Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Suggested Amendment

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Classification: Public #

SCOPE OF WORK
AutoCAD Drafting & Design:
 Prepare detailed AutoCAD and industrial software drawings for salon Electrical plumbing layouts ore outside the scope of a interior designer.
and spa interior layouts, ensuring compliance with local building codes and However, the placement of electrcial components shall be marked in the
regulations. drawings. Electrical and Plumbing layout drawings need to be carried
 Create 2D and 3D picture and video renderings of floor plans, electrical out by a MEP engineer.
plans, plumbing layouts, and furniture placements tailored to the specific Suggested amendment:
functional and aesthetic needs of salons and spas. Prepare detailed AutoCAD and industrial software drawings for salon
 Develop working drawings, sections, elevations, and details as required and spa interior layouts, ensuring compliance with local building codes
for execution. and regulations.
Create 2D and 3D picture and video renderings of floor plans, and
furniture placements tailored to the specific functional and aesthetic
needs of salons and spas.
Develop working drawings, sections, elevations, and details as required
for execution.

Site Visits & Data Collection:


 Conduct site visits to measure dimensions and understand the space
Site visits can be done. However the cost related to each visit
layout, ensuring that drawings accurately reflect the real-world conditions.
(transportation charges) shall be reimbursible. Therefore please add a
 Communicate with contractors under the supervisor of the
additional clause as mentioned below.
management during site visits to capture relevant details, including load-
bearing structures, plumbing, electrical points, ventilation, and lighting
"The transportation for the site visits shall be arranged by the First party
needs.
or the second party could claim re-imbursement of the transportation
charges upon submission of receipts.

Technical Coordination:
 Collaborate with architects, engineers, and interior designers to ensure
that salon and spa layouts are practical and adhere to aesthetic and
functional specifications.
 Assist in the selection of materials, furniture, and fixtures based on
client preferences, available space, and project budget.
 The 2nd Party agrees to provide all necessary industrial guidance and
support required to ensure the successful completion of each project.

Revisions & Updates:


 Revise and update drawings as required based on client feedback, site
conditions, or changes in project scope. Since the agreement is project based and remunaration is fixed, the
 Maintain an organized file system for drawings and related documents, number of revisions should be capped to two. Any further revision
ensuring that any updates are clearly marked and communicated to relevant would be chargeble.
parties.

Compliance & Safety:


 Ensure all designs comply with local building codes, safety standards,
and accessibility requirements, especially for public spaces such as salons
As axplained above electrical and plumbing layout is out of my scope.
and spas.
The same should be prepared by a MEP engineer.
 Incorporate necessary elements like fire safety exits, disabled access
points, and safe electrical and plumbing layouts.

Project Documentation & Submission:


 Prepare complete sets of drawings and documentation required for
project approvals and construction, including permit applications, material The scope shall be limited to drawings, material list and design proposal.
lists, and design proposals. The permit application shall not be covered.
 Ensure timely submission of all drafts and revisions in line with the
project timeline.
Classification: Public #

CONFIDANTILITY
Both parties agree to maintain strict confidentiality and shall not disclose
any business plans, company details, prohibited from contacting clients or
any other related matters to any
third party.

Definition of Confidential Information:


Clearly define what constitutes confidential information, including but not
limited to business plans, strategies,
financial data, client lists, marketing strategies, and proprietary technology.
Obligation of Confidentiality:
Both parties agree to keep all confidential information strictly confidential
and shall not disclose it to any third parties
without prior written consent.

Permitted Disclosures:
Specify any exceptions where disclosure is permitted, such as when
required by law or to employees and agents on a need-to-know basis who
are also bound by confidentiality.
Use of Confidential Information:
Confidential information shall only be used for the purposes outlined in the
agreement and not for any other
unauthorized purposes.

Duration of Confidentiality:
Outline the time period during which the confidentiality obligation will
The duration of the confidentiality obligation should be limited to the
apply, which may extend beyond the
contractual period
termination of the agreement.

Return or Destruction of Confidential Information:


Upon termination of the agreement or at the request of the disclosing
party, all confidential information must be returned or destroyed.

No License or Ownership Rights:


Clarify that the sharing of confidential information does not grant any
license or ownership rights to the receiving party.

Breach of Confidentiality:
Specify the consequences of breaching the confidentiality obligations,
including potential legal remedies and damages.

Governing Law:
Indicate the governing law that will apply to any disputes related to the
Qatar laws shall be applicable
confidentiality obligations.

Acknowledgment of Understanding:
Both parties acknowledge that they understand and agree to the terms of
confidentiality set forth in the agreement.
WORKING HOURS
Availability: Be available for communication during regular working hours,
for coordination with the team and project updates. working hours need to be specified time and days
Site Visits: Site visits are expected to be conducted during standard working Any site visits outside the working hours shall be at sole descrition of
hours as agreed upon based on the project schedule. Any necessary the second party
adjustments to the timing for site visits must be communicated in advance.
Classification: Public #

Project Deadlines: Despite flexible working hours, it is crucial that deadlines


are met as per the project timeline. Delays in submissions will be reviewed
and could impact future project rates. The proposed timelines are estimated based on a project of 3500 sq. ft.
2D Design: 2 days from measuring the dimension Any project of increased sq. ft. shall require additional time.
3D Design & video: 1 Week from measuring the dimension 2D rendering: 2 Days from measuring the dimension
Final Submission: 2 Week of measuring the dimension 3D Sketch up model: 5 Days from the date of approval of 2D design
3D Video: 5 days from the date of approval of 3D sketchup model

PAYMENT
Payment of 40% will be paid in advance and remaining 60% payment will be
The rate per project shall be 1.5QR/Sq. ft.
done after every project submitted.
Payment shall be done at each stage.
Initial rate: QAR 1,500 per project
20% Advavce
After a 06-months evaluation period, your rate will increase to QAR 1,800
20% afetr 2D render approval
per project, subject to performance review and timely project completion.
40% after 3D sketch up model
Project completion defines the final output post amendment.
20% after final submission of video.
TERMINATION
The First Party reserves the right to terminate this Agreement by providing
seven (7) days' written notice to the Second Party.
The Second Party is required to complete any ongoing work before the
termination of the Agreement. The Second Party may cancel this Agreement
by providing thirty (30) days' written notice to the First Party. The contract duration need to be mentioned. The termination notice
Any confidentiality obligations that remain valid after the cancellation of this period shall be same for both parties.
Agreement must be discussed and
agreed upon by both parties to ensure clarity regarding the reasons for
cancellation.

You might also like