Wall Footing Details: Pedestal Schedule
Wall Footing Details: Pedestal Schedule
Wall Footing Details: Pedestal Schedule
30
400mm x 200mm THK WALL FOOTING
W/ 3-10mmø MAIN BARS W/ 10mmø
SPACED @ 300mm O.C.
0.40
0.20
0.15
2100 2100
800 500 800 1500 800 500 800
5" THK CONCRETE HOLLOW BLOCKS
800
800
W/ 3 SETS OF 10mmø TIES W/ 3 SETS OF 10mmø TIES
2100
2100
1450
500
500
SPACED @ 2-50; 4-100;
REST 150mm
800
800
16-20MMø o.c. B.W.
1.20
0.20
20mm THK BASE PLATE W/ 20mm THK BASE PLATE W/
6-20mmø x750mm ANCHOR 6-20mmø x750mm ANCHOR
BOLTS, NUTS & WASHERS BOLTS, NUTS & WASHERS
1300
1300
BLOCKS
150
150
150
NTS NGL NGL NGL
S3
3 SETS OF 10mmø TIES 3 SETS OF 10mmø TIES 3 SETS OF 10mmø TIES
SPACED @ 2-50; 4-100; SPACED @ 2-50; 4-100; SPACED @ 2-50; 4-100;
REST 150mm REST 150mm REST 150mm
PEDESTAL SCHEDULE
1100
1100
1100
FTB-1 FTB-1
FTB-1
1500
12-20mmø VERTICAL REBARS 12-20mmø VERTICAL REBARS 12-20mmø VERTICAL REBARS
1500
1500
P1 P2 P3
16-20mø REBARS O.C. B.W. 16-20mø REBARS O.C. B.W. 16-20mø REBARS O.C. B.W.
500 500
1926
400
400
400
500
1500 7224
2100
SECTION SECTION
SIZE: 500x500 SIZE: 400x400 SIZE: 500x500 (P1) (P2)
V BARS 16-20mmø V BARS 12-20mmø V BARS 16-20mmø
FOOTING TO
FOOTING TO FOOTING TO
WAREHOUSE FINISH
WAREHOUSE WAREHOUSE FLOOR
ENGINEER PROJECT TITLE PROJECT OWNER/COMPANY SHEET CONTENTS CADD BY: CORPUZ, JV E. SHEET NO.
AS SHOWN RWADF
CONSTRUCTED WAREHOUSE DATE:
S-3
PRC: PTR: AS-BUILT PLAN DATE:
TIN: DATE: CHECKED BY:
PLACE: LOCATION: LOT 4C, TIPO PLAZA AREA, NEAR SENTRY GATE, TIPO ROAD, SBFZ