: These are the people who conduct Six Sigma
Training and also have on the job training and experience
Six Sigma Methods
Service
Adminis
Design
tration
Six
Sigma
Methods
Manage producti
ment on
IT
APPROACHES OF SIX SIGMA
THIS IS ORGANIZATIONAL BASED
THIS IS BASED ON CUSTOMER NEEDS AND
SATIFACTIONS
It approach undertaken to improve existing business process
CONTRL
DEFINE
IMPROVE
ANALYSE MEASURE
1.Define high-level project goals and the current process.
2.Measure key aspects of the current process and collect relevant data.
4.Improve or optimize the process based upon data analysis using various tools
5.Control to ensure that any deviations from target are corrected before they
result in defects.
This approach is undertaken when there is a need to create new design or
product:
VERIFY
DEFINE
DESIGN
MEASURE
ANALYZE
Define design goals that are consistent with customer demands and the
enterprise strategy.
Design details, optimize the design, and plan for design verification. This
phase may require simulations.
Verify the design, set up pilot runs, implement the production process and
hand it over to the process owners.
DMADV is also known as DFSS, an abbreviation of "Design For Six
Sigma
DMAIC DMADV
Defines a business process. Define customer needs