PR 4
PR 4
PR 4
JAN FEB
1.30
70.00 0.91 0.18 0.73
25.10
30.00 7.53 0.38 0.75
8.50 8.50
Plan
Actual
Comn Plan
Column Actual
0.65 3.26 3.91 5.21 5.86 7.16 7.16 7.81 6.51 4.88
2.5 6.2 7.2 8.5 8.7 10.1 9.8 9.9 8.3 4.9
8.2 14.4 21.6 30.1 38.7 48.9 58.7 68.6 76.9 81.7
0 0 0 0 0 0 0 0 0 0
PROGRESS
PRIL MAY JUNY
100%
75%
50%
3.91 3.91 1.30 0.7
25%
1.28 1.70 2.13 1.70 1.70
0%
TOTAL
3.9 3.9 2.6 2.4 2.1 1.7 1.7 C0MM.
85.6 89.5 92.1 94.5 96.6 98.3 100.0 TOTAL
C0MM.
0 0 0 0 0 0 0
SPK TOTAL
Weigh
INDEX INDEX JAN
t (Ton)
(%) (%) 6 13 20
- - - -
1.30
70.00 0.91 0.18 0.73
25.10
30.00 7.53
70.00 17.57
- -
8.50 8.50
- -
- -
- 0.2 1.2
100.00 ###
- 0.2 1.4
- -
2020
AN Feb MARCH
27 3 10 17 24 2 9 16 23 30
0.08
0.10
- - - - -
- - - - - - - -
0.65 1.95 0.65 3.26 3.91 5.21 5.86 7.16 7.16 7.81
1.2 3.1 2.5 6.2 7.2 8.5 8.7 10.1 9.8 9.9
2.7 5.7 8.2 14.4 21.6 30.1 38.7 48.9 58.7 68.6
- - - - - - - - - -
2020
APRIL MEY JUNY
6 13 20 27 4 11 18 25 1 8
1.76
- - - - - - - - -
PROGR
JUNY
ESS
15 22
100%
75%
50%
25%
0%
TOTAL
COMM.
TOTAL
COMM.
SPK INDEX% TOTAL INDEX% WEIGHT (TON)
JAN FEB
1.30
70.00 0.91 0.18 0.73
25.10
30.00 7.53 0.38 0.75
8.50 8.50
PLAN ACTUAL
0.65 3.26 3.91 5.21 5.86 7.16 7.16 7.81 6.51 4.88
2.5 6.2 7.2 8.5 8.7 10.1 9.8 9.9 8.3 4.9
8.2 14.4 21.6 30.1 38.7 48.9 58.7 68.6 76.9 81.7
0 0 0 0 0 0 0 0 0 0
PRIL MAY JUNY
0 0 0 0 0 0 0
PROGRESS
100%
75%
50%
25%
0%
TOTAL
C0MM.
TOTAL
C0MM.
DOC.NO :
BBI DOC.NO : 180/2621/001/12.2019
PO NO : CONFIRMASI ORDER NO.160/DIR.01/PSP/XII/2019
DATE OF ISSUE : 31-Dec-19
ORDER NO. : 19.116.1
CUSTOMER
PT.PUSPETINDO
1 GA DRAWING
5 CONSUMABLE 5.50
5.1 PURCHASE 30.00
5 FABRICATION 32.80
6 TESTING 7.20
8 PACKING 0.90
MEDI
2019
TOTAL INDEX (%) WEIGHT (TON) DES JAN FEB
15 30 15 28 15 30
32.80
7.20
3.10
0.90
100
PLAN 0.0 1.8 3.0 5.1
COMM. PLAN 0.0 0.0 1.8 4.8 9.8
ACTUAL
COMM. ACTUAL 0 0 0 0 0
MASTER SCHEDULE "S" CERVE
FABRICATION
MEDIUM PRESSURE VESSEL
PLAN
COMM. ACTUAL
ACTUAL
COMM. PLAN
5.29 4.54
0.49 0.33
7.9 8.4 8.7 9.0 8.2 7.5 7.0 6.6 4.9 3.9
17.7 26.1 34.8 43.82 52.0 59.5 66.5 73.0 78.0 81.9
0 0 0 0 0 0 0 0 0 0
AGUSTUS SEP OCT NOP
PROGRESS
15 30 15 30 15 30 15 30
100%
75%
50%