TATA MOTORS Work Instruction

PASSANGER IMS Manual


VEHICLE LTD Production Planning and Control
Page 1 OF 1
Subject SOP PPC- PBS ( Distribution Point ) Issue no 1
Position: Planning TCF1 & TCF2 Vin generation Shift: A/B/C Revision 08-07-2024

Sr.No Activity Ref. Remarks


PPE Matrix/
1 Use PPE & Follow Safety Instructions,Maintain 5'S" SHE Board/Tool
Box Talk

2 Check attendance for any information about from last shift person attendance -book

Check all parameters of Painted cab as per Checklist. If any parameter found Not-ok, Tata Motor
3
immediately inform to PPC shift in-charge. Checklist
Plan as per Engine, Main Wiring Harness, Cockpit Wiring Harnesss clearance from
4 TCF1 & TCF2
logistics & wearhousing team
5 Line up cabs model wise ( CNG, NOVA, EV, Non-CNG, TCF1, TCF 2 )
Line-up by Conveyor line selection station PC

TCF1 & TCF2,


6
Hold cab

Cab Checking every time - ( Number plate,Weld number, Colour, Model , Whether the
cab sits properly on the hanger or not,Barcode checkss on cabs )

7 TCF1 & TCF2


↑ Cab condition ↑ Barcode & BIW number

↑ Checking cab
Cab Checking every time on DPT- ( Weld number, Colour, Model )

9 empty hanger move to By-pass line & lifting line


Making a
10 Making a Separate line for - Shortage for Material, Hold cab, Project cab
Separate line
If there is any BIW problem we take physical MAT number on the chassis on the lower
11
side of door on cab, and report to senior/IPMS
takes hold cab report by looking the MAT number, Colour, Model, Why is hold takes the
12
data on cab
PBS - Bank 1,
13 Immediately inform incharge & Maintenance team aafter conveyor break-down Bank 2, Lifting
line
14 Immediately inform incharge aafter PC hang issue ( IPMS problem )

15 To make a T-60 & T-40 full by ok painted cab


16 At the end of the shift, inform the next shift person with the necessary information

Referance Prepared By Review & Issue Approved by


ISO
ISO
IATF16949 18001
14001

7.1.3.1
8.1.1
8.4.2.1 - - Manoj.M.Kulkarni
8.5.4.1
INTREGREATED MAANAGEMENT SYSMTEM
TATA MOTORS Work Instruction
PASSANGER IMS Manual
VEHICLE LTD Production Planning and Control
Page 1 OF 1

Subject SOP PPC- PBS ( Barcode printing station ) Issue no 1


Position: Handling Bank1 & Bank2 Shift: A/B/C Revision 08-07-2024

Sr.No Activity Ref. Remarks


PPE Matrix/
1 Use PPE & Follow Safety Instructions,Maintain 5'S" SHE Board/Tool
Box Talk
Coming from
2 Line-up by co-ordinating wth DPT person
a Lifting
Cab Checking every time - ( Weld number, Colour, Model , Whether the cab sits
properly on the hanger or not,Barcode checkss on cabs )

Coming from
3
a Lifting
↑ Cab condition ↑ Barcode & BIW number

↑ Checking cab
Cab Checking every time on Barcode printing station- ( Weld number, Colour,
Model )

Coming from
4
a Lifting

If there is no space in Bank 2, the lifting call the person on the line and asks him to Coming from
5
place the cab in bank 1 a Lifting
PBS - Bank 1,
6 Immediately inform incharge & Maintenance team aafter conveyor break-down Bank 2, Lifting
line
7 Immediately inform incharge aafter PC hang issue ( IPMS problem )
Coming from
8 Immediately inform incharge aafter to cab Not reste, Damage cab
a Lifting

9 At the end of the shift, inform the next shift person with the necessary information

Referance Prepared By Review & Issue Approved by


ISO
ISO
IATF16949 18001
14001

7.1.3.1
8.1.1
8.4.2.1 - - Manoj.M.Kulkarni
8.5.4.1
TATA MOTORS Work Instruction
PASSANGER IMS Manual
VEHICLE LTD Production Planning and Control
Page 1 OF 1

Subject SOP PPC- SEALANT Issue no 1


Position: Handling all cabs Shift: A/B/C Revision 08-07-2024

Sr.No Activity Ref. Remarks


PPE Matrix/
1 Use PPE & Follow Safety Instructions,Maintain 5'S" SHE Board/Tool
Box Talk
2 Cab book - line 1 & line 2
3 Book BIW cab by taking BIW number

4 If BIW not created - Immediately Reports to IPMS


Continue Book BIW cab ↓

6 Immediately inform incharge aafter PC hang issue ( IPMS problem )


If by miskate one cab is not booked, the information of that cab is taken from PBS and Book
7
immediately

8 At the end of the shift, inform the next shift person with the necessary information

Referance Prepared By Review & Issue Controlled by Approved by


ISO
ISO
IATF16949 18001
14001

7.1.3.1
8.1.1
8.4.2.1 - - Manoj.M.Kulkarni
8.5.4.1
TATA MOTORS Work Instruction
PASSANGER IMS Manual
VEHICLE LTD Production Planning and Control
Page 1 OF 1
Subject SOP PPC- PBS Issue no 1
Position: WIS Shift: A/B/C Revision 08-07-2024

* Tea break / Lunch break continuer running


* Sunday Working
* No OT
* Absenteesium
* IPMS issue ( Data not received )
Min model - CNG, NOVA, NOVA EV, ALTROZ,
* ALTROZ RACER, HARRIER\SAFARI, HARRIER EV
* Maintain T60 \ T40 ( Jis parts )
* Firm Sequence

Referance Prepared By Review & Issue Approved by


ISO
ISO
IATF16949 18001
14001

7.1.3.1
8.1.1
8.4.2.1 - - M M.Kulkarni
8.5.4.1