2023 Projects Status 21st-Feb-2024
2023 Projects Status 21st-Feb-2024
2023 Projects Status 21st-Feb-2024
a) Latest Revisions
4 Setpoints required for the switches and ranges for the transmitters.
320 50
272 70
280 200
385 150
190 200
350 350
2603 1110
Remarks
Termination drawings submitted
Containment Pending
AVFM documents pending
IR for Gas detectors, Bulk MTO and Cable
routing plan Pending
3 NPP0085 In process
PPGL In process
11
15
QAFCO CCC HVAC In Process
PROJECT
s Reports for ongoing projects
Pending tasks Remarks
IR for Gas detectors CRS from ESS received and reshared with remarks
dated: 30/10/23, Quote finalized waiting for PM
advise.
IR for pressure guages Quote finalized, IR on Hold as per advised by PM.
IR for Cables and glands Glands quotes to be finalize.
IR for Bulk MTO/MANpower RFQ for manpower services sent.
OTF MAS As per PM approval, Ordering of Overall project
CUP DPS part number with cables in process,
datasheet to share with PM for
confirmation by today(21/2/24),
Termination drawings received
need to start working on Cable
schedules.
1 Feburary
1 Feburary
2 RFQs 15 Feburary
3 Import Request 15 March
4 Process Hook-up Drawings 20 March
5 Cable Schedule 25 April
6 Cable Block Diagram 20 April
7 Cable Routing Plan (markup) 20 April
8 Method Statement 15 May
9 Power Consumption List 0
10 Termination Schedule 20 May
11 MTO/ Manpower Services 15 May
12 O&M Manuals 10 May
High Priority
In Hand Task:
RFQs Working
an Project
Status Remarks
In process
In process Initial Quotes Received
Open
Open
Open
Open
Open
Open
Open
Open
Hold
Q22-04-002 Doha No
Scope: Supply and installation of field instruments & cables with accessories
Overall Status: HOLD (August) ;
Status: Deliverables issued, MAS Approved, ordering of some instruments on HOLD by PMT.
Latest CRS for GAS detectors from ESS received Dated: 25/09/23, Gas Detectors MAS APPROVED with comm
MAS for Instruments has been APPROVED,
2 15
3 Instrument List 10
4 Instrument Location Layout 10
5 RFQs 15
a) Siemens
b) Xylem
c) E&H
General (Petrosolutions)
d)
e) VEGA (RLT)
f) Honeywell (Gas detectors)
g) Bulk MTO
6 Import Request 10
a) Siemens
b) Xylem
c) E&H
d) General (Petrosolutions)
e) VEGA
f) Cable
f) Honeywell detectors
7 Process Hook-up Drawings 22 15
Cable Schedule
8 20
9 Cable Block Diagram 20
10 Cable Routing Plan (markup) 30
11 Method Statement 20
13 Termination Schedule 20
14 MTO/ Manpower Services 12
15 O&M Manuals 15
High Priority
In Hand Task:
Q22-04-002 Doha North Project
PMT.
APPROVED with comments dated:25/05/23, MAS Rev-2 resubmitted Dated 14/06/23 in order to get code A.
Submitted
Feburary
Submitted
Open 10/7/2023
Feburary Closed
Closed
Closed
Closed
Closed
Closed
Closed
In Process 21/07/23
Feburary HOLD 31/07/23
Closed
Closed
Closed
HOLD 24/07/23
Closed
Closed
HOLD 27/07/23
Feburary Submitted
Feburary Submitted
Feburary Submitted
Feburary Submitted
March Submitted
April Open 31/08/23
March HOLD 27/07/23
March Submitted
itted Dated 14/06/23 in order to get code A.
Remarks
MAS approval received from PM
Quote received
Quote received
Quote received
Quote received
Quote received
Waiting for Final discounted offer from vendor
Completed, to be submitted.
As per advised by PM
IR has been raised, PO generated.
IR has been raised, PO generated.
IR has been raised, PO generated.
As per advised by PM
IR has been raised, PO generated.
IR has been raised.
As per PM Advised.
Submitted Dated: 16/03/23
RFQ sent
Q21-08-00
Scope: Supply & Installation of field instruments, cables and accessories
Overall Status: HOLD (september);
Status: Updated CS, CBD and Inst. List of underpass and Attenuation Tank and MIA un
attenuation tank is pending.
Project Manager: Syed Ayyaz
Sr No. Deliverables Schedule (hrs)
IR
(Attenuation Tank) Attenuation Tank:
Level Switches (Flygt)
FITs (Pulsar)
DULT (Siemens)
ULT (Siemens)
HLTs (Siemens)
PITs (Siemens)
16 TT (Siemens)
17 IR Cables 20
18 Developing a count discrepency report
High Priority
InHand Task:
Q21-08-009 Doha Corniche Project
ies
pass and Attenuation Tank and MIA underpass have been submitted. Selection of Suitable Ins
March
Status Remarks
Submitted
Submitted
Submitted Submitted
Submitted Submitted
Selection for flow meter pending from client.
Submitted AVFM Hookup submitted dated: 19/04/23
In Process Termination List preparation
Closed
Closed
Closed
Closed
Overall Status: HOLD; Worked on CRS and Segregated the HOOKups areawise. Contai
Project Manager: Syed Ayyaz
Schedule
Sr No. Deliverables (hrs) From To
2
3 RFQs
4 Import Request
a) Siemens
b) Flyget
C) TEMA
d) OMCH
e) Cables
f) Man Power Service Installation Contractor
5 Process Hook-up Drawings
6 Cable Schedule
7 Cable Block Diagram
8 20 Feburary
Containment Drawings
9 30 Feburary
10 Method Statement
11 Termination Schedule 20 March
12 O&M Manual
High Priority
Q21-08-002 QDSBG Projec t
ssories
Submitted
Submitted
Installation
Contractor
Scope
In-Progress
Closed
Closed
Closed
Closed
Closed
Closed
N/A
Closed
Submitted
Submitted
Submitted
Installation
Contractor
Scope
Feburary On-Hold
Installation
Contractor
Scope
Feburary On-Hold
Submitted
Module Wiring Drawing Required From Control Team Open
Submitted
Remarks
MAS received from the subcontractor and reviewed by Instrumentation team, queries to
be discussed with subcontractor related to BOQ, Scope of work and compliance.
Installation Contractor finalized on 14-12-2022 Al-Amrit Trading (JOULES)
Installation subcontractor will mark the route on the instrument location layouts shared
to finalize the containment BOQ.
1 Material submittals 30
RFQs
a). Flowmeter DN300 -
b). Pressure Switch -
c). Pressure Transmitter -
d). Hydrostatic Level transmitter -
e). Radar type level transmitter -
f). Room Temp Sensor -
g). Rain Sensor
2 IR 40
a). Flowmeter DN300 -
b). Pressure Switch -
c). Pressure Transmitter -
d). Hydrostatic Level transmitter -
e). Radar type level transmitter -
3 Import Request 20
a). IR Instruments -
4 Process Hook-up Drawings 10
5 Method Statement 10
6 O&M Manuals 10
6 CBD 15
In Hand Task:
Method Statement
O&M Manual
Waab City Project
To Status Remarks
Instrumentation related data for MAS has already been
submitted to Controls team for updation.
RECEIVED P&IDs with markup for flowmeter Dated: 27/09/23.
Queries shared, Waiting for client clarifications and kickoff
Submitted meeting
In Process
Closed
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
Closed Final Quotes received, waiting for MAS approval
In Process Not Finalized Yet, manufacturer may need to be changed.
In Process
Submitted Ordering Done.
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Submitted
Q23-07-005 Parks and Road
Scope: Supply and Installation of Pressure transmitters and Cables.
Overall Status: HOLD
Status: MAS Submitted, But Changes required.
Project Manager: Muhammad Bilal Anwar
Sr No. Deliverables Schedule (Hours) Information Required From
1 Material submittals 15
2 RFQs 10
a). Pressure Transmitters -
b). Cables -
c). Bulk Material -
3 Import request 5
a). Pressure Transmitters -
b). Cables -
c). Bulk Material -
4 Process Hook-up Drawings 10
5 Method Statement 5
6 O&M Manuals 5
In Hand Task:
5 Parks and Roads
To Status Remarks
In Process Instrumentation & Cables data already shared with controls team.
In Process
In Process Quote received for PT
In Process Cables quantity is low, vendor denied to share quote.
Open
Open
Open
Open
Open
Open
Open
Open
Q23-11-003 Al-Ebb & Leabaib Pro
Scope: Supply of field instruments, No Installation and No Cables under Scope.
Overall Status: HOLD
Status: MAS to be resubmitted dated: 31/01/24 after updation of Level logger OEM. CBD with updated drawing n
Project Manager: Muhammad Bilal Anwar
Sr No. Deliverables Schedule (Hours) Information Required From
1 Material submittals 40
RFQs 20
a). Level Switch (Float Type) -
Level Element (LE)/ Level
Indicator Transmitter (LIT)
(Ultrasonic
b). Type) -
c). Level Data Logger -
d). Proximity Switch -
2 IR 15
a). Level Switch (Float Type) -
Level Element (LE)/ Level
Indicator Transmitter (LIT)
(Ultrasonic
b). Type) -
c). Level Data Logger -
d). Proximity Switch -
3 Process Hook-up Drawings 15
4 Method Statement 10
5 O&M Manuals 10
6 CBD 10
In Hand Task:
Design documents preparation
after MAS approval
bb & Leabaib Project
To Status Remarks
MAS to be resubmitted dated: 31/01/24 after updation of Level
logger OEM.
Instrumentation related data for MAS has already been
submitted to Controls team on 28 Dec,2023 for updation in
Submitted MAS.
Queries shared, Responses received from PM on 26 Dec,2023.
In Process
In Process Quote received, waiting for MAS approval
In Process
Quote received, waiting for MAS approval
In Process Manufacturer will be changed, RFQ to be shared
In Process Quote received, waiting for MAS approval
Open Waiting for MAS approval to initiate ordering
Open
Open
Open
Open
Open
Open
Open
Submitted with updated drawing numbers submitted dated 13/02/24
Pumping stations SWS
Scope: Supply and installation supervision of field instruments.
Overall Status: Closed
Status: Revised MOS submitted for H2S and Conductivity analyzers, Updated shared.
Project Manager: Muhammad Bilal
Sr No. Deliverables Schedule (Hours) Information Required From
1 Material submittals
June
2 RFQs 20 August
Siemens August
Xylem August
Omron
August
3 E&H 15 August
ASHCROFT August
IR's
Siemens
Xylem
Omron
E&H
ASHCROFT
4
15 september
5
Method Statement
50 september
6
O&M Manuals
10 september
High Priority
In Hand Task:
Method Statement
O&M Manual
stations SWS
To Status Remarks
MAS for proximity remaining.
Previously, MAS for all Instruments was approved.
In process
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed Tender specs. Are not complying by Approved vendors
Closed
Closed
Hookups to be revise and submit dated 15/02/24 as per clinet
comments.
Revised Hookups as per clinet format submitted dated:
20/11/23
submitted Revised Hookups and MOS as per latest comments will be
submitted only H2S detectors and Level switches remaining.
Open
Q23-04-002 MTC NPP00085 PROJECT
Scope: Supply and installation of field instruments & cables with accessories
Overall Status: In process;
Status: As per PM approval, Ordering of Overall project cables in process, CUP DPS part number with datasheet to
for confirmation by today(21/2/24), Termination drawings received need to start working on Cable schedules.
Project Manager: Syed Ayyaz
Sr No. Deliverables Schedule (hrs) From To Status
1 Material submittal for OTF 40 In Process
2 Material submittal for Cup 10 submitted
3 Instrument List 10 Open
4 Instrument Location Layout 10 Open
5 RFQs 35 Open
a) E&H Open
b) Itech / TEMA 21/2/24 In Process
c) Cables and Glands CUP 19/2/24 In Process
Cables and Glands OTF In Process
6 Import Request 10 Open
a) E&H Open
b) Itech / TEMA Open
In Hand Tasks
Cable schedules
termination schedules
OTF MAS
mber with datasheet to share with PM
n Cable schedules.
Remarks
a) Additional instruments
(Flow meter, Chlorine and pH
analyzers, pressure guages,
pressure switch)
2 RFQs 20 Feburary
PT, RLT, FLS ,CLS, PS Feburary
Analyzers (Conductivity,
Turbidity, pH/ORP, DO) Feburary
Additional instruments (PGs,
PS, FM, Chlorine/pH analyzer)
3 Import Request 15 March
PT, RLT, FLS ,CLS, PS Feburary
Analyzers (Conductivity,
Turbidity, pH/ORP, DO) Feburary
Additional instruments (PGs,
PS, FM, Chlorine/pH analyzer)
Additional instruments of
Chlorinartion area (FM, PIT,
PI, LS, LIT)
4
Process Hook-up Drawings
20 March
5
Method Statement
10 April
6
O&M Manuals
10 April
High Priority
In Hand Task:
goon Project
Sales Handover Documents received on 01-11-2022
To Status Remarks
MAS rev-5 Submitted dated: 26/01/24
Submitted
Closed
Closed
Closed
Closed
RFQ sent, waiting for final discounted quotes.
Closed
Closed Raised on 07/03/23, PO generated on 08/03/23
Closed
Raised on 13/04/23
IR for FLS Raised, for PGs, FMs and Chlorine analyzers waiting for
Closed
discounted offers
1 ATG 45
2 Technical Clarifications -
Technical Review and Vendor
a). Coordination -
Material Submittal/BOM
b). IR Issuance -
Hookups
ITP
2 F&G 45
a). Technical Clarifications -
Technical Review and Vendor
b). Coordination -
Material Submittal/BOM
c). IR Issuance -
Hookups
ITP
3 TLAS 45
a). Technical Clarifications -
Technical Review and Vendor
b). Coordination -
Material Submittal/BOM
c). IR Issuance -
Hookups
ITP
4 Field Instruments 45
a). Technical Clarifications -
Technical Review and Vendor
b). Coordination -
Material Submittal/BOM
c). IR Issuance -
Hookups 19/2/23
User Manuals
In Hand Task:
Hookups for ATG TLAS and F&G
1 PPGL LPG Project
ld instruments in process.
To Status Remarks
Closed
Closed
Closed
Closed
In Process Drawing for Temp transmitter and Level transmitter need to be
submitted dated: 31/01/24
Submitted
Closed
Closed
Closed
Closed
Open
Submitted
Closed
Closed
Closed
Closed
Open
Submitted
Closed
Closed
Closed
Closed
In Process
Submitted
Q23-12-004, MEP UPGRADE PACKA
Scope: Supply of field instruments, No Installation and No Cables under Scope.
Overall Status: In process
Status: Ordering Goahead from PM for Field Instruments received dated 12/02/24, MAS to be resubmit with prev
Project Manager: Syed Ayyaz
Sr No. Deliverables Schedule (Hours) Information Required From
RFQs 19/2/24
To Status Remarks
MAS to be resubmit with previous approvals for code - A
In process
In process
In process
In process
In process
In process
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Q24-01-003, QAFCO CCC HVAC pro
Scope: Supply and installation of field instruments and cables
Overall Status: In process
Status: Material submittals for Field instruments to be submitted dated:21/2/24, for Cables to be subitted dated:2
Project Manager: Bilal anwar
Sr No. Deliverables Schedule (Hours) Information Required From
2 RFQs 10 20/2/23
3 IR 10
4 Cables schedules 45
5 Cable/containment layouts 50
6 cable layout installation details 30
7 Process Hook-up Drawings 25
In Hand Task:
CO CCC HVAC project
To Status Remarks
Material submittals for Field instruments to be submitted
In process dated:21/2/24, for Cables to be subitted dated:23/2/24
In process
Open
Open
Open
Open
Open
KSAB - SCADA System f
Scope: Design, Supply, Installation of field Instrumentation & Cables
Overall Status: In process
Project Manager: Mazhar Manzoor
Sr No. Deliverables Schedule (Hours)
20
c). Magnetic Flow meters
20
Interconnection Cables between field
d).
instruments & RTU's
6 MTO 22
8 Method Statement 15
In Hand Task:
1 Cable Schedule prepartion is in progress and will be shared with Mr. Mazhar on 23-02-2024 as committed.
2 Bulk Documents site wise segeration as per requirement.
3 Equipments marking on Layout & meeting is scheduled with BSSJV on date 21-02-2024. Primary cable routing primi
4 Vendor coordination for documents related to Instruments and cables.
KSAB - SCADA System for Dirab Project
ables
Remarks