HOURLY INSPECTION REPORT FOR PRODUCTION SHIFT C DATE:- 25-10-2024 TIME: 01:00 AM

ACTUAL
M/C LENGTH SDT. ACTUAL STD. W.THICK STD. OD ACTUAL OD METHYLENE HEAT SPECIFIC PRESSURE IMPACT &
SIZE CLASS MATERIAL W.THICK FITTING REMARKS
(NOS) (M) WEIGHT. KG. WEIGHT KG MIN - MAX MIN - MAX MIN - MAX CHLORIDE REVERSION GRAVITY TEST VOICE TEST
MIN - MAX
8 6" CLASS-D U-PVC 6 39.690 - 40.440 41.110 8.80 - 8.98 8.81-9.06 168.00 - 168.50 168.31-168.40 Inside Attack

11 63mm PN-16 PPR-C 4 5.380 - 5.948 8.60 - 9.70 63.00 - 63.60 ----- ----- -----

16 63mm PN-10 HDPE-100 10 FEET 2.048 - 2.197 2.060 3.80 - 4.10 3.81-3.3.96 63.00 - 63.60 60.40 ----- ----- -----

17 160mm PN-08 HDPE 12 42.012 - 44.592 44.820 7.70 - 8.20 7.82-8.34 160.00 - 161.50 161.10

NOTE:
NOTE: MENTIONED TESTS BEING PERFORMED IN THE START OF EACH SHIFT/MACHINE AND END OF SHIFT. IN CASE OF TEST
FAILURE, THAT TEST WILL BE REPEATED TILL RESULT IS ACHIEVED.

QC INSPECTOR QC CAPTAIN QC MANAGER