GENERAL NOTES

-CONTRACTOR SHALL COORDINATE THESE WORKS WITH OTHER


SERVICES AND STRUCTURE, PRIOR TO ANY PIPE WORK ASSEMBLY
-THE DRAWINGS SHALL BE READ IN CONJUNCTION WITH Specifications
-ALL PIPE WORK INSIDE TOILETS/KITCHEN, BELOW FALSE CEILING,
AND ALL OTHER PIPE WORK (ABOVE FALSE CEILING, INSIDE DUCTS,
ON ROOF ETC.) SHALL BE COPPER TO BS:2871 PART 1.
-THE TREATED "NON-POTABLE" WATER LINE SHALL FEED THE FLUSH
TANKS OF WC'S INSIDE TOILETS OF THE MAIN SCHOOL BUILDING
-ALL TREATED WATER PIPE WORK INSIDE TOILETS, BELOW FALSE
CEILING, AND ALL OTHER PIPE WORK (ABOVE FALSE CEILING, INSIDE
DUCTS) THAT FEED THE FLUSH TANKS OF WC'S OF THE MAIN
BUILDING SHALL BE POLYPROPYLENE TO BE EASILY DISTINGUISHED
FROM THE POTABLE WATER LINES DURING MAINTENANCE.
-ALL THE SANITARYWARE SHALL BE PROVIDED WITH INDIVIDUAL
ISOLATING VALVE AT LOW LEVEL.
WASH BASIN : 1/2" Ø, 2Nos. VALVES
W.C. CISTERN : 1/2" Ø, 1No. VALVE
SINK : 1/2" Ø, 2Nos. VALVES
-ALL EXPOSED (TO SIGHT) PIPE WORK, VALVES AND METAL TRIMS
NEAR PLUMBING FIXTURES SHALL BE CHROMIUM PLATED.
-ALL PIPE WORK SHALL BE SUPPORTED BY MEANS OF APPROVED

-FINAL LOCATION AND HEIGHT OF ALL SHOWN BIB TAPS ARE


SUBJECT TO ARCH'S APPROVAL.
-THE CONTRACTOR SHALL COORDINATE WITH FINAL KITCHEN
EQUIPMENT/CABINET LAYOUT PROVIDED BY THE SPECIALIST

-THE CONTRACTOR SHALL COORDINATE WITH FINAL LABORATORIES


EQUIPMENT/CABINET LAYOUT PROVIDED BY THE SPECIALIST
SUPPLIER BEFORE CARRYING OUT ANY WORK AT SITE.
-CONTRACTOR TO CO-ORDINATE WITH FINAL FALSE CEILING LAYOUT
WHICH MAY REQUIRE TO REROUTE SOME PIPE RUNS.
-CONTRACTOR TO CO-ORDINATE WITH TYPE AND MAKE OF
APPROVED SANITARY FIXTURES.
-ACTUAL PUMP HEAD FOR BOOSTER / TRANSFER PUMP SETS
SHALL BE CALCULATED AND SUBMITTED FOR ENGINEERS APPROVAL

-CONTRACTOR SHALL READ ALL DESIGN/CONTRACT DRAWING/ IN


CONJUNCTION WITH SPECIFICATIONS AND DEFICIENCIES IF ANY
DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF ENGINEER
DURING TENDER STAGE ONLY. NO VARIATION CLAIM (COST AND
TIME) SHALL BE ENTERTAINED IN THIS REGARD AFTER THE
FINALIZATION OF CONTRACT.
-WATER HAMMER ARRESTOR SHALL BE PROVIDED AFTER THE
ISOLATING VALVE FOR EACH TOILET/BATH, KITCHEN, PANTRY

-ALL HIGH POINTS OF BOOSTER SYSTEM SHALL BE PROVIDED


WITH AUTOMATIC AIR VENT AND LOW POINT SHALL BE
PROVIDED WITH DRAIN POINT WHETHER SHOWN OR NOT IN LAYOUT.

-CONTRACTOR TO ENSURE THAT ALL PUMPS AND MECH. PLANT


ARE INSTALLED ON MIN.150mm CONCRETE PLINTH.
-ALL HOSE BIBS ARE AT L/L WITH ISOLATING VALVE ON VERTICAL.
-ALL BOOSTED WATER NETWORK SHALL BE CHECKED FOR
EXPANSION AND CONTRACTION. ADDITION OF EXPANSION
CONNECTIONS SHALL BE DONE WHETHER SHOWN OR NOT
-ALL COLD WATER PIPE ON ROOF & INSIDE SHAFTS SHALL BE
INSULATED AS SPECIFIED.

01 02 03 04 05 06 07 08 09 10 11

CURRENT STATUS :
---------

GAMAL EL-TAYAR
Pressure vessel Pressure vessel

####
00 08-10-2024 ------------

REV. DATE DESCRIPTION BY

QR-Code MUNICIPALITY STAMP

B
ROOF 35Ø cws pipe for TOILET at DETAIL-3 T/B

+3.75m
FFL

C 54Ø cws pipe for TOILET at DETAIL-1 T/B

40Ø cws pipe for TOILET at DETAIL-4 T/B DUCT


40Ø cws pipe for TOILET at DETAIL-4 T/B

D 35Ø cws pipe for TOILET at DETAIL-2 T/B 35Ø cws pipe for TOILET at DETAIL-2 T/B
Enquiry No. : Application No : -- / ---- / --
CONSULTANT REG. NO.: / 201 GRADE : A CONSULTANT REG. NO.: GRADE : --
CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :

TECH'L MANAGER: ENG. GAMAL TAYAR TECH'L MANAGER:

REGISTRATION No. : 2024 REGISTRATION No :

CLIENT:

CONSULTANT:

ROOF PLAN PROJECT:

MOSQUE & IMAM HOUSE


P.O. Box: 19786 Doha, Qatar
Tel. : +974 44795709
Fax : +974 44860780
info@dimensions-qa.com
www.dimensions-qa.com

70102013
LOCATION:
ROWDATH HAMAMA

DATE: JOB NO.:


04-11-2024 DEC-2417
TITLE:

IMAM ROOF WATER SUPPLY PLAN

DRAWING NO.: SCALE:


PL-205 1:100@A1

DRAWN BY: DESIGNED BY: CHECKED BY:


DEC FIROS ABDUL KHADAR FIROS ABDUL KHADAR
CAD FILE: REGISTRATION No. : REGISTRATION No. :
3075 3075
REVISION: SIGNATURE: SIGNATURE:

01
--- R O A D ---
ENTRANCE / EXIT --- R O A D ---

34 33

N
±0.00

L.V.L PARKING
±0.00
L.V.L

±0.00 N
MINARAT

MOSQUE
PLOT AREA AREA STATEMENT 5,457.0 SQ.M. 40 36 TOP 5201 L.V.L
+9600mm

SLOPE 1:200

GROUND FLOOR
BUILT-UP
COVERED AREA
AREA (1836.5 / 5,457.0 x 100) 1836.50 SQ.M. 33.65% TOP
+6500mm
SLOPE 1:200 29

IMAM HOUSE GROUND FLOOR


F.A.R 335.00 SQ.M.
0.33% SLOPE 1:200 +5.30m
F.F.L
RIDGE +9600mm TOP
+6500mm
SLOPE 1:200

TOP

ENTRANCE / EXIT

TOTAL BUILT-UP AREA


BUILT-UP AREA
COVERED AREA (335.00/
TOTAL5,457.0 x 100) 335.00 SQ.M.
2,171.5
6.13% SQ.M. ±0.00
L.V.L TOP
+6500mm SLOPE 1:200 +9600mm TOP 28
+9600mm
SLOPE 1:200

NO. &COVERED
TOTAL
IMAM MUADDIN AREA
CAR
OFPARKING
(2,171.5
CAR PARKING
SQ.M.) 39.79
40NOS
2 NOS% SLOPE 1:200 SLOPE 1:200 TOP +6500mm TOP
+11600mm
TOP

TOP

GROUND FLOOR NO. OF PRAYING MEN 1078 MEN +11600mm SLOPE 1:200 ±0.00
L.V.L
+0.45m
F.F.L

--- R O A D ---

GROUND FLOOR NO. OF PRAYING


GRAND TOTAL WOMEN 105 WOMEN
1183 NOS. SLOPE 1:200
SLOPE

SLOPE 1:200
1:200

--- S I K K A ---
PARKING

±0.00 TOP
+11600mm SLOPE 1:200 SLOPE 1:200 +7.40m RIDGE
F.F.L

L.V.L RIDGE SLOPE 1:200 SLOPE 1:200 TOP


+9600mm
--- R O A D ---

5,457.0 sq.m..
+6500mm
SLOPE 1:200

SLOPE 1:200 +9.40m RIDGE TOP ±0.00


L.V.L
1:200
SLOPE
--- S I K K A ---

RIDGE SLOPE 1:200 F.F.L


SLOPE 1:200 SLOPE 1:200
SLOPE 1:200

+6.50m
F.F.L TOP
+9600mm 20
SLOPE

1:200
+9600mm

TOP
+7500mm SLOPE 1:200 SLOPE 1:200 TOP
+9600mm
SLOPE 1:200

+11600mm

SLOPE 1:200

TOP TOP TOP


+9600mm ±0.00
L.V.L

±0.00 +5.30m 75Ø main pipe for tanks


+11600mm

+11600mm

+6500mm
TOP

L.V.L TOP
SLOPE 1:200 TOP TOP
+6500mm RIDGE F.F.L ±0.00
L.V.L

±0.00
ENTRANCE / EXIT

75Ø main pipe L.V.L


for tanks

+0.15m
P.V.L +0.15m
P.V.L 13

+4.95m
T.O.P +4.95m
T.O.P 04 12

+4.95m +4.95m
T.O.P +4.95m

T.O.P DUCT T.O.P PARKING --- SUBSTATION ---

+3.90m
FFL ±0.00
L.V.L SUBSTATION
+4.95m
T.O.P +4.95m
T.O.P
+4.95m

+4.95m
T.O.P

T.O.P

+0.15m +0.15m 01 03

SITE PLAN
01 P.V.L P.V.L ENTRANCE / EXIT ENTRANCE / EXIT

SCALE 1:150(A1) --- R O A D ---

--- R O A D ---

01 01A 02 03 04 05 06 08
07 10
09 11

B
C DETAIL-1
SCALE-
+0.45m
FFL 1:50

D ENTRANCE-3
+0.45m
FFL LOBBY
+0.60m
FFL ELC ROOM
MINARAT&

E ABLUTION 6 BATH

PRAYING
WOMEN'S
(105
FFL PRAYERS)
+0.60m HALL

F DIS.
WC DETAIL-2 1:50
SCALE- DUCT

G
H SHAFT 5 WC WC KITCHEN

I AUDIO

MEN'S
(637 PRAYERS)
PRAYING HALL PRAYING
(441 PRAYERS)
HALL
DAILY MEN'S LIWAN
+0.60m ENTRANCE-1 +0.60m

+0.60m
FFL +0.60m
FFL +0.60m
FFL FFL FFL

J
K
L

ABLUTION
+0.60m DETAIL-3
SCALE-
LOBBY 1:50

M
N 2
1 FFL DETAIL-4 BATH

TOILET DIS. SCALE- 1:50


DRINKING WATER FOUNTAIN

O
P 4
3 SHO.

Q ENTRANCE-2
+0.45m
FFL DETAIL-5 ROOM
SCALE-
1:50 WATER TANK ROOM KITCHEN BATH BATH

R DUCT

01 01A 02 03 04 05 06 08
07 10
09 11

MOSQUE PLAN
01 01A 02 03 04 05 06 07 09
08 10
11

B
C

D 6 MINARAT

G
H 5

I 01 03
02 04 05 07
06 08 09 10 11

RIDGE

J
K
L BED
F F LROOM
+0.45m BED ROOM BED ROOM BED ROOM DETAIL-4
BED ROOM BED ROOM +0.45m
FFL

C
B BATH CORRIDOR BATH BATH CORRIDOR BATH

M
N 2
1 D KITCHEN MAJLIS
+0.45m WC WC
DUCT MAJLIS KITCHEN +0.45m

E ENTRANCE
+0.45m FFL ENTRANCE
+0.45m FFL

O
P TOP
+6500mm 3 4 FFL DETAIL-2 FFL

Q +5.30m
F.F.L
RIDGE TOP
+6500mm 7 DETAIL-1 DETAIL-3

01 01A 02 03 04 05 06 07 09
08 11
10

IMAM PLAN
ROOF PLAN

2
1 2
1

DIS. 01 03
02 04 05 07
06 08 09 10 11

ABLUTION
+0.60m
FFL TOILET A
DRINKING WATER FOUNTAIN

Pressure vessel

2
1
2
1 SHO. Pressure vessel

4
3
4
3 C
B +3.75m
FFL

WATER TANK D DUCT

ROOF PLAN

DPMESTIC PUMP EQUIPMENT SCHEDULE

COLUMN SERVED
SYSTEM
LOCATION
NO. BOSSTER PUMP 3
1
4

SPECIFICATION
FLOW
FLUIDRATE (GPM)/SET
TYPE 6
5

TOTAL HEAD
EXPANSION
POWER (ELEC)
TANK
(M. OF
VOLUME
WATER)(L) WATER HEATER SCHEDULE

BASE TYPE
QUANTITY
REMARKS
RPM

TANK SCHEDULE

6 DIS.

ABLUTION WC LEGEND

SHAFT 5 BOOSTER PUMPSET DETAIL

PIPE SUPPORT DETAILS BOOSTER PUMP SET ISOMETRIC DETAIL

400

600x600 GRADE 20 CONCRETE SPLAY WALL/FALSE CEILING MOUNTED 400

SEALED
PIPE
150
PVC SLEEVE,
WITHGAP
MASTIC
TO BE 450 TO 600mm RENDERING
1:3
GRADE
200x200x100
BLOCK
12mmSAND
THICK
WORK
25CEMENT
CONCRETE
CONC.
MORTAR
FILLED
MORTOR
SUPPORT
WITH
BASE WATER
INSTALLATION
PIPE THROUGH
DETAILROOF TANKER FILL CONNECTION DETAILS

DPMESTIC PUMP EQUIPMENT SCHEDULE GATE VALVE


COUPLER/UNION 600x600
200 200
150 PIPE BEDDING DETAIL PIPE PIPE
FOR SLEEVE
THROUGH
DETAILWALL

LIFTING PUMP BOOSTER PUMP BOOSTER PUMP


150

450
400
150

COLUMN SERVED
SYSTEM NO. VALVE CHAMBER (VC) PIPE WITH CONCRETE
ENCASEMENT
400 DETAIL WATER HEATERFLOOR
DETAILS
MOUNTED WATER FILTER DETAILS PIPE PIPES
FOR SLEEVETHROUGH
DETAIL SLABS

SPECIFICATION TYPE
LOCATION

FLUID

FLOW RATE
TOTAL HEAD(GPM)/SET
(M. OF WATER)

EXPANSION
POWER (ELEC)
TANK VOLUME (L)

RPM

BASE TYPE
QUANTITY

REMARKS

1 TANK SCHEDULE

6
3
5
4

WATER HEATER SCHEDULE

LEGEND

BOOSTER PUMPSET DETAIL

PIPE SUPPORT DETAILS BOOSTER PUMP SET ISOMETRIC DETAIL

400

600x600 GRADE 20 CONCRETE SPLAY WALL/FALSE CEILING MOUNTED 400

SEALED
PIPE
PVC SLEEVE,
WITHGAP
MASTIC
TO BE 150 TO 600mm
450 RENDERING
1:3
GRADE
200x200x100
BLOCK
12mmSAND
THICK
WORK
25CEMENT
CONCRETE
CONC.
MORTAR
FILLED
MORTOR
SUPPORT
WITH
BASE WATER
INSTALLATION
PIPE THROUGH
DETAILROOF TANKER FILL CONNECTION DETAILS

GATE VALVE
COUPLER/UNION 600x600
200 200
150 PIPE BEDDING DETAIL PIPE PIPE
FOR SLEEVE
THROUGH
DETAILWALL
150

450
400
150

VALVE CHAMBER (VC) PIPE WITH CONCRETE


ENCASEMENT
400 DETAIL WATER HEATERFLOOR
DETAILS
MOUNTED WATER FILTER DETAILS PIPE PIPES
FOR SLEEVETHROUGH
DETAIL SLABS

You might also like