Drawing
Drawing
Drawing
SUPPLY, SCADA SYSTEM OF METRO LINE 7 [ANDHERI EAST – DAHISAR EAST] OF MUMBAI METRO RAIL
PROJECT OF MMRDA
CONTRACT – CA58
DRAWINGS
Sr. No. Drawing Name Drawing Number No. of Sheets
1 Traction Power Supply for Line 2A, 2B & 7 AICA-L7-SYS-PST-1S5-X10008 1
2 Location for RSS AICA-L7-SYS-PST-1S5-X10012 1
3 110/33kV & 110 or 25kV Schematic of Typical GIS RSS AICA-L7-SYS-PST-1S5-X10013 1
4 Schematic for 33kV Power Distribution Network AICA-L7-SYS-PST-1S5-X10014 1
5 Typical Schematic of SCADA System AICA-L7-SYS-PST-1S5-X10015 1
6 Typical earthing Schematic AICA-L7-SYS-PST-1S5-X10016 1
7 Single Line diagram of 25kV TSS AICA-L7-SYS-PST-1S5-X10017 1
8 Details of Temporary Barricading (2 m Height) AICA-L7-SYS-PST-1S5-X10018A 1
9 Details of Temporary Barricading (1 m Height) AICA-L7-SYS-PST-1S5-X10018B 1
F E D C B A
4 4
SSP
2A 7 SSP
NS
SSP RSS
3 3
RSS SSP
SSP
NS
SSP
SSP
SSP
2 2
2A
RSS
2B
7
SSP SSP
3 3
NS
2B
SSP
GENERAL NOTES:
RSS SSP NS SSP RSS 2. ALL DIMENSIONS ARE TO BE READ AND NOT MEASURED.
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
POWER SUPPLY, TRACTION & SCADA SYSTEM
4 4
3 3
.96
KHATAU MILLS COMPOUND 86
91
.75
26
.4
72
.2
30 31.
.6 7
10
0m
3 3
GENERAL NOTES:
NOTE : 1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. ALL DIMENSIONS ARE TO BE READ AND NOT MEASURED.
1. DIMENSION OF RSS IS IN METERS 3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
2. DIMENSION SHOWN IS TENTATIVE AND MAY VARY 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
4
AT THE TIME OF SITE SURVEY THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
POWER SUPPLY, TRACTION & SCADA SYSTEM
4 4
PTR
3
2 POWER TRANSFORMER 3
ATR
3 AUXILIARY TRANSFORMER
TTR
4 TRACTION TRANSFORMER
2 2
3 3
GENERAL NOTES:
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
POWER SUPPLY,TRACTION AND SCADA SYSTEM
PTR
2 POWER TRANSFORMER
4 4
ATR
3 AUXILIARY TRANSFORMER
CB
4 33kV CIRCUIT BREAKER(RSS)
CB
5 33kV CIRCUIT BREAKER(ASS)
CB
6 33kV RING CB/INTERRUPTER
CB
7 25kV CIRCUIT BREAKER(TSS)
TTR
8 TRACTION TRANSFORMER
9 CABLE TERMINATION
3 3
10 33kV CABLE
11 110kV CABLE
2 2
3 3
GENERAL NOTES:
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
POWER SUPPLY, TRACTION & SCADA SYSTEM
MUMBAI METROPOLITAN REGION DEVELOPMENT DRAWING TITLE: DRAWING NUMBER
R02 DAHISAR STN REMOVED MP MP PDP 17.07.17 R02 SCHEMATIC FOR 33kV POWER DISTRIBUTION NETWORK AICA-L7-SYS-PST-1S5-X10014
AUTHORITY (MMRDA)
R01 COMMENTS ATTENDED LKP MP PDP 02.05.17 R01
SHEET NO. REV. DATE. SCALE. SIZE. STATUS
REV. PARTICULARS DRN. CHD. VER. DATE ISSUE DATE REV. FOR CONSTRUCTION AICA Consortium (GC) 1 OF 1 R03 25.06.2018 NTS A1 FOR TENDER
F E D C B A
F E D C B A
4 4
3 3
2 2
3 3
GENERAL NOTES:
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
4 4
3 3
2 2
3 3
GENERAL NOTES:
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
4 4
3 3
2 2
3 3
GENERAL NOTES:
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
4 4
MMRDA
MMRDA 3
2 2
3 3
GENERAL NOTES:
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5
4 4
MMRDA
MMRDA
3 3
2 2
3 3
GENERAL NOTES:
3. ANY DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE GC/MMRDA BEFORE EXECUTION OF WORK AT SITE.
4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING & FIRE FIGHTING,
ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
5. THESE ARE THE CONSTRUCTION REFERENCE DRAWINGS HOWEVER CONTRACTOR SHALL PREPARE INSTALLATION DRAWING FOR
THE ACTUAL WORK EXECUTION AT SITE AND OBTAIN APPROVAL
4 4
6. MMRDA DO NOT HAVE RESPONSIBILITY OF CORRECTNESS OF ACTUAL INSTALLATION AT SITE.
7. CONSTRUCTION AGENCY IS REQUESTED TO BRING ANY DISCREPANCY TO ENGINEER's NOTICE BEFORE ACTUAL EXECUTION.
PROCESS NAME DATE PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE
REVISION DESCRIPTION DATE
VERIFIED BY NOT APPLICABLE APPROVED BY APPROVED BY
NAME OF PROJECT:
DRAWN BY NOT APPLICABLE DRAWN BY ANKIT AGARWAL
OHE DRAWING
LINE 7 ANDHERI TO DAHISAR EAST MRTS CORRIDOR
5 GENERAL CONSULTANT STATION: NAME OF WORK: 5