7 7

1100
FFL +0

HANG UP THE HANG UP THE 21 20 22 15


ROOF PURLINS ROOF PURLINS

HANG UP THE
280 190 160 170
HANG UP THE
ROOF PURLINS
ROOF PURLINS M10 M10
CT 150x75

13 14

CT 200x75
M8 M8
6 CL 300x100 CL 400x100 6
50 50

L50x50x5
L50x50x5 L50x50x5 L50x50x5
FFL -600
190 30
240 30 340 30 440 30 FFL -700
250
300 400 500

EE-SP 150x75 EE-SP 200


SCALE 1:5 SCALE 1:5 EE-SP 300 EE-SP 400
SCALE 1:10 SCALE 1:10

DETAIL OF CABLE TRAY 150 - 200 DETAIL OF CABLE TRAY 300 - 400 DETAIL OF CABLE LADDER IN CABLE TRENCH - 400
5 5

THIS'S DESIGN DRAWING, THE CONTRACTOR MUST BE CHECKED AT SITE TO MAKE


CONSTRUCTION DRAWING.
HANG UP THE 1500
ROOF PURLINS
HANG UP THE ROOF PURLINS 210 11
FFL+6300
LENGHT OF ROD
CT300x100
WILL BE DECIDED AT SITE
M10

M10 4
10 09 08 07
00 16-SEP-'16 H.N.THUAN
4 130 230 230 230
H.C
FFL+5650 REV DATE DRAW BY MODIFICATIONS
CL 600x100 CL 800x100
50 50

L80x80x5 L80x80x5
03 02 05 06 SANTOMAS BAC NINH FACTORY
640 30 840 30 04
FFL+5000 PLOT No. 106B/113A VSIP BAC NINH INDUSTRIAL PARK, BAC NINH PROVINCE, VIETNAM
700 900

EE-SP 600 EE-SP 800 APPROVED BY


SCALE 1:10 SCALE 1:10

1100 3

DETAIL OF CABLE TRAY 600 DETAIL OF CABLE TRAY 800 FFL+0 GENERAL DIRECTOR

STEEL COLUMN
2000
400 500

RAD 1400x650
DESIGN MANAGER
SECTION PR-02
SCALE 1:20

175
FFL+6750
02- Fire fighting water supply DN80-CS-ASTM A53(Gr.B)-Schedule 20, Load: 12 kg/m
100 2
FFL+6950 CL800x100 03 - Compressed air supply DN80-CS-ASTM A53(Gr.B)-Schedule 20, Load: 16 kg/m D:\1.PROJECT\2016\3.
2 STIFF PLATE 75 100 SANTOMAS\2.INPROGRESS\1.EE\2.BASIC\2.DRAWING\2.1.CAD
10mm 04 - Domestic water supply DN40-GI-ASTM A53(Gr.B)-Schedule 20, Load: 5 kg/m
FFL+6300 16-SEP-2016
CL400x100 CTK200x100 Ninh thuan
STEEL BRACING 05 - Fire fighting water supply DN65-CS-ASTM A53(Gr.B)-Schedule 20, Load: 12 kg/m
06 - Fire fighting water supply DN200-CS-ASTM A53(Gr.B)-Schedule 10, Load: 55 kg/m
925 FFL+6450
07 - Cooling water supply DN150-CS-ASTM A53(Gr.B)-Schedule 10, Load: 55 kg/m
FFL+5850
08 - Cooling water return DN150-CS-ASTM A53(Gr.B)-Schedule 10, Load: 55 kg/m
09 - Cooling water supply DN150-CS-ASTM A53(Gr.B)-Schedule 10, Load: 55 kg/m
1300
FFL+5500 10 - Cooling water return DN150-CS-ASTM A53(Gr.B)-Schedule 10, Load: 55 kg/m
CEILING
11 - EE cable tray 400x100, Load: 50 kg/m
12 - ELV cable tray 200x100, Load: 25 kg/m
STEEL COLUMN
ELECTRICAL SYSTEM
1 GE-SP-01
GE-SP-05A
1 SCALE 1:20
SCALE 1:20
I 1

TYPICAL ELECTRICAL DETAIL INSTALLATION


DETAIL OF CABLE LADDER 400 AND TRUNKING 200 DETAIL OF CABLE LADDER 800 DETAIL OF CABLE TRAY 300 - PART 4

REV. :
EE-603 00 16-SEP-2016 NTS