Vo O13 Rectification Method O11&b47 Villas
Vo O13 Rectification Method O11&b47 Villas
Vo O13 Rectification Method O11&b47 Villas
PRICE INCREASE / DECREASE Original Contract sum (w/o PPN 10%) Original Contract sum (w/o PPN 10%)
Current contract sum Current contract sum
LAST CONTRACT SUM : Rp. Variance to original contract: Rp. Variance to original contract: Rp.
Quotation by: (Contractor)
Approved by : Rec. Approved Checked by: Submitted by
PT. LOMBOK TOROK
PT. LOMBOK TOROK DEVELOPMENTS PT. LOMBOK TOROK DEVELOPMENTS PT. TUNAS JAYA SANUR
DEVELOPMENTS
a.n
LOCATION : SAMARA BAY - DUSUN TOROK AIK BELEK, DESA MONTONG AJAN, KECAMATAN PERAYA BARAT DAYA, KABUPATEN LOMBOK TENGAH - NTB
013/VO-TJS/SBV/IV/2023
ADDITIONAL WORK
1 Rectification Method Villa B47
Compaction Soil 1.33 m2 46,400.00 61,538 1.33 m2 46,400.00 61,538
Stone Masonry 2.35 m3 1,121,800.00 2,641,418 2.35 m3 1,121,800.00 2,641,418
Concrete Fill 1.99 m3 1,701,700.00 3,394,381 1.99 m3 1,701,700.00 3,394,381
a.n
Jay Mac Donald Nivethitha Velu Sahrul Ramdan Teguh Prasetia Lalu Suharta
Head of Project Project Manager Construction Manager Quantity Surveyor Project Manager
PROJECT : SAMARA BAY VILLA
LOCATION : SAMARA BAY - DUSUN TOROK AIK BELEK, DESA MONTONG AJAN, KECAMATAN PERAYA BARAT DAYA, KABUPATEN LOMBOK T
AREA : PLOT O11 & B47
Horizontal
TOTAL 1.33 m2
+- PANJANG PERHITUNGAN PENGURANG
Panjang AKIBAT G. VOLUME
QTY
NO URAIAN SKET/GAMBAR GRID AS-AS OVERLAP Panjang Tinggi Tinggi Rata- TOTAL KETERANGAN
Lebar Volume Item Panjangan Lebar QTY Volume
PONDS. Efektif Rata-Rata Rata
Efektif
(bh) (m) (m) (m) (m) (m) (m3) (m) (m) (m) (m3) (m3)
TOTAL 1.99 m3
+- PANJANG PERHITUNGAN PENGURANG
Panjang AKIBAT G. VOLUME
QTY
NO URAIAN SKET/GAMBAR GRID AS-AS OVERLAP Panjang Tinggi Tinggi Rata- TOTAL KETERANGAN
Lebar Volume Item Panjangan Lebar QTY Volume
PONDS. Efektif Rata-Rata Rata
Efektif
(bh) (m) (m) (m) (m) (m) (m3) (m) (m) (m) (m3) (m3)
Horizontal
TOTAL 2.35 m3
BACK UP VOLUME
VILLA O11
+- PANJANG
PERHITUNGAN PENGURANG
PANJANG AKIBAT G. VOLUME
QTY
AS-AS OVERLAP Panjang Tinggi Rata- Tinggi TOTAL
NO URAIAN SKET/GAMBAR GRID Lebar Volume Item Panjang Lebar Jumlah Volume KETERANGAN
PONDS. Efektif rata Rata-rata
(bh) (m) (m) (m) (m) (m) (m3) (m) (m) (m) (m3) (m3)
Horizontal
Type B
Vertical 2.00 1.00 1.00 0.60 - 0.60 1.20
TOTAL 4.93 m2
+- PANJANG
PERHITUNGAN PENGURANG
PANJANG AKIBAT G. VOLUME
QTY
AS-AS OVERLAP Panjang Tinggi Rata- Tinggi TOTAL
NO URAIAN SKET/GAMBAR GRID Lebar Volume Item Panjang Lebar Jumlah Volume KETERANGAN
PONDS. Efektif rata Rata-rata
(bh) (m) (m) (m) (m) (m) (m3) (m) (m) (m) (m3) (m3)
Horizontal
Type B
Vertical
2.00 0.55 0.55 0.45 1.10 0.27 0.54
Horizontal
TOTAL 3.47 m3
Type B
Vertical 2.00 0.40 0.40 0.40 1.10 0.09 0.18
Horizontal 1.00 2.92 (0.60) 2.32 0.22 1.10 0.28 FP 1.00 0.20 0.10 2.00 0.04 0.24
TOTAL 0.88 m3