Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PinkyPatel (13y 0m)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

PINKY PATEL

Correspondance Address:
Assistant Manager, Project Planning & Management
Kotputli Cement Works (A unit of UltraTech Cement Limited),
Jaipur, Rajasthan Pin- 303108 (Phone: +91 7230010135/ +91 8821876372)
Email: pinkypatel.patel5@gmail.com

ELECTRICAL ENGINEER HAVING 12.7 YEARS OF EXPERIENCE


OBJECTIVE
To excel as an Engineering professional with a growth oriented and reputed organization that utilizes
my expertise to the optimum possible and provides opportunities to achieve both personal and
professional goals.

PROFILE SUMMARY
 Assistant Manager, Project Management at Kotputli Cement Works (Brown field Project) since
06.01.2023 to till date
 Assistant Manager, Project Management at Pali Cement Works (Green Filed Project) since 20.11.2021 to
03.01.2023, successfully plant commissioning done.
 Senior Engineer in Technical Services department at Sidhi Cement Works (UltraTech Cement Ltd) since
30.08.2019 to 16.11.2020 (2 Years).
 Started as GET to grown upto Engineer in Previously worked unit Rawan Cement Works (UltraTech Cement
Ltd) – Completed Brown field Project (as an Electrical Engineer), Looked Electrical Maintenance & Technical
Services since 01.08.2011 to 27.08.2019 (8 Years).

CORE COMPETENCIES
Project Planning & Management (Primavera P6)  Electrical Erection and Commissioning 
Electrical Maintenance  Energy Conservation  Energy Audits  MID Activities (Vibration
measurement, thermography & alignment)  Maintenance Management  SAP Management
 Operation excellence (WCM)

PROFESSIONAL EXPERIENCE & DEVELOPMENT

Kotputli Cement Works – Brown Field Project (UltraTech Cement Limited - From 06.01.2023 to
till)
KEY JOBS EXECUTING:
Successfully pyro commissioning done in 15 months.
→ Project initiation, planning, execution & tracking (Micro planning of Civil, Mech., E&I, Process activity with
successor & predecessor in Primavera)
→ Drawing Management - monitoring All function related drawings availability with HO as well as Suppliers
→ Resource Management - Equipments Delivery tracing & Monitoring with suppliers, other resources like
lifting/shifting etc. monitoring
→ Day basis setting realistic deadlines same to communicate them consistently to teams
→ Supporting Project execution teams of cross functional related, timely risk/delay awareness etc.
→ Various MIS & Dashboard preparation for Project progress & Highlights
→ Equipments readiness tracking along with supplier’s erection & operational deputed personals (All functions)
→ Team Management & development

Pali Cement Works – Green Filed Project (UltraTech Cement Limited -From 27.11.2021 to
02.01.2023)
KEY JOBS EXECUTED:
Successfully commission Pre-Clinker on 30th Nov’22 (Feed by 4th Dec’22) & Post-Clinker on
12th Dec’22
→ Define project’s scope, determining availability of resources, strategic Planning & Analysis
→ Project Scheduling – All function’s & Day to Day monitoring Planning Vs Achieved
→ Day basis setting realistic deadlines same to communicate them consistently to teams
→ Supporting Project execution teams
→ MIS & Dashboard preparation for Project Highlights

Sidhi Cement Works (UltraTech Cement Limited - From 30.11.2019 to 23.11.2021)


KEY JOBS EXECUTED:
→ Planning & monitoring of Shutdown activity through SDM software.
→ MID Activities (Vibration, Alignment, Thermography, UT & MPT).
→ Energy Monitoring & Job execution
→ Conductions & Participation in Process studies & Energy Audits
→ SAP PM Power User (PM Compliance & Various reports preparation)
→ MIS Preparation related to business level & unit level
Additional Job:
→ UTCL level Shutdown task force details preparation for time reduction with action plan
→ UTCL level Reliability improvement taskforce details preparation with action plan

Rawan Cement Works Brown filed Project & Operation (UltraTech Cement Limited - From
01.08.2011 to 26.08.2019)
KEY JOBS EXECUTED:

→ Electrical Equipment’s Operation & Maintenance


→ Executed Electrical equipment’s Erection & commissioning of 10,000 TPD close circulating project (132KV Switch
Yard, HT-LT Pannel of Smart MCC), CEIG (Govt.) Approval for All HT Equipment’s
→ Executed Shutdown Planning & Execution in MS-Project & SDM software linked with SAP
→ Worked in technical services – PM Management, Energy Cell & Inspection cell
→ Process optimization - False air & bag filter study
→ WCM (GRT, KFA, Area Ownership, BCE, Maintenance Audit & External Audits i.e. IMS, Awards & ISO)

PROJECTS COMPLETED (At Rawan Cement Works)

 132 KV Interconnection Lines between Rawan to Hirmi (Grid Surrender at Hirmi).


 Specific power consumption reduction of RWCW Unit-2 to <50 KWh/MT of Clinker (Various Encon Projects done)
 Specific power reduction from 21 kWh/MT of Material to 17.5 kWh/MT of Material in Line-1 Raw Mill
 Conversion of all old ESPs (Line-1 Raw Mill, Coal Mill & Cement Mill) to Baghouse
 Major fans (12 nos.) inlet damper removal job on account of high pressure drop study with team
 VFDs Capex for Bag filters proposed (total 65 nos.) & Phase-I (35 nos.) installed, commissioned & Optimized
 Major fans saving optimization after inlet box modification.
 Re-prism Ultra project selected in Rawan top 3 (Water conservation through 4R approach).

PROFESSIONAL ACHIEVEMENTS

 Integrated Management System” External Certified training by QJS (ISO 9001:2015, ISO 14001:2015, OHSAS
18001:2007 and SA 8000:2014).
 Internal BCE Auditor.
 CII 18th National Award for Excellence in Energy Management 2017.
 Prepared Best Practices and Initiatives taken for Energy Conservation.
 Participation in ABG Reprism-2017.
 Qualified & presented Reprism 2019 for Regional Round (Bhuvneshwar).

INTERNSHIPS (During Diploma)


▪ Six One month industrial training at C.S.P.D.C.L. Supela Sub-station Chawani.

EDUCATIONAL & PROFESSIONAL CREDENTIALS


AMIE (Electrical Engineering) - (Batch: Summer 2013- Winter 2014)
Secured 63 %; From Institution of Engineers (India) Kolkata
Diploma (Electrical Engineering) - (Batch: 2008- 2011)
Secured 75.5 %; From Govt. Polytechnic Durg (C.G.)
Intermediate (PCM) in Year - 2008
Secured 69 %; School – Shram Niketan Higher Secondary School, Bhilai, CG Board
Matriculation in Year - 2006
Secured 82.3 %; School - Shram Niketan High School, Bhilai, CG Board
COMPUTER PROFICIENCY

 P6 (Primavera), MS Project & Shutdown Management System


 SAP (PM Module) – Power User
 7QC tools (Fish bone, Pareto etc.)
 TM-1, KAROMI, Confluence, Qualisof & ICSI
 Operating Systems: Latest version of Windows
 Software’s: MS-Office (Word, Excel, PPT), Outlook mail and other important tools.

SKILLS/ABILITIES

 Conceptual Skills: Ability to use information to solve business problems, recognizing problem areas &
implementing solutions, selecting critical information, understanding organization's business model.
 Communication Skills: Ability to transform ideas into words / actions, credibility among colleagues, peers, and
subordinates, presentation skills and spoken format, presentation skills; written / graphic formats.
 Interpersonal Skills: Mentoring skills, diversity skills, working with diverse people and culture, networking
within the organization, networking outside the organization, working in teams, cooperation and commitment.

PERSONAL INFORMATION
Date of Birth : 1st July 1991
Marital Status : Un-Married
Languages Known : English, Hindi

Date: 11-03-2024

Place: Kotputli Cement Works, Rajasthan, India (Pinky Patel)

You might also like