PL-205
PL-205
PL-205
01 02 03 04 05 06 07 08 09 10 11
CURRENT STATUS :
---------
GAMAL EL-TAYAR
Pressure vessel Pressure vessel
####
00 08-10-2024 ------------
B
ROOF 35Ø cws pipe for TOILET at DETAIL-3 T/B
+3.75m
FFL
D 35Ø cws pipe for TOILET at DETAIL-2 T/B 35Ø cws pipe for TOILET at DETAIL-2 T/B
Enquiry No. : Application No : -- / ---- / --
CONSULTANT REG. NO.: / 201 GRADE : A CONSULTANT REG. NO.: GRADE : --
CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
CLIENT:
CONSULTANT:
70102013
LOCATION:
ROWDATH HAMAMA
01
--- R O A D ---
ENTRANCE / EXIT --- R O A D ---
34 33
N
±0.00
L.V.L PARKING
±0.00
L.V.L
±0.00 N
MINARAT
MOSQUE
PLOT AREA AREA STATEMENT 5,457.0 SQ.M. 40 36 TOP 5201 L.V.L
+9600mm
SLOPE 1:200
GROUND FLOOR
BUILT-UP
COVERED AREA
AREA (1836.5 / 5,457.0 x 100) 1836.50 SQ.M. 33.65% TOP
+6500mm
SLOPE 1:200 29
TOP
ENTRANCE / EXIT
NO. &COVERED
TOTAL
IMAM MUADDIN AREA
CAR
OFPARKING
(2,171.5
CAR PARKING
SQ.M.) 39.79
40NOS
2 NOS% SLOPE 1:200 SLOPE 1:200 TOP +6500mm TOP
+11600mm
TOP
TOP
GROUND FLOOR NO. OF PRAYING MEN 1078 MEN +11600mm SLOPE 1:200 ±0.00
L.V.L
+0.45m
F.F.L
--- R O A D ---
SLOPE 1:200
1:200
--- S I K K A ---
PARKING
±0.00 TOP
+11600mm SLOPE 1:200 SLOPE 1:200 +7.40m RIDGE
F.F.L
5,457.0 sq.m..
+6500mm
SLOPE 1:200
+6.50m
F.F.L TOP
+9600mm 20
SLOPE
1:200
+9600mm
TOP
+7500mm SLOPE 1:200 SLOPE 1:200 TOP
+9600mm
SLOPE 1:200
+11600mm
SLOPE 1:200
+11600mm
+6500mm
TOP
L.V.L TOP
SLOPE 1:200 TOP TOP
+6500mm RIDGE F.F.L ±0.00
L.V.L
±0.00
ENTRANCE / EXIT
+0.15m
P.V.L +0.15m
P.V.L 13
+4.95m
T.O.P +4.95m
T.O.P 04 12
+4.95m +4.95m
T.O.P +4.95m
+3.90m
FFL ±0.00
L.V.L SUBSTATION
+4.95m
T.O.P +4.95m
T.O.P
+4.95m
+4.95m
T.O.P
T.O.P
+0.15m +0.15m 01 03
SITE PLAN
01 P.V.L P.V.L ENTRANCE / EXIT ENTRANCE / EXIT
--- R O A D ---
01 01A 02 03 04 05 06 08
07 10
09 11
B
C DETAIL-1
SCALE-
+0.45m
FFL 1:50
D ENTRANCE-3
+0.45m
FFL LOBBY
+0.60m
FFL ELC ROOM
MINARAT&
E ABLUTION 6 BATH
PRAYING
WOMEN'S
(105
FFL PRAYERS)
+0.60m HALL
F DIS.
WC DETAIL-2 1:50
SCALE- DUCT
G
H SHAFT 5 WC WC KITCHEN
I AUDIO
MEN'S
(637 PRAYERS)
PRAYING HALL PRAYING
(441 PRAYERS)
HALL
DAILY MEN'S LIWAN
+0.60m ENTRANCE-1 +0.60m
+0.60m
FFL +0.60m
FFL +0.60m
FFL FFL FFL
J
K
L
ABLUTION
+0.60m DETAIL-3
SCALE-
LOBBY 1:50
M
N 2
1 FFL DETAIL-4 BATH
O
P 4
3 SHO.
Q ENTRANCE-2
+0.45m
FFL DETAIL-5 ROOM
SCALE-
1:50 WATER TANK ROOM KITCHEN BATH BATH
R DUCT
01 01A 02 03 04 05 06 08
07 10
09 11
MOSQUE PLAN
01 01A 02 03 04 05 06 07 09
08 10
11
B
C
D 6 MINARAT
G
H 5
I 01 03
02 04 05 07
06 08 09 10 11
RIDGE
J
K
L BED
F F LROOM
+0.45m BED ROOM BED ROOM BED ROOM DETAIL-4
BED ROOM BED ROOM +0.45m
FFL
C
B BATH CORRIDOR BATH BATH CORRIDOR BATH
M
N 2
1 D KITCHEN MAJLIS
+0.45m WC WC
DUCT MAJLIS KITCHEN +0.45m
E ENTRANCE
+0.45m FFL ENTRANCE
+0.45m FFL
O
P TOP
+6500mm 3 4 FFL DETAIL-2 FFL
Q +5.30m
F.F.L
RIDGE TOP
+6500mm 7 DETAIL-1 DETAIL-3
01 01A 02 03 04 05 06 07 09
08 11
10
IMAM PLAN
ROOF PLAN
2
1 2
1
DIS. 01 03
02 04 05 07
06 08 09 10 11
ABLUTION
+0.60m
FFL TOILET A
DRINKING WATER FOUNTAIN
Pressure vessel
2
1
2
1 SHO. Pressure vessel
4
3
4
3 C
B +3.75m
FFL
ROOF PLAN
COLUMN SERVED
SYSTEM
LOCATION
NO. BOSSTER PUMP 3
1
4
SPECIFICATION
FLOW
FLUIDRATE (GPM)/SET
TYPE 6
5
TOTAL HEAD
EXPANSION
POWER (ELEC)
TANK
(M. OF
VOLUME
WATER)(L) WATER HEATER SCHEDULE
BASE TYPE
QUANTITY
REMARKS
RPM
TANK SCHEDULE
6 DIS.
ABLUTION WC LEGEND
400
SEALED
PIPE
150
PVC SLEEVE,
WITHGAP
MASTIC
TO BE 450 TO 600mm RENDERING
1:3
GRADE
200x200x100
BLOCK
12mmSAND
THICK
WORK
25CEMENT
CONCRETE
CONC.
MORTAR
FILLED
MORTOR
SUPPORT
WITH
BASE WATER
INSTALLATION
PIPE THROUGH
DETAILROOF TANKER FILL CONNECTION DETAILS
450
400
150
COLUMN SERVED
SYSTEM NO. VALVE CHAMBER (VC) PIPE WITH CONCRETE
ENCASEMENT
400 DETAIL WATER HEATERFLOOR
DETAILS
MOUNTED WATER FILTER DETAILS PIPE PIPES
FOR SLEEVETHROUGH
DETAIL SLABS
SPECIFICATION TYPE
LOCATION
FLUID
FLOW RATE
TOTAL HEAD(GPM)/SET
(M. OF WATER)
EXPANSION
POWER (ELEC)
TANK VOLUME (L)
RPM
BASE TYPE
QUANTITY
REMARKS
1 TANK SCHEDULE
6
3
5
4
LEGEND
400
SEALED
PIPE
PVC SLEEVE,
WITHGAP
MASTIC
TO BE 150 TO 600mm
450 RENDERING
1:3
GRADE
200x200x100
BLOCK
12mmSAND
THICK
WORK
25CEMENT
CONCRETE
CONC.
MORTAR
FILLED
MORTOR
SUPPORT
WITH
BASE WATER
INSTALLATION
PIPE THROUGH
DETAILROOF TANKER FILL CONNECTION DETAILS
GATE VALVE
COUPLER/UNION 600x600
200 200
150 PIPE BEDDING DETAIL PIPE PIPE
FOR SLEEVE
THROUGH
DETAILWALL
150
450
400
150