Quizzes - 6 Sigma
Quizzes - 6 Sigma
Quizzes - 6 Sigma
3- The function of a coach in a Six Sigma organization is most likely to be lled by which of
the following:
I. Steering committee members
I. Process owners
Ill. Master black belts
IV. Black belts
• Ill and IV only
O ll and Ill only
O land Il only
O Ill,Ill and IV
4- For an automobile manufacturer, the average amount of labor hours needed to produce
each vehicle in an assembly plant is a:
I I
I. Business level KPOV I. Operation level KPOV
Ill. Business Level KPIV IV. Process level KPOV
A
V. Operation level KPIV VI. Process level KPIV
Data
alysis
ITU
11,111
O IVand V
O VI
O land Il
O ll and Ill
1-A critical to quality (CTQ) tree can be of value to the Six Sigma
project team. It can translate customer requirements to
quanti ed requirements. This will allow the organization to focus
on a problem. An example of a quanti ed requirement for a fast
food restaurant is;
O Inexpensive price for the food 3
O The price of a hamburger should be less than $3
© Average waiting time for an order
O The taste of food should be rated high
six sigma
2- What can be said about Kano Model?
I. Lack of Attractive characteristics results in customer dissatisfaction.
X
I. Increasing the performance of Must Have characteristics results in higher
customer satisfaction.
Ill. Improving Satis ers may lead to customer satisfaction.
O Ill. only
O I. and Ill. onlv
- [ ] O I. only
O I. Il. and Ill.
Quiz 3
1- Identify the distribution that has a mean equal to the standard deviation
O Poisson
O Chi-Square
O Exponential
O Weibull
O Exponential
O Log-normal
3- ABC Company gathered data on the number of specs of dust on 12 recently developed negatives.
The 12 data points are listed below.
1-3-0-2-1-2
2-0-0-4-1-2
The median of the data will be:
O1.5
O2
О 9.5
O0
4-The diameter of a population of ball bearings is normally distributed with a mean of 75 and a
standard deviation of
8. What is the probability of the average diameter of 10 randomly selected ball bearings being greater
than 77?
O 0.2146
O 0.3751
O 0.4013
O 0.0210
2 and 3
III. Skewness >O
O lIor ll
O lor Ill
O ll or Ill Is Ill
O I only
6-descriptive statistics output on a group of blood pressure data, what is the 95% con dence interval
for the blood pressure standard deviation?
O [9.615 12.878]
O [72.870 121.192]
O [68 74]
O {70.59 75.149]
Quiz 4
70
1- Based on the following PERT diagram, if we want to
3173
shorten the project by one month, then we should:
9 3 70
exhaustive list of ideas about a subject?
O A nity diagram
O Benchmarking
O Brainstorming 2critical
O Fishbone diagram paths
3-The slack time along a critical path:
O Is the di erence between the earliest and latest starting time
O Is equal to zero
O Is equal to the "crash" time
O Is the highest risk area
4-How many of the following items should be known at the end of de ne phase?
I. The key process(es) involved in the project
II. The importance of the project
III. The goal of the project
IV. The scope of the project
all ofthem
O I, II and III
O I,II , III and IV
O I,Ill and IV
O II, III and IV
5-"Forming, Storming, Norming, and Performing. " are terms that describe:
O Root cause identi cation and corrective action
O Process variation reduction and improvement phases
O Stages of team growth
O Steps of the brainstorming process
6- In the house of quality (HOQ), a weak or empty row indicates:
O Customer competitive assessment is not done.
O An engineering design attribute is missing.
O A customer need is not taken care of adequately in current design.
O Relationship matrix is not done properly.
Quiz 5
1-
A system that delivers products or services at the correct time and in correct quantity is referred to
as:
O Kaizen
O One piece ow
O Just in time
O Takt time
3-
Customer satisfaction data is often accumulated using some form of Likert scale (1-5,1-7, etc). What
measurement scale is being used?
• Nominal
• Interval
• Ratio
• Ordinal
4- which one of the following are key elements of a pull based production system?
I value stream map
II Kansan
III Takt
IV supermarket mechanism
II and III
II and IV
5-If in a process data box of a value stream map, the C/T is moderate and C/O is very low, we would
expect:
• Scrap rate will be moderate
• EPE will be low
• EPE will be high
• Lead time will be high
6-Which of the following methods cannot be used to reduce the work in process inventory (WIP)?
• Standard Work
• One Piece Flow
• Super Market Shelf Mechanism
• Set Up Time Reduction