VPR-R&B 25.06.2023
VPR-R&B 25.06.2023
VPR-R&B 25.06.2023
Core @N/mm2 ( C )
Diameter (D) (mm)
(1.25*C*F) N/mm2
Strength N/mm2
Location*
L/D Ratio
N/mm2
Sl.No
(mm)
Mattamadugu-KM 37/600
1 Left Span-L/s 25M 201 143 1.406 328.98 20.48 0.935 19.14 23.92 68.35
2 Left Span-Center 50M M35 212 143 1.483 549.52 34.20 0.943 32.25 40.32 115.20 31.44 29.75
3 Left Span-R/s 75M 205 143 1.434 412.20 25.65 0.938 24.06 30.07 85.92
4 Right Span-L/s 100M 202 143 1.413 393.83 24.51 0.935 22.93 28.66 81.88
5 Right Span-Center 125M M35 205 143 1.434 337.42 21.00 0.938 19.69 24.62 70.33 27.48 29.75
6 Right Span-R/s 175M 202 143 1.413 400.57 24.93 0.935 23.32 29.15 83.29
Vengamambapuram-KM 40/200
7 Left Span-L/s 25M 203 143 1.420 495.56 30.84 0.936 28.87 36.09 103.12
8 Left Span-Center 50M M35 200 143 1.399 428.68 26.68 0.934 24.92 31.14 88.98 28.80 29.75
9 Left Span-R/s 75M 203 143 1.420 262.99 16.37 0.936 15.32 19.15 54.73
10 Right Span-L/s 100M 205 143 1.434 398.13 24.78 0.938 23.24 29.04 82.98
11 Right Span-Center 125M M35 203 143 1.420 481.66 29.98 0.936 28.06 35.08 100.23 31.95 29.75
12 Right Span-R/s 175M 204 143 1.427 435.38 27.10 0.937 25.39 31.74 90.67
Ambalapudi-KM 48/600
13 Left Span-L/s 35M 205 143 1.434 425.77 26.50 0.938 24.85 31.06 88.74
14 Left Span-Center 70M M35 206 143 1.441 456.46 28.41 0.938 26.66 33.33 95.22 31.75 29.75
15 Left Span-R/s 105M 185 143 1.294 430.29 26.78 0.922 24.70 30.88 88.21
16 Right Span-L/s 140M 204 143 1.427 491.92 30.62 0.937 28.69 35.86 102.45
17 Right Span-Center 175M M35 203 143 1.420 484.33 30.14 0.936 28.22 35.27 100.78 32.70 29.75
18 Right Span-R/s 210M 203 143 1.420 370.37 23.05 0.936 21.58 26.97 77.07
Page 2 of 2
Core @N/mm2 ( C )
Diameter (D) (mm)
(1.25*C*F) N/mm2
Strength N/mm2
Location*
L/D Ratio
N/mm2
Sl.No
(mm)
Mattamadugu-KM 37/600
1 Left Span-L/s 25M 201 143 1.406 378.55 23.56 0.935 22.02 27.53 78.64
2 Left Span-Center 50M M35 212 143 1.483 549.52 34.20 0.943 32.25 40.32 115.20 32.64 29.75
3 Left Span-R/s 75M 205 143 1.434 412.20 25.65 0.938 24.06 30.07 85.92
4 Right Span-L/s 100M 202 143 1.413 426.65 26.55 0.935 24.84 31.05 88.71
5 Right Span-Center 125M M35 205 143 1.434 385.65 24.00 0.938 22.51 28.13 80.38 30.05 29.75
6 Right Span-R/s 175M 202 143 1.413 425.65 26.49 0.935 24.78 30.98 88.50
Vengamambapuram-KM 40/200
7 Left Span-L/s 25M 203 143 1.420 495.56 30.84 0.936 28.87 36.09 103.12
8 Left Span-Center 50M M35 200 143 1.399 428.68 26.68 0.934 24.92 31.14 88.98 31.45 29.75
9 Left Span-R/s 75M 203 143 1.420 372.25 23.17 0.936 21.69 27.11 77.46
10 Right Span-L/s 100M 205 143 1.434 398.13 24.78 0.938 23.24 29.04 82.98
11 Right Span-Center 125M M35 203 143 1.420 481.66 29.98 0.936 28.06 35.08 100.23 31.95 29.75
12 Right Span-R/s 175M 204 143 1.427 435.38 27.10 0.937 25.39 31.74 90.67
Ambalapudi-KM 48/600
13 Left Span-L/s 35M 205 143 1.434 425.77 26.50 0.938 24.85 31.06 88.74
14 Left Span-Center 70M M35 206 143 1.441 456.46 28.41 0.938 26.66 33.33 95.22 31.75 29.75
15 Left Span-R/s 105M 185 143 1.294 430.29 26.78 0.922 24.70 30.88 88.21
16 Right Span-L/s 140M 204 143 1.427 491.92 30.62 0.937 28.69 35.86 102.45
17 Right Span-Center 175M M35 203 143 1.420 484.33 30.14 0.936 28.22 35.27 100.78 32.70 29.75
18 Right Span-R/s 210M 203 143 1.420 370.37 23.05 0.936 21.58 26.97 77.07