Sos-Final Floor Plans With Shop Area Allotment
Sos-Final Floor Plans With Shop Area Allotment
Sos-Final Floor Plans With Shop Area Allotment
'-5
18
30
'
1'
IO
L
2'-8"
L LV
AT
1'
RT
1'
From
1'
1 PE R
+1 '6''
1'
'0''
+0
1'
'6''
1'
+1
1
1'
MP LO
1'
1'
0
1'
RA 0 S
1
1'
2
1'
3
1'
4
1'
5
1:1
1'
6
1'
7
1'
8
1'
"
9
1'
'-7
10
1'
11
28
12
35'-5"
13
14
15
16
8'
17
C4
18
19
20
LG77
"
4'-6
C4
"
C4
8'-2
3'-3
"
6'-3
Coo t
"
4'-6"
Duc
lin
LG76
g
"
4'-3
C3
LG75
22
'-1
1
"
C4
"
'-8
LG74a
44
18
'-6
C3
"
LG74
C2
16
15 17
14
13 18
12
11
10 MM M
9 19 3M
12
8 = )=15 M
7 TH 18 5M
ID
6 W ER(1- = 30
55 RIS EAD
15
TR "
C1'2Ele
4
2'
2' '-5
3 17
1'
6'-1
2
-01
'-
6'-11
ct
"
1
aft
1"
&
Sh
3"
Lv
SLAB
UP
Lv
7'-1
ICE
Sh
&
SERV
aftct
1'
Ele
1"
1'
-01
2'
6"
3'
6"
6'-7
UT
"
TO FT
CU R LI
FO
8"
UT "
TO FT 6'-6
CU R LI
ICE
2'-5
SERV SLAB
C2
ICE
SERVSLAB
FO
"
RA 0 S
8"
2'-5
2'-5"
3'-6"
PL E
FIR
UM
1:1
"
"
6'-6
1'-3"
BI AF
SLAB
8"
MP LO
SERV
ICE
SH
NG T
t
1'-3
SERV
ICE
1'-3"
"
Duc
5'-11
&
SLAB
83
ing
"
mb
7'-1
"
Plu 4'-10
6'-1"
8"
0"
'-1
"
6'-1
2 PE
23
LG73
"
4'-
10
"
RA
C3
T IO
LG72
C3
C3
"
8'-2
3'-3
"
"
6'-3
'-7
80
Coo t
"
Duc
16
lin
g
'
"
4'-3
LG71
C3
n
lum d
Co tate
Ro
LG78
C4
C2
LG70
C3
C3
LG79
LG69
C3
C4
C4
48'-3"
LG80 LG68
C3
C2
C4
"
C3
8'-2
3'-3
"
6'-3
Coo t
"
Duc
lin
LG81
g
"
C3 LG67 4'-3
C3
C3
n
lum d
Co tate
LG82
Ro
C4
LG66
C3
C2
C3
18'-3"
"
1'
2'-5
10"
3'-8"
" 1'-5"
SLAB
3'-8
2'
ICE
PL RE
SERV
4'
t
FI
Duc
UM SH
10"
ing
mb
BIN AFT
10'
Plu
LG65
-8"
G ICE
SLAB
SERV
11
&
10
12 "
C2
5'-1
9
C2
ST OM OU ND
88 13
ST OM OO
FR GR DLALA
C3
AI BA ND
FR H FL
7
TO MI 1010 11
14
C4
AI GR R
RC SEMIDFL ING
6T
6
RC OU
AS ME OO
5 15
AS
E
E ND
CU NT R
16
4
CU TO
TO 2
ND
17
17
TO
3
IN
UT
9
C4
C4
G
UT
8
2
12
1
13
1'
55
UP
14
LG98
44
15
15
4'-1"
1
3'-2"
3
16
t -0
UP
C2
17
af
18
9'-6"
Sh aft -01 SLAB
19
19
ICE
8'-7
20
ICE
t & Elect
C3
SERV
ec
"
"
El 10'-3
1'
CU RVI
3'
SE
TO CE
5'-1
UT LI
"
FO FT
2
R
C
C2
CU R LI
6'-7
FO
TO FT
"
UT
8"
38'-
6'-7
C4
LG63
2
"
C
CU R LI
FO
6"
TO FT
8"
UT
LG84
6'-7
C4
"
C2
2
C
C4
LG62
C5
LG85 C1
C2C
C4
3
C
12'
23'
C5
3
C
1
LG86
2
3
4
5
6
7
C6
8
9
10
12'
11
C4
12
13
14
15
16
17
18
19
LG97
20
21
C2
22
23
24
LG61a
C5
C
34'-
LG87 C6
8"
LG96
C3
C6
C3
LG61
LG88
RAMP
C6
LG95
C5
EXIT
C3
C1
C6
C5
LG94 C6
LG60
LG89 3'' Shift
C6
C6
LG93
RAMP 1
io 1:8
LG90
LG59
Slope rat
1'8'' Shift
C6 C6
CUT
LG91 OUT LG58
LG92
6'-6"
up
36'-6
"
r
48'-9"
LG56
LG54
LG53
70'-4"
LG50 LG51
LG49 LG48
LG41
Pipe
inlet
Water
LG46 LG47
YELLOW SHAFT LG40
SHIFTED TO RED LG45 LG44
16
17
14
18
19
20
15
13
WIDTH = 1219 MM
TREAD = 305 MM
STAIRCASE
RISER = 175 MM
12
11
FIRE
MID
9
1' LANDING
8
10
LANDING
3MX2M 9
6'' THICK BRICK WALL
3'-9"
SERVICE SLAB
4'-9"
SERVICE 12
2MX2M 2MX2M WITH PLASTER FINISH LIFT
8
2'-7" LIFT PIT-1.8M LIFT PIT-1.8M 5 6 7 8 9 10 11 12 13 14 15 16 7 13
DEPTH DEPTH
1'
3'-7" 4"
4 17 6 14
WIDTH = 1219MM
4"
3 RISER(1-18)=153MM 18 5 15
2 TREAD = 305MM 4 16
SLAB
SERVICE UP 1 3 17
2 18
LIFT IN RCC WALL 1 19
SERVICE LIFT LIFT IN RCC WALL
LG38
3MX2M 20
UP
SHOP
43'2" X 8'0" LIFT LOBBY - 1
UP
+1' LVL
526 SQF. LIFT LOBBY - 3 6'' THICK BRICK WALL
+1' LVL WITH PLASTER FINISH
2
1
UP
1 2
LG29
1 UP
NT 1
TO BASEME
2
6'' THICK BRICK WALL
WITH PLASTER FINISH
LIFT LOBBY - 2
+1' LVL
3 2MX2M 2MX2M
LIFT PIT-1.8M
DEPTH
SLAB
17 5
16 6
15 7
14 8 16'-7"
SERVICE CORRIDOR
2'-6"
13 9
Pressurization Plumbing Duct Elect & Lv Shaft -01
Duct
12 11 10
1' 5'-8" 1'
10" 10"
SERVICE SLAB
8" SERVICE SLAB
2'-3"
2'-3"
SERVICE CORRIDOR
2'
3'-3"
3'-3"
2'
1'-3"
1'
3'-8" 7'-8"
4'
22
21
20
19
18
SHOP SHOP 17
16
LG7
15
LG12 LG11 LG10 LG9 LG8 LG6 LG5 LG4 LG3 LG2 LG1
14
12
11
8
5
4
2
1
1
10'
UND
RISER = 6'' FROM GRO
LEVEL
TREAD = 1'
1' 1' 1' 1' 1' 1' 10'-5" 1' 1' 1' 1' 1' 1'
3'-3"
3'-3"
3'-3"
Duct Duct
0.3m Duct Duct
4'-3"
4'-3"
4'-3"
4'-3"
SQ.FT
VIEW PREMIUM
ARCHITECTS
X-O STUDIO
ARCHITECTS
www.xdasho.com
FRONT
ROAD
M.O.S
BACK
H.T -SIDE
- 10
SIZE
LINE10 -24425
-Mtr
SIDE
Mtr MtrMtr
- 10
6.5
PREPARED
CHECKED
SHEET
SCALE BY
BY
TITLE
PROJECT
SINGAPORE
North
other work except by agreement.
064-000-106-AR-INT-1011
thes
R00
"
'-5
18
30
'
ROAD
1'
IO
2'-8"
AT
1'
1'
1'
1 PE R
1'
1'
1'
FR WER
1'
1
LO
MP LO
OM G
1'
1'
0
GRORO
1'
1
RA 0 S
1'
2
UN D
1'
3
UN
1'
4
1'
TO
1
5
1'
:
8"
6
1'
"
1'-8
1'
8
SERVICE
1'
9
1' 8"
10
1'
11
12
35'-5"
13
14
15
C22
16
8'
17
18
19
20
8"
BUA-
"
1'-8
8"
261 Sqft
C21
"
8'-2
3'-3
"
6'-3
1'-4
"
Coo t
2'-6
"
"
Duc
55
PD
lin
BUA-
8"
1'-4
g
1'-8"
"
"
1'-8
"
8" 4'-3
278 Sqft
C20
1'-4
"
54
1'
PD
1'-4
BUA-
8"
"
53
"
1'-8
4'-8
PD
"
" 8"
2'-6
277 Sqft
BUA-
C19 8"
"
1'-8
44
8"
'-6
280 Sqft
"
C18
1'-4
"
8"
52
1'
"
1'-8
PD
1'-4
"
BUA- 51 8"
4'-8
PD
"
"
2'-6
277 Sqft 15
16
17
14
13 18
3'
12
11
8" 10 MM M
9 19 3M
12
8 = )=15 M
7 TH 18 5M
ID
2'
6 W ER(1- = 30
55 RIS EAD
15
4 TR "
'-5
1'
2'
2'
3 17
1'
El
6'-1
NALA
2
'-3
-01
ec
6'-11
t&
"
aft
1
1"
Sh
Lv
SLAB
UP
Lv
7'-1
ICE
Sh
&
SERV
"
aft
ct
1'
Ele
1"
1'
-01
2'
6"
3'
6"
6'-7
8"
UT
"
1'-8
"
TO FT
CU R LI
8"
FO
8"
UT "
TO FT 6'-6
CU R LI
2'-5
ICE
SERVSLAB
FO
"
RA 0 S
8"
2'-5
2'-5"
3'-6"
PL E
FIR
UM
1:1
"
"
6'-6
1'-3"
C17
BI AF
SLAB
8"
8"
ICE
MP LO
SERV
SH
NG T
t
1'-3
SERV
ICE
"
1'-3"
1'-8
"
Duc
5'-11
SLAB
&
ing
mb
"
7'-1
"
Plu 4'-10
6'-1"
8" 8"
0"
"
6'-1
2 PE
BUA-
CB
RA
525 Sqft 8"
TI
C16
"
1'-8
O
8"
BUA- "
8'-2
3'-3
"
6'-3
80
Coo t
"
Duc
CB
623 Sqft
lin
C15
8"
g
'
"
1'-8
"
1'-4
4'-3
"
50
8"
PD
"
1'-1
2'-6
0"
n
C23
lum d
Co tate
Ro
BUA-
BUA- 562 Sqft
C14
8"
CB
"
1'-8
8"
200 Sqft
BUA-
C24 CB
562 Sqft
8"
C13
"
1'-8
BUA-
1'-4
"
49
1'
8"
PD
1'-4
"
48
4'-8
PD
"
272 Sqft
"
2'-6
BUA-
C25 564 Sqft
8"
C12
"
1'-8
BUA- 8"
8'-2
3'-3
C26
"
6'-3
Coo t
"
Duc
lin
563 Sqft
C11
8"
CB
g
"
"
1'-8
BUA-
60'-4
1'-4
"
"
47 4'-3
1'
8"
PD
1'-4
CB
"
C3 46
4'-8
PD
"
273 Sqft
"
2'-6
BUA-
n
lum d
Co tate C27 564 Sqft C10
CB 8"
"
1'-8
Ro
BUA-
8"
344 Sqft
2'-9
BUA-
45 CB
"
PD
"
2'-5 "
1'
2'-5
10"
3'-8"
" 1'-5"
SLAB
2'
3'-8
ICE
PLURE
SERV
CB
564 Sqft
4'
t
Duc FI
10"
MB HA
ing
mb
10'
Plu
IN FT
S
-8"
G
11
&
10
12 "
5'-1
9 1'-4"
8
ST OM OU ND
13
C9
ST OM OO
FR GR DLALA
2'-3"
AI BA ND
FR H FL
7
TO MI 1010 11
14
C4
AI GR R
RC SEMIDFL IN
6T
6
RC OU
AS ME OO
5 15
AS
E
E ND
CU NT R
16
4
CU TO
TO 2
ND
17
TO
3
IN
UT
9
GG
UT
88
2
77
12
12
1
13
13
1'
BUA-
55
UP
14
44
15
4'-1"
1
3'-2"
33
-0
UP
16
ft
17
2'-6
Sha aft -01
18
"
9'-6" SLAB
PD
19
ICE
8'-7
20
ICE
44
&
1132 Sqft
SERV
ct
ct Ele
Ele
"
"
10'-3
"
1'-4
1'
CU RV
3'
SE
TO ICE
5'-1
UT LI
"
FO FT
R
CU R LI
6'-7
FO
TO FT
"
UT
8"
6'-7
"
CU R LI
FO
TO FT
2'-
4"
8"
C8
6"
1'-
UT
PD
1'
43
4"
1'-
PD
6'-7
42
8"
"
4'-
NALA
BUA-
C7 1033 Sqft C1
8"
CB
"
1'-8
8"
23'
FROM RGRO
LOWE
BUA-
GR
OU
ND
UND
1
2
3
798 Sqft
TO
4
5
6
2'-6
7
"
C6
8
"
1'-4
9
PD
10
12'
41
11
CB
1'
8"
12
13
"
14
1'-4
PD
15
16
"
C6
40
1'-8
"
17
8"
4'-8
18
19
20
21
22
23
24
BUA-
797 Sqft
8"
C6
"
1'-8
8"
CB
PD39
C5
"
1'-4
C6
BUA- 8"
776 Sqft
1'-8"
8"
CB
C6
C4
13'-4"
38'-10"
12'
CB
C6
.5
SERVICE ROAD
R2
0'
8"
12'
1'-8"
8"
CB
767 Sqft
-3"
20'
6'
C6 13'
.5
RAMP - 1:7
-10
"
R1
CB
1'-6
"
2'-6"
C3
1'-4"
PD38 8"
3'' Shift
1'-8"
BUA- 8"
C6
C6 1'-8"
8"
8"
CB 985 Sqft
4'
CB
BUA-
CUT
E
LIN
OP
C2
8"
660 Sqft
SH
2'-6"
BUA-
A23
1'-8"
1'-4"
PD37
8"
OUT
1'
4'-8"
1'-4"
PD36
879 Sqft 1'8'' Shift Pipe inlet Pipe
Grey Water
pipe
Soil
Pipe
Ac
8"
CB
CB
1'-8"
C6 C6 8"
CB
Pipe inlet Pipe pipe Pipe
BUA-
Grey Water Soil Ac
8"
1'-8"
8"
542 Sqft
SHOP LINE
BUA- A22
C1 1259 Sqft
8"
CB
1'-8"
8"
8"
BUA-
572 Sqft
SHOP LINE
A21
1'-8"
8"
CB CB
Pipe inlet Pipe pipe Pipe
Grey Water Soil Ac
NALA
8"
PD17
3'-3"
1'-8"
8"
PD16 CB 8"
Pipe inlet Pipe pipe Pipe
BUA-
Grey Water Soil Ac
11'
SHOP LINE
A20 566 Sqft
8"
CB CB
2'-4"
1'-8"
FABRICATED 8"
D SITTING
BUA-
11'-9"
591 Sqft
SHOP LINE
8"
A19 CB CB
inlet Pipe
Water
Pipe
Grey
Pipe
Ac
pipe
Soil
8"
1'-8"
PD15
3'-2"
A24
8"
PD14
8"
BUA-
Grey Ac Soil Water
Pipe Pipe pipe inlet Pipe
BUA-
SHOP LINE
10'-10"
A18 554 Sqft 81 Sqft
8"
8" 8"
2'-4"
2'-10"
8"
8"
8"
7'-9" 3'-2"
8"
SHOP LINE SHOP LINE
7'
SHOP LINE 2'-10"
PD13
1'-4"
PD13
8"
8"
8"
2'-4"
2'-10"
A17
PD12
BUA-
8"
Grey
PD12
Ac Soil Water 8"
Pipe Pipe pipe inlet Pipe
11'-4"
SHOP LINE
D SITTING
A13
DUMMY
120 Sqft 8"
COLUMN
8"
3'-2"
1'-8"
SHOP LINE
BUA-
SHOP LINE
572 Sqft
11'-7"
DUMMY COLUMN
3'-11"
DUMMY COLUMN
7'
A12
8"
8"
153 Sqft
2'-4"
8"
CB
Ac Soil Water
CB
Grey
Pipe Pipe pipe inlet Pipe
8"
8"
PD11
3'-2"
BUA-
1'-8"
PD10
A15
8" 8"
Grey Ac Soil Water
Pipe Pipe pipe inlet Pipe
572 Sqft
SHOP LINE
8"
COLUMN
8"
8"
3'-2"
CB
1'-8"
1'-8"
A14
COPING BEAM
BEAM COPING
BUA- BUA
SHOP LINE
10'-10"
BUA
SHOP LINE
122 Sqft
8"
8" CB Grey
Pipe
Ac
Pipe
Soil Water
pipe inlet Pipe
1'-8"
3'-2"
PD9
Pipe Pipe inlet Pipe pipe
Ac
A25
Grey Water
Grey Water
PD8 8"
1'-8"
Soil
Soil
BUA
Grey Ac Soil Water
Pipe Pipe pipe inlet Pipe
8"
BUA- BUA
SHOP LINE
9'-6"
LANDING
B13
SHOP LINE
A9
16
17
14
18
19
20
15
659 Sqft
WIDTH = 1219 MM
TREAD = 305 MM
RISER = 175 MM
12
11
8"
10
SHOP LINE
MID
1'-8"
9
LANDING
3'-7"
1'
8
BUA-
Elect & Lv Shaft -02
BUA-
LANDING
15
1
14
13
12
11
11
10
MID
3MX2M 9
9
8
3'-9"
8"
7
SERVICE SLAB
6
4'-9"
SERVICE 8 12
2MX2M 2MX2M
1'-8"
LIFT
2'-7" LIFT PIT-1.8M LIFT PIT-1.8M 5 6 7 8 9 10 11 12 13 14 15 16 7 13
DEPTH DEPTH
1'
3'-7" 4"
4 17 14
20 19 18
UP 1 3 17
4
MPD2 2 18
3
1 19
2
SERVICE LIFT
685 Sqft
1
3MX2M UP 20
SHOP D SITTING
43'2" X 8'0" B11 MPD1
SHOP LINE
8"
8"
8"
8"
8"
8"
8"
GLASS DOOR
8"
8"
8"
8"
8"
8"
STARTING
POINT
STARTING
POINT
8"
BUA
CONNECTING
BRIDGE A7 728 Sqft A8
SHOP LINE
BUA
4" 4"
CB CB
9"
2'
6"
479 Sqft
9"
4" 4"
8"
8"
8"
8"
8"
8"
8"
BUA
A6
SHOP LINE
SHOP
Pipe
Grey
10"
Pipe
Ac
4'-6"
UP
pipe inlet Pipe
Soil Water
WIDTH = 1390MM 1
B10 B8 B7
RISER=153MM
8' X 389"
B9
TREAD = 305MM 2
495 SQF. 18
3
4
2MX2M
LIFT PIT-1.8M
2MX2M
LIFT PIT-1.8M
717 Sqft
FHC
DEPTH DEPTH
17 5
16 6
D SITTING
15 7 2"2" 4" 6"
4" 4"
14 8 16'-7"
BUA- BUA-
SERVICE CORRIDOR
2'-6"
BUA-
9"
BUA-
13 9 Pressurization Plumbing Duct Elect & Lv Shaft -01
2'
6"
Duct
12 11 10
9"
SERVICE SLAB
8" SERVICE SLAB
2'-3"
2'-3"
8'' COPING
2'
POINT
STARTING
3'-3"
3'-3"
2'
7'-8"
1'
3'-8"
4'
1'-8"
Ac
Pipe
8"
SHOP SHOP
BUA
SHOP LINE
pipe
Soil
pipe
Soil
pipe
Soil
8" 8"
Pipe
Pipe
Ac
Ac
Pipe
Ac
Pipe
Ac
1'-8"
Pipe
Grey
Pipe
Grey
Pipe
Grey
Pipe
Grey
inlet Pipe
Water
inlet Pipe
Water
inlet Pipe
inlet Pipe
Water
Water
B6 B5 B4 B3 B2 B1
SHOP LINE
CB
CB
SHOP LINE
CB CB
A4 A3 A2 A1
1'-8"
1'-8"
3'
8" 8"
762 Sqft 746 Sqft 745 Sqft 745 Sqft 929 Sqft 948 Sqft
BEAM COPING
COPING BEAM
22
pipe
Soil
pipe
Soil
pipe
Soil
pipe
Soil
pipe
Soil
Pipe Pipe inlet Pipe pipe
Ac
Pipe
Ac
Pipe
Pipe
Ac
Ac
Pipe
Ac
Pipe
Ac
Pipe
Ac
Grey Water
Grey Water
Grey Water
Grey Water
8"
PD25 PD24 PD23 PD22 PD21 PD20 8"
21 PD4 PD3 PD2 PD1
Pipe pipe inlet Pipe
Grey Soil Water
Pipe
Grey
Pipe
Grey
Pipe
Grey
Pipe
Grey
Pipe
Grey
1'-8"
20
1'-8"
inlet Pipe
Water
inlet Pipe
Water
inlet Pipe
Soil
Soil
Water
inlet Pipe
Water
inlet Pipe
Water
Soil
Soil
19
8" 8"
18
17
16
15
14
1'
13
5'-11"
DUMMY COLUMN
2'-4"
12
1'
11
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 2'-4" 2'-4" 1'-8" 1'-8" 1'-8" 2'-4"
10
4'
9
DUMMY COLUMN DUMMY COLUMN SHOP LINE DUMMY COLUMN SHOP LINE DUMMY COLUMN GLASS DOOR SHOP LINE DUMMY COLUMN GLASS DOOR SHOP LINE DUMMY COLUMN GLASS DOOR SHOP LINE DUMMY COLUMN GLASS DOOR
8
3'-3"
3'-3"
4'-3"
4'-3"
6'-3" 6'-3"
0.3m 6'-3" 0.3m 0.3m 0.3m
Retaining Retaining 1 1 Retaining Retaining
Retaining
Retaining
0.3m
0.3m
wall
wall
10'-3" 8'-2" wall 36' 8'-2" wall 120'-1" 8'-2" 8'-2" wall 25'-4"wall
064-000-106-AR-INT-1011
www.xdasho.com
Mtr
BY LAYOUT
9035111909
H I T E C T/S7204145483 Email - xdasho@outlook.com
M.O.S
BACK
BY
PLOT
H.T
ROAD
As LINE SIDE
specifications
work
other
perexecuted
for
work
the SIZE
which SIDE
provisions
except
as
they
fromby-are
-agreement.
24425
6.5
instruments
them,
of -shall
made
the 10
Mtr Mtr
SQ.FT
Copyright
of
beremain
service
executed
Act,
the
arecopyright
or
property
thenot
property
and
of
inare
the
allofnot
the
architect.
theto
drawings
architect
be used
Drawings
and
whether
on in
anythe
and
thes
TITLE
PREPARED
NO
CHECKED
PROJECT
GROUND
SHEET
SCALE FLOOR
"
10
L
C4
ICA VE
RT
VE SLEE MN
DIA R LU
TE CO
MM WA OF AIN
0 T DR VE
C121
10 EY
GR FRON DIA SLEE
IN MM R
0 TE
10 WA
BUA- 10
"
C4
C4
L
272 Sqft
ICA
RT VE
VE EE
SL LUMN
1'-
6" DIA R
4"
2'- CO
MM WATE OF AIN
55 0
C120
PD
10 EY T DR VE
GR FRON DIA SLEE
1'-4
IN MM R
0 TE
"
10 WA
BUA- "
C3
10
290 Sqft
L
ICA VE
RT
VE SLEE MN
1'-
DIA R LU
4"
TE CO
54 0
MM WA OF AIN
1'
PD 10 EY T DR VE
C119
GR FRON DIA SLEE
1'-4
IN 0 MM R
"
TE
53 10 WA
PD
4'-8
"
"
2'-6
BUA- 10
"
C4
287 Sqft 0
10 EY
DIA R
RT
TE CO
MM WA OF AIN
T
ICA VE
VE SLEE MN
LU
DR VE
L
BUA-C118
GR FRON DIA SLEE
IN 0 MM R
TE
10 WA
"
C3
10
292 Sqft
L
ICA
RT VE
VE SLEE MN
LU
C117
DIA R
CO
MM WATE OF AIN
1'-4
0 T
10 EY DR VE
"
52 GR FRON DIA SLEE
1'
PD IN 0 MM R
1'-4
TE
10 WA
"
51
PD
4'-
8"
BUA-
6"
2'-
"
10
287 Sqft
C2
16
15
17
14
13 18
12 AIN
11 DR VE
M EE
10 M MM DIA SL
9 19 MM R
12 =153 M 0 TE
8 = 10 WA
7 TH -18) 5M
ID
6 W ER(1 = 30
55 RIS EAD
AIN
TR "
C1'2El
4
DR
2' '-5
5'-9
2'
17
OT
3
1'
SL
6'-1
2
"
-01
ec
6'-11
t
"
1
aft
1"
&
Sh
Lv
SLAB
UP
Lv
7'-1
L
ICE
SERV
Sh
&
ICA VE
af ct
RT
1'
Ele
1"
VE SLEE MN
t -0
1'
DIA R LU
6"
1
2'
TE CO
MM WA OF AIN
0
3' 10 EY T DR VE
GR FRON DIA SLEE
6" IN 0 MM TER
6'-7
10 WA
UT
"
TO FT
CU R LI
FO "
10 8"
UT "
TO FT 6'-6
CU R LI
ICE
L
2'-5
SERVSLAB
ICA
C2
ICE
RT VE
SERVSLAB
FO VE SLEE MN
"
8" DIA R LU
2'-5
2'-5"
3'-6"
PL RE
CO
MM WATEOF AIN
FI
0
UM SH
" 10 EY T DR VE
"
6'-6
1'-3"
GR FRON DIA SLEE
BI AF
SLAB
8"
ICE
SERV
IN 0 MM R
NG T
1'-3
SERV
ct TE
ICE
1'-3"
"
Du 10 WA
5'-11
SLAB
&
ing
mb
"
7'-1
"
Plu 4'-10 6'-1"
8"
0"
"
6'-1 "
10
0"
C3
C116 0
10 EY
DIA R
RT
TE CO
MM WA OF AIN
T
ICA
VE SLEE MN
LU
DR VE
BUA-
IN 0 MM R
TE
10 WA
C3
"
C3
L
ICA VE
RT
VE SLEE MN
DIA R LU
TE CO
MM WA OF AIN
0 T
10 EY DR VE
GR FRON DIA SLEE
IN 0 MM R
TE
10 WA
1'-4
BUA-
"
50
PD
"
C114
1'-
"
C3
10
2'-6
10
"
n
lum d
647 Sqft
Co tate
Ro
L
C4
ICA
RT VE
VE SLEE MN
DIA R LU
TE CO
MM WA OF AIN
0
10 EY T DR VE
C2
GR FRON DIA SLEE
IN 0 MM R
TE
10 WA
BUA- "
C3
10
C3
L
ICA
RT VE
VE EE
SL LUMN
DIA R
MM TE CO
0 WA OF AIN
10 EY T DR VE
GR FRON DIA SLEE
BUA- IN MM R
0
10 WA
TE
1'-
4"
49
1'
PD
C112
1'-
4"
48
C3
"
576 Sqft PD 10
4'-8
123.07 SQ MT
C4
"
"
2'-6
L
ICA
RT VE
EE
CT101
VE
SL LUMN
C4
DIA R
6'
MM TE CO
0 WA T OF AIN
10 EY DR VE
GR FRON DIA SLEE
BUA- IN
0
MM R
10 WA
TE
C3
10
C2
C4
T1a
C3
BUA- C110
1'-
"
4"
57'-4
47
1'
PD
BUA- BUA-
1'-4
AIN
"
C3 46 DR VE
C3
PD
576 Sqft
DIA SLEE
C3
4'-8
MM R
"
0 TE
6" 10 WA
2'-
AIN
DR
OT
SL
7'-1
n
lum d K
tate OC OR
1"
Co
BL O
Ro
T FL E
C4 ILE ST AC
TO M 1 ERR R
C3
C2
O T O
FR TO FLO
C3
2'-
9"
45
PD
"
2'-5 1'
"
2'-5
10"
3'-8"
" 1'-5"
SLAB
3'-8
2'
ICE
PLURE
SERV
4'
ct
Du FI
10"
MB HA
ing
mb
10
Plu
IN FT
S
'-8
G
"
ICE
SLAB
SERV
11
&
10
12 "
C109
C2
5'-1
9
C2
8'-7"
ST OM OU ND
8 13
ST OM OO
FR GR IDLALA
C3
AI BA ND
FR H FL
7
TO M 1010 11
14
C4
AI GR R
RC SEMIDFL IN
6T
6
RC OU
AS ME OO
5 15
AS
E
E ND
CU NT R
16
4
CU TO
TO 2
ND
17
TO
3
IN
UT
99
C4
C4
GG
UT
8
2
12
1
13
1'
5
UP
14
4
15
4'-1"
1
3'-2"
3
16
-0
UP
ft
2
C2
17
2'-
Sha aft -01
6"
1
18
9'-6"
PD
SLAB
19
ICE
8'-7
20
ICE
44
&
C3
SERV
ct
ct Ele
Ele
"
"
10'-3 4"
1'-
BUA-
1'
CU RV
3'
SE
TO ICE
5'-1
UT LI
"
FO FT
2
1578 Sqft
R
C
C2
CU R LI
6'-7
FO
TO FT
"
UT
8"
6'-7
C4 2
"
C
CU R LI
FO
TO FT
2'-
4"
8"
6"
1'-
UT
PD 100 MM DIA VERTICAL
1'
43 GREY WATER SLEEVE
4"
1'-
PD IN FRONT OF COLUMN
6'-7
42 100 MM DIA DRAIN
C108
WATER SLEEVE
C4
8"
"
4'-
10
C2
"
2
C
BUA-
C4
AIN
DR
C5
OT
SL
1075 Sqft
"
6'-9 100 MM DIA DRAIN
WATER SLEEVE
C107 C2C
2'-2
"
C1
2'-
10"
11
"
C4
100 MM DIA DRAIN
3
WATER SLEEVE
C
100 MM DIA VERTICAL
GREY WATER SLEEVE
IN FRONT OF COLUMN
BUA-
C5
3
830 Sqft
C
100 MM DIA VERTICAL
C106
GREY WATER SLEEVE
2'-8
" IN FRONT OF COLUMN
2'-6 3'-
"
6"
100 MM DIA DRAIN
C6
"
10"
1'-4
PD
41 3'- WATER SLEEVE
7"
C4
1'
"
1'-4
PD
40
"
4'-8
C2
1'
BUA-
C5
C
100 MM DIA VERTICAL
GREY WATER SLEEVE
2'-8" IN FRONT OF COLUMN
3'-7
829 Sqft
10"
100 MM DIA DRAIN
WATER SLEEVE
"
PD
3'-6
C105 C6
39 "
C3
"
1'-4
C6
BUA-
C3
1'
100 MM DIA VERTICAL
GREY WATER SLEEVE
2'-7"
IN FRONT OF COLUMN
100 MM DIA DRAIN
3'-5 10"
WATER SLEEVE
"
806 Sqft
C104 C6
C5
100 MM DIA VERTICAL
C3
C1
GREY WATER SLEEVE
IN FRONT OF COLUMN
C6
C5
2'-3" 100 MM DIA DRAIN
WATER SLEEVE
3'-1 10"
"
BUA-
797 Sqft C6
19'-1"
2'-6"
DIA DRAIN
4' 100 MM
1'-4"
C6
BUA- C6
9"
1'-4"
10"
10"
'-
1020 Sqft 26
100 MM DIA VERTICAL
GREY WATER SLEEVE
IN FRONT OF COLUMN
R2
7'-
2'-10"
100 MM DIA DRAIN
WATER SLEEVE
2" A120
C102
2'-6"
3'-11"
BUA- BUA-
1'-4"
PD37
1'
4'-8"
2'-4"
100 MM DIA VERTICAL
GREY WATER SLEEVE
150 MM DIA VERTICAL
IN FRONT OF COLUMN
C6 C6 GREY WATER SLEEVE
8"
P18
1'-4"
IN FRONT OF COLUMN Pipe inlet Pipe pipe Pipe
Grey Water Soil Ac
BUA-
100 MM DIA DRAIN
WATER SLEEVE
67'-9"
2'-10"
14'-3"
A119 496 Sqft
C101BUA- 100 MM DIA DRAIN
WATER SLEEVE
10"
8"
2'-4"
1356 Sqft 150 MM DIA VERTICAL
GREY WATER SLEEVE
IN FRONT OF COLUMN
8"
14'-11"
2'-10"
100 MM DIA DRAIN
WATER SLEEVE
1'-8"
PD16
150 MM DIA VERTICAL 8"
GREY WATER SLEEVE
8 '' SLAB IN FRONT OF COLUMN
Pipe inlet Pipe
Grey Water
pipe
Soil
Pipe
Ac
EXTENSION
BUA-
A117
FOR CORNICE
10'-9"
13'
498 Sqft
8"
100 MM DIA DRAIN
WATER SLEEVE
10" 32'-3"
2'-4"
150 MM DIA VERTICAL
8"
GREY WATER SLEEVE
IN FRONT OF COLUMN
BUA-
14'-2"
A116 500 Sqft
35'-9" 2'-6"
inlet Pipe Pipe Pipe pipe
Water Grey Ac Soil
100 MM DIA DRAIN 8"
WATER SLEEVE
11'-11" PD15
1'-8"
150 MM DIA VERTICAL
GREY WATER SLEEVE 8"
PD14
IN FRONT OF COLUMN
1'-11"
BUA-
Grey Ac Soil Water
Pipe Pipe pipe inlet Pipe
10'-10"
A115
13'-3"
3'-6"
476 Sqft
8"
100 MM DIA DRAIN
WATER SLEEVE
32'-6"
10"
2'-4"
150 MM DIA VERTICAL
GREY WATER SLEEVE
BUA-
8"
IN FRONT OF COLUMN
A114
7'-2"
11'-6"
8"
33'-3" PD13
1'-4"
100 MM DIA DRAIN
1'-4" 1'-4"1'-4"
PD13
WATER SLEEVE
7'
10"
2'-4"
BUA- 8'-3"
A113
13'-5"
503 Sqft
100 MM DIA DRAIN
8"
32'-3"
WATER SLEEVE
2'-4"
11
" A112 533 Sqft
130'-7"
8 '' SLAB
EXTENSION
8"
'
R6
100 MM DIA DRAIN
WATER SLEEVE
10"
2'-4"
Grey
Pipe 2'-6"
Ac
Pipe
Soil Water
pipe inlet Pipe
8"
16'-4"
BUA-
IN FRONT OF COLUMN 10"
1'-8"
6"
B117
1'-4"
IN FRONT OF COLUMN
AT101 b
Grey Ac Soil Water
Pipe Pipe pipe inlet Pipe
A111 BUA-
13'-11"
11'-6"
14'-10" BUA-
SHOP LINE
3'-10"
533 Sqft
4'
177Sqft
Ac Grey Water Soil
2'-6"
Pipe Pipe inlet Pipe pipe
8"
100 MM DIA DRAIN
1'-4" 6" 1'-4"
PD35 8"
WATER SLEEVE 100 MM DIA DRAIN
13'-10"
10"
2'-4"
PD34
WATER SLEEVE
32'-3"
2'-4"
Ac
2'-6"
Grey Water Soil
IN FRONT OF COLUMN
2'-1"
Pipe Pipe inlet Pipe pipe
B116
IN FRONT OF COLUMN 8"
13'-4"
A110 BUA
15'-7"
279'-1"
15'-3"
5"
470 Sqft
SD
3'2" X 5'7"
CUBICAL
3' SLOPE
1'-3"
2'
176 Sqft
6"
1'-1"
LEDGE
WALL
5"
Tile Drop
PD9
FEMALE TOILET
10"
1'-8"
3'2" X 4'11"
8"
10'2" X 15'4"
CUBICAL
Ac
2'-6"
3'-6"
PD33 PD32
Grey Water
AT101 a
Tile Drop
10"
2'-4"
SLOPE
IN FRONT OF COLUMN
Soil
Soil
IN FRONT OF COLUMN
A109
10'-1"
13'
MID
12mm
Tile Drop
15'-1"
162 Sqft
16
17
14
18
19
20
15
1219 MM
7'-10"
10'7"
MALE=TOILET
= X175
11
4'3" X 4'8"
CUBICAL
SLOPE
10
12mm Tile
WIDTH
12mm
WATER SLEEVE
RISER
Drop
Tile Drop
10" MID
2'
9
16'
CUBICAL
LANDING
4'5" X 3'11"
1'
150 MM DIA VERTICAL
8
2'-6"
Pipe pipe
GREY WATER SLEEVE 4' 1' 1' 1' 1' 1' 1' 1' 1' 4' 10
Tile Drop
5
7
12mm
MID MID
10"
6'-6"
100 MM DIA DRAIN IN FRONT OF COLUMN
14'
8" 11
MID
LANDING LANDING
1'-4" 6" 1'-4"
SERVICE SLAB
PD31 WATER SLEEVE 4' 4'
5"
4'-9"
SERVICE
SLOPE
2MX2M 2MX2M 8 12
4'5" X 4'8"
10"
CUBICAL
1'-8"
1'-3"
8
2'
SLOPE
17 LIFT
SLOPE
8'
8' 17
10'-5"
3'-7" 4" 4
11" 6 19 11" 6 14
7'
BUA-
Ac
2'-6"
Grey Water Soil
· = 4 FEET
Pipe Pipe inlet Pipe pipe
11" 3 5 18
20 11" 15
RISER(1-18)=153MM
· RISER(1-26) = 6 INCH 5
Tile Drop
B114 B113
7'-11"
12mm
· TREAD(1-6) = 11 INCH
B112
4 TREAD· = 305MM
SHOP LINE
11" 21 11"
2 TREAD(9-16) = 1 FEET 4 16
5'-6" · TREAD(19-25) = 11 INCH
SLAB 11" 3 6'-5" 22 11"
SERVICE UP 1 3 17
MPD2 11" 2 23 11"
SLAB LINE
2 18 11"
14'-8"
7'
11" 1 24 11"
4'-8"
2'-5"
1 7'4"
19X 16'0"
SERVICE LIFT
25 11"
3MX2M 20
UP 6" 1'-8" 6" 1'-8"
4'-7"
5" 6"
Soil Pipe Grey
6"
1'-3"
SLOPE
MPD1
SD
SLOT DRAIN
5"
SD
1'-10" 12mm
Tile Drop
1'-6"
8"
WATER SLEEVE
100 MM DIA DRAIN
WATER SLEEVE
8"
8"
8"
8"
8"
8"
7'-3"
8"
8"
8"
8"
8"
10"
2'-4" 2'-4" 2'-4" 2'-4" 2'-4"
150 MM DIA VERTICAL
GREY WATER SLEEVE
SHOP LINE SHOP LINE GLASS DOOR SHOP LINE DUMMY COLUMN IN FRONT OF COLUMN
4'-3"
UP
8"
8"
8"
8"
8"
WATER SLEEVE
10"
2'-7"
2'-4"
A107
8"
8"
BUA
10'-4"
28'-1"
SLOT DRAIN
16'
11'-8"
679 Sqft
A108
12'-10"
8"
inlet Pipe Pipe Pipe pipe
5'-6"
Water Grey Ac Soil
WATER SLEEVE
1'-4" 6" 1'-4"
BUA
Soil Ac Grey Water
pipe Pipe Pipe inlet Pipe
3'-6"
6'-6"
1'-4"
Pipe
Grey
2'-6"
BUA
15'-9"
4'-6"
480 Sqft
UP WATER SLEEVE
15'-8"
WIDTH = 1390MM
13'-4"
10"
1
13'
RISER=153MM
A106
150 MM DIA VERTICAL 1'-4" 6" 1'-4"
BUA-
TREAD = 305MM 2
BUA- BUA-
GREY WATER SLEEVE
BUA-
2'-6"
PD7 PD6
1'
668 Sqft
18 4 LIFT PIT-1.8M
7'
11"
FHC
DEPTH
1'-5" 2'-6"
SERVICE
DEPTH
4'-2"
SLAB
142'-10"
17 5
1'-5"
12'-11"
16 6
34'-5"
34'-5"
34'-5"
34'-5"
8"
14 8 100 MM DIA DRAIN
16'-7"
SERVICE CORRIDOR WATER SLEEVE
2'-6"
13 9
Pressurization Plumbing Duct Elect & Lv Shaft -01
10"
11'-10"
2'
Duct
12 11 10
8"
10"
SERVICE SLAB
10" 1' 5'-8"
SERVICE SLAB
1' 150 MM DIA VERTICAL
GREY WATER SLEEVE 8" 1'-1" 50'-10"
2'-3"
2'-3"
2'
3'-3"
IN FRONT OF COLUMN
3'-3"
2'
1'-3"
3'-8" 8"
4'
WATER SLEEVE
10"
26'-1"
A105
2'
Ac
150 MM DIA VERTICAL
Pipe
1'-2"
1'-4"
18'-3"
16'-2"
BUA
11'-11"
12'-11"
PD5
1'-3"
1'-3"
1'-3"
1'-3"
3'-7"
BUA-
SHOP LINE