Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

170BR 001 Rcblo

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SECTION SHEET

STATE PROJECT NUMBER


23 U.S.C. 407 NO. NO.

NDDOT Reserves All Objections ND project number 170 1

106'-0"

6'-0" 53'-0" 53'-0" 6'-0"

7 7
5'-1 8" 5'-1 8"
Reference Reference
Line Line

` Roadway

20^

D D

Flow
Flow

` Box
Culvert
B B
` Box Outlet Invert
Inlet Invert Sta 2331+00.00 Finished
Culvert El 1857.50
El 1857.40 Channel
(typ)

(typ)
9'-0"
(typ)
9'-0"
(typ)
A A
10'
-0"
Ri
prap 20'
-0"
Ri
prap
C C END VIEW

PLAN
DESIGN STRENGTHS:
NOTE:
f'c = 3,000 psi ~ Class AE-3 Concrete
See Dwg 0-000.000-10 for Sections A-A and B-B. fy = 60,000 psi ~ Reinforcing Steel
See Dwg 0-000.000-11 for Sections C-C and D-D.

Load & Resistance Factor Design

(typ)
2'-0"
SPECIAL PROVISIONS
Geosynthetic Material
Type RR SSP 2 MIGRATORY BIRD TREATY ACT
ELEVATION
(typ under all riprap)

HL-93 DESIGN LOADING

HYDRAULIC DATA: BOX CULVERT BID ITEMS LOCATION


20^ SKEW
Drainage Area 93.3 sq mi SPEC CODE ITEM DESCRIPTION UNIT QUANTITY
Stream Gradient 0.0002 ft/ft This drawing CLEAR SPAN 3 x 9' CLEAR HEIGHT 9'
Design Frequency 50 yr MAXIMUM FILL 0' STATION: 2331+00.00
202 0105 REMOVAL OF STRUCTURE L SUM 1
Design Discharge 1255 cfs 210 0050 BOX CULVERT EXCAVATION EA 1 is preliminary
R Y REINFORCED CONCRETE
Design Headwater Stage 1867.5 ft 210 0210 FOUNDATION FILL CY 725
N A
and not for TRIPLE BOX CULVERT LAYOUT
Design Tailwater Stage 1867.0 ft 210 0405 FOUNDATION PREPARATION-BOX CULVERT EA 1
M I
Velocity Through Bridge 5.8 fps 256 0200 RIPRAP GRADE II CY 95
L I
construction or ND DEPARTMENT OF TRANSPORTATION
100-Year Frequency Discharge 1687 cfs 602 1131 CLASS AE-3 CONCRETE-BOX CULVERT CY 323.5
R E BRIDGE DIVISION

Pimplementation
100-Year Frequency Headwater 1869.5 ft 612 0114 REINFORCING STEEL-GRADE 60-BOX CULVERT LBS 45,747
Overtopping Stage 1873.30 ft 709 0100 GEOSYNTHETIC MATERIAL TYPE G SY 530
Overtopping Discharge 2159È cfs 709 0155 GEOSYNTHETIC MATERIAL TYPE RR SY 190
purposes.

10/11/2022 3:05:00 PM acahlin R:\SUPPORT\Teams\Bridge\Bridge Plan Stds\Box_Culvert_20_Skew\2022\Box_Culvert_20_Skew\170BR_001_RCBLO.dgn XXX XXX 0-000.000-1

You might also like