Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

AR JE-Farming-School 04.15.24

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

TABLE OF CONTENTS

DEPARTMENT OF PUBLIC WORKS


TRANSPORTATION AND
SHEET COMMUNICATION
SHEET CONTENTS
NO. OFFICE OF THE BUILDING OFFICIAL
PERSPECTIVE
A - 01 LOCATION MAP
VICINITY MAP
-
MAIN BUILDING FLOOR PLAN DISTRICT / CITY / MUNICIPALITY
A - 02 TOILET FLOOR PLAN
MAIN BUILDING REFLECTED CEILING PLAN
TOILET REFLECTED CEILING PLAN
LAND USE AND ZONING
MAIN BUILDING ROOF PLAN
TOILET ROOF PLAN
A - 03 MAIN BUILDING FRONT ELEVATION
TOILET FRONT ELEVATION
MAIN BUILDING LEFT ELEVATION
TOILET LEFT ELEVATION

MAIN BUILDING SECTION THRU "E"


TOILET SECTION THRU "E"
A - 04 MAIN BUILDING SECTION THRU "D"
TOILET SECTION THRU "F"
SCHEDULE OF DOORS AND WINDOWS

CONSTRUCTION NOTES LINE AND GRADE


FOUNDATION PLAN
S - 01 ROOF FRAMING PLAN
FOOTING DETAILS
BEAM AND COLUMN DETAILS
VICINITY MAP

GENERAL NOTES
LEGENDS, SYMBOLS &
EE - 1 ABBREVIATION
LOAD SCHEDULE ,
LOAD ANALYSIS
VOLTAGE DROP CALC.,
SHORT CIRCUIT CALC.
VICINITY MAP ARCHITECTURAL
SINGLE LINE DIAGRAM

POWER LAYOUT
EE - 2 LIGHTING LAYOUT
TOILET LIGHTING LAYOUT

MATERIAL SPECIFICATIONS
GENERAL NOTES, LEGENDS,
MISCELLANEOUS DETAIL, VICINITY MAP
PL - 1 SOIL WASTE AND VENT PIPING LAYOUT
COLD WATER LINE PIPING LAYOUT
SOIL WASTE AND VENT PIPING ISOMETRY
COLD WATER LINE PIPING ISOMETRY STRUCTURAL
1 PERSPECTIVE
A-01 SCALE NTS

THE SITE:
SAN QUINTIN, ALFONSO LISTA,
PLUMBING AND SANITARY
IFUGAO

ELECTRICAL

THE SITE:
SAN QUINTIN, ALFONSO LISTA,
IFUGAO
MECHANICAL

2 LOCATION MAP 3 VICINITY MAP


A-01 SCALE NTS A-01 SCALE NTS

STRUCTURAL ENGINEER OWNER: PROJECT TITLE: SHEET CONTENTS: REVISIONS DWG NO:

PERSPECTIVE DESCRIPTION DATE


PROPOSED ORGANIC FARMING LOCATION MAP
J & E FARMING SCHOOL INC. LEARNING CENTER VICINITY MAP
JOEL L. SEVILLEJA
LOCATION: A-01
REG. NO. 0071237 DATE: JANUARY 5,2024
SAN QUINTIN, ALFONSO LISTA, IFUGAO
PTR. NO. 1750689 ISSUED: SAN JUAN CITY
1 2 3 4 5
D F
A-04 A-04
24000 8000

6000 2000 4000 4000 2000 6000 1500 2504 2000 2000

A
MALE
FEMALE TOILET

2000
MALE TOILET
SHOWER
C
VITREOUS CHINA
TOILET

SANTA ROSA K-3323

AREA

3200
VITREOUS
TOILET CHINA
SANTA ROSA K-3323

A-03

3800
LECTURE LEARNING STORAGE WORKSHOP W

5000
ROOM RESOURCE ROOM WITH SINK 2 D
FEMALE 2
E

1800
SHOWER
CENTER AREA
7000 A-04
800

D W D W W
B 2 2 2 2 2
A-03
B
D W D D W W D D W D
1 1 1 1 1 2 1 1 1 1
2000

3"Ø G.I. PIPE S40


2 TOILET FLOOR PLAN
(TYPICAL TO 5) A-02 SCALE 1:75 M.

3350 3200 1650 3000 1600 900 1600 3000 1600 3200 850 1300

A
A-03
1 MAIN BUILDING FLOOR PLAN
A-02 SCALE 1:75 M.

1 2 3 4 5
D F
A-04 A-04
24000 8000

6000 2000 4000 4000 2000 6000 1500 2504 2000 2000

A
FEMALE MALE
TOILET TOILET

2000
MALE
SHOWER
AREA C
A-03

3800
LECTURE LEARNING STORAGE WORKSHOP
5000

ROOM RESOURCE ROOM WITH SINK FEMALE


E

1800
SHOWER
CENTER AREA
A-04
7000

B
A-03
B
2000

4 TOILET REFLECTED CEILING PLAN


A-02 SCALE 1:75 M.

2100 3200 1650 3000 1600 900 1600 3000 1600 3200 850 1300

A
A-03

3 MAIN BUILDING REFLECTED CEILING PLAN


A-02 SCALE 1:75 M.

STRUCTURAL ENGINEER OWNER: PROJECT TITLE: SHEET CONTENTS: REVISIONS DWG NO:

MAIN BUILDING FLOOR PLAN DESCRIPTION DATE


PROPOSED ORGANIC FARMING TOILET FLOOR PLAN
J & E FARMING SCHOOL INC. LEARNING CENTER MAIN BUILDING REFLECTED CEILING PLAN
JOEL L. SEVILLEJA
LOCATION: TOILET REFLECTED CEILING PLAN A-02
REG. NO. 0071237 DATE: JANUARY 5,2024
SAN QUINTIN, ALFONSO LISTA, IFUGAO
PTR. NO. 1750689 ISSUED: SAN JUAN CITY
1 2 3 4 5
D F
9400
26000 A-04 A-04
FIREWALL

C
A-03

5200
7000
E
A-04

B
A-03
B
RIB TYPE ROOFING
0.6 WHITE COLOR
2000

1000

POLYCARBONATE G.I. ROOFING 0.6


ROOFING WHITE COLOR
2 TOILET ROOF PLAN
A A-03 SCALE 1:75 M.

A-03

1 MAIN BUILDING ROOF PLAN


A-03 SCALE 1:75 M.

1 2 3 4 5
RIB TYPE ROOFING
0.6 WHITE COLOR
RIB TYPE ROOFING
ROOF APEX
+3.7 METER 0.6 WHITE COLOR
ROOF APEX
+3.1 METER
3700

3100
2650
2800

2546

2400
FFL 3"Ø G.I. PIPE S40
+0.1 METER (TYPICAL TO 5)
NGL FFL
+0.0 METER +0.0 METER

1 MAIN BUILDING FRONT ELEVATION 1 TOILET FRONT ELEVATION


A-03 SCALE 1:75 M. A-03 SCALE 1:75 M.

POLYCARBONATE
ROOFING RIB TYPE ROOFING
0.6 WHITE COLOR RIB TYPE ROOFING
ROOF APEX 0.6 WHITE COLOR
+3.7 METER WALL
ROOF APEX WALL
+3.1 METER
3700

3100
2995
3"Ø G.I.
2800

2600
PIPE S40 OPEN

FFL
+0.1 METER
NGL FFL
+0.0 METER +0.0 METER

1 MAIN BUILDING LEFT ELEVATION 1 TOILET LEFT ELEVATION


A-02 SCALE 1:75 M. A-03 SCALE 1:75 M.

STRUCTURAL ENGINEER OWNER: PROJECT TITLE: SHEET CONTENTS: REVISIONS DWG NO:

MAIN BUILDING ROOF PLAN DESCRIPTION DATE


PROPOSED ORGANIC FARMING TOILET ROOF PLAN
J & E FARMING SCHOOL INC. LEARNING CENTER MAIN BUILDING FRONT ELEVATION
JOEL L. SEVILLEJA
LOCATION: TOILET FRONT ELEVATION A-03
REG. NO. 0071237 DATE: JANUARY 5,2024 MAIN BUILDING LEFT ELEVATION
SAN QUINTIN, ALFONSO LISTA, IFUGAO TOILET LEFT ELEVATION
PTR. NO. 1750689 ISSUED: SAN JUAN CITY
1 2 3 4 5
RIB TYPE ROOFING
0.6 WHITE COLOR RIB TYPE ROOFING
0.6 WHITE COLOR

CEILING VOID
CEILING LINE
+2.7 METER CEILING VOID CEILING LINE
+2.7 METER

2600

2400
LEARNING
FFL LECTURE RESOURCE STORAGE WORKSHOP MALE FEMALE
SHOWER SHOWER MALE
+0.1 METER
ROOM CENTER ROOM WITH SINK AREA AREA TOILET
NGL FFL
+0.0 METER +0.0 METER

1 MAIN BUILDING SECTION THRU "E" 2 TOILET SECTION THRU "E"


A-04 SCALE 1:75 M. A-04 SCALE 1:75 M.

CEILING LINE
CEILING VOID
+2.7 METER CEILING LINE CEILING VOID
+2.7 METER

3700

3100
2995

2800

2600
OPEN

FFL
+0.1 METER
WORKSHOP FEMALE
NGL WITH SINK FFL TOILET
+0.0 METER +0.0 METER

3 MAIN BUILDING SECTION THRU "D" 4 TOILET SECTION THRU "F"


A-04 SCALE 1:75 M. A-04 SCALE 1:75 M.

WIDTH 900

600

WOOD DOOR JAMB


PVC DOOR JAMB

WOOD FLUSH DOOR PVC FLUSH DOOR

HEIGHT

2100
STAINLESS STEEL STAINLESS STEEL

1800
DOOR LOCKSET DOOR LOCKSET

FFL FFL FFL

DOOR SCHEDULE
D D
1 2

TYPE FLUSH SWING DOOR FLUSH TYPE HALLOW CORE

LOCATION UNIT ROOM, TOILET

NO. OF SETS SIX (6) SETS EIGHT (8) SETS

WIDTH 1600
400

ALUMINUM FRAME ANALOK

300
HEIGHT

ALUMINUM FRAME
1200 GLASS

SINGLE GLAZE
2100

TEMPERED GLASS

1900

1600
VARIES

900

FFL FFL FFL

WINDOW SCHEDULE W W
1 2

TYPE JALOUSIE WINDOW AWNING WINDOW

LOCATION UNIT ROOM TOILET, KITCHEN

NO. OF SETS TWO (2) SETS FOUR (4) SETS

5 SCHEDULE OF DOORS AND WINDOWS


A-04 SCALE 1:75 M.

STRUCTURAL ENGINEER OWNER: PROJECT TITLE: SHEET CONTENTS: REVISIONS DWG NO:

MAIN BUILDING SECTION THRU "E" DESCRIPTION DATE


PROPOSED ORGANIC FARMING TOILET SECTION THRU "E"
J & E FARMING SCHOOL INC. LEARNING CENTER MAIN BUILDING SECTION THRU "D"
JOEL L. SEVILLEJA
LOCATION: TOILET SECTION THRU "F" A-04
REG. NO. 0071237 DATE: JANUARY 5,2024 SCHEDULE OF DOORS AND WINDOWS
SAN QUINTIN, ALFONSO LISTA, IFUGAO
PTR. NO. 1750689 ISSUED: SAN JUAN CITY

You might also like