Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

123

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

NORTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED

From To
Assistant Engineer, Sub Inspector of Police,
Operation::Kannaigudem PS :: Kannaigudem

Lr No AE/Operation/Kannaigudem F.No. /24, D.No.95/24, Date: 09.10.2024

SUB: Power supply position on 01.03.2024 to the Gangudem Village which comes under the
11kv Thupakulagudem feeder which is emanating from 33/11kv kannaigudem SS of
Kannaigudem Section.

Reference: C.No.07/CR/SI-KGM/2024

In the subject cited above, Power supply position on 01.03.2024 to the Gangudem
Village which comes under the 11kv Thupakulagudem feeder which is emanating from
33/11kv kannaigudem SS of Kannaigudem Section.

The 11kv Thupakulagudem feeder power supply position of Interruptions &


breakdowns on 01.03.2024 is as mentioned below,

1. 11kv Thupakulagudem tripped with indication of EL (line to ground) fault at


1.10hrs.
2. Line clear (LC) from 20.10hrs to 20.33hrs.

As mentioned above are the interruption occurred to Gangudem village and there are
no breakdowns occurred on 01.03.2024 of 11kv Thupakulagudem feeder.

Assistant Engineer Elec.,


Operation::Kannaigudem

You might also like