Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Chainage: Section A-A Proposed HDD Profile

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

19

00 KEY PLAN
0
5 6
2 3 4 7 13
8 9
10 11 12

LEGEND:

PROPOSED 220 kV ONSHORE CABLE ROUTE

PROPOSED HDD HORIZONTAL ALIGNMENT

10

20
00
PROPOSED TEMPORARY HORIZONTAL
DIRECTIONAL DRILL (HDD) WORKING AREA/
STAGING AREA

PROPOSED TEMPORARY ACCESS TRACK

PROPOSED TEMPORARY CONSTRUCTION


COMPOUND

APPLICATION BOUNDARY
18
90
0 LANDOWNER PROPERTY BOUNDARY

PROPOSED JOINT BAY

PROPOSED C2 CHAMBER

PRPOSED LINK BOX

PROPOSED TRANSITION CHAMBER

EXISTING GROUND PROFILE

PROPOSED HDD
PROPOSED
LONGITUNDINAL ALIGNMENT
DRILL STAGING
AREA 80 m EXISITING HIGH VOLTAGE
OVERHEAD LINE

EXISTING MEDIUM VOLTAGE


OVERHEAD LINE

EXISTING LOW VOLTAGE


18 OVERHEAD LINE
80
0
EXISTING MEDIUM VOLTAGE
UNDERGROUND CABLE

PROPOSED EXISTING LOW VOLTAGE


UNDERGROUND CABLE
TRANSITION
CHAMBER
EXISTING WATER MAIN

EXISTING GRAVITY SEWER

EXISTING HIGH PRESSURE TRANSMISSION


PROPOSED HDD
00 GAS PIPELINE
A-A ENTRY /
10
EXIT
EXISTING TELECOMS OVERHEAD LINE

20 EXISTING TELECOMS UNDERGROUND CABLE

NOTES :
30
1. FOR PLANNING PURPOSES ONLY, NOT FOR CONSTRUCTION

40 T
SAL ERSTOWN 2. ALL DIMENSIONS IN METERS, UNLESS OTHERWISE NOTED
18
70
0 RIVER 3. THE CABLE SHALL BE INSTALLED WITHIN THE
SITE BOUNDARY. THE FINAL ALIGNMENT WITHIN THE
50 SITE BOUNDARY SHALL BE DETERMINED FOLLOWING DETAILED
DESIGN, WHICH WOULD PROCEED POST-PLANNING.

6 4. THE SITE BOUNDARY IS THE EXTENT OF THE


0
PROPOSED PROJECT SITE. IT SHOULD BE ASSUMED TO EXTEND
TO THE EDGE OF THE CARRIAGEWAY ALONG PUBLIC ROADS,
EXCEPT WHERE OTHERWISE INDICATED.
70
5. 220 kV CABLES TO BE INSTALLED AS PER DRAWING
PE605-D027-083-001 (LATEST REVISION), WHICH IS A TYPICAL TRENCH
PROPOSED A-A LAYOUT. THE OVERALL DEPTH, WIDTH AND FORMATION
OF THE TRENCH MAY CHANGE, DEPENDING ON GROUND
TRANSITION CONDITIONS AND DETAILED DESIGN.
CHAMBER 6. REFER TO EIRGRID DWG OFD-SSS-524
FOR TRANSITION CHAMBER SPECIFICATIONS. TRANSITION CHAMBER TO BE
USED IF DUCT COUPLER NOT AVAILABLE FOR DUCT SIZING

7. ALL LEVELS ARE RELATIVE TO MALIN HEAD DATUM

PROPOSED HDD
003 RENAMED SALTERSTOWN ROAD TO COAST ROAD
ENTRY / EXIT
002 01/03/24 UPDATED ACCESS TRACK AS PER SPA
AD

001 27/02/24 UPDATED AS PER RPS COMMENTS NB NB RD MH


RO

000 26/01/26 FIRST ISSUE NB NB RD MH

18 REV. DATE REVISION DESCRIPTION DRN PROD VER APP


T

60
0
AS

PLAN PURPOSE OF ISSUE - PRELIMINARY UNLESS INDICATED


CO

CLIENT
APPROVAL PLANNING X TENDER CONSTRUCTION AS-BUILT
SCALE 1:1000
0m 50 m 100 m Client
ORIEL WINDFARM LTD
Tailte Éireann Licence No. EN 0023719-24 ©Tailte Éireann/
Government of Ireland Map Sheets 2014, 2073

Project

ORIEL WIND FARM PROJECT


PROPOSED HDD PROFILE
SECTION A-A Contract

SCALE 1:500

SALTERSTOWN RIVER
PROPOSED HDD
BED - 3 m CLEARANCE Drawing Title

LINE - R150 PROPOSED SALTERSTOWN RIVER HDD CROSSING


TO HDD PROPOSED HDD LINE - R150 ALIGNMENT & PROFILE AT COAST ROAD
ROAD LEVEL
ANGLE OF ENTRY/ 0

-2 ANGLE OF ENTRY/
-5

Production Unit
Civil, Environmental and Renewable Engineering
40.000
20.000

60.000
00.000

30.000

50.000

80.000

90.000
70.000
10.000

Chainage
-5.00 m

-5.00 m

-4.40 m

-3.30 m

-1.50 m
-2.3 m

-3.8 m

-4.7 m

Existing Levels

DRAWN PRODUCED VERIFIED APPROVED APPROVAL DATE

N.BELL Bell_Neil R.Doyle M.Hogan 01/03/2024

CLIENT REF No. OF SHTS SIZE SCALE

TC222676 1/1 A1 AS STATED

DRAWING NUMBER SHEET REV


COPYRIGHT C ESB
All rights reserved. No part of this work may be modified, reproduced or copied in any form or by any
means - graphic, electronic or mechanical, including photocopying, recording, taping or used for any
PE605-D027-021-001-003
purpose other than its designated purpose, without the written permission of ESB.