Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Augustine Ukpong Document

Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

RESUME

UKPONG AUGUSTINE JOHN


Phone: 08033693650, 09054906121
Email: augustineukpong42@gmail.com

OBJECTIVES:
A SAFE RIGGING OPERATIONS
I’m a goal oriented person with vast skills in the Oil and Gas sector. I work towards the
actualization of company laid down policies, rules and regulations as concerns Rigging
Operations. I have supervised and accomplished a lot of projects without LTI. I am still
aspiring further to acquire more knowledge in the field. I believe that my key qualities will
maintain me to a high level.

As a Rigger over the years working in a team with other specialist, the ability to encourage
other people’s ideas is important and I must also be flexible and able to compromise. I make
use of my strong communication skill to write reports and to explain complex Rigging
Operations activities to people from non-technical backgrounds.
PERSONAL DATA
Updated CV : 15th December, 2023
Date of Birth: 30th October, 1980
Sex: Male
Marital Status: Married
State of Origin: Akwa Ibom
Local Govt. Area: Ikot Abasi
Nationality: Nigerian
SKILLS AND TASK
 U-see-U-Act Reporting (identification of Hazards)
 Planning and Scheduling Men and Materials
 Job Safety Analysis Preparation/Toolbox meeting before Task
 Permit to work system preparation, Risk Assessment Team
 Working at Height Training
 Fall Arrest Equipment Inspection
EDUCATION AND QUALIFICATION WITH DATE:
 First School Leaving Certificate (FSLC) 1990
 Senior Secondary School Certificate (NECO) 2001
 University of Uyo, B.Sc. (Decree) Geography
 Religion Planning (Awaiting Result) 2005
WORK EXPERIENCE:

Company: Wilkris Nig. Limited


Client: Total E & P Upstream Nig.
Vessel: Oshonmi
Project: Shut-Down Projects and FRP (Flair Reduction Project)
at Edikan – Imeh and Afia Platform
Position: Rigger
Period: May – November

RESPONSIBILITY
 Prepare lift plan
 Daily inspection of cranes and lifting equipment
 Deliver tool box talks
 Inspected lifting gears and accessories
 Ensure safety compliances
 Removal and Installation of flair panel and different type of valves and spools

Company: Dormalong Engineering Ltd


Client: Shell Nig. Plc
Vessel: Temis Vessel
Project: Turn around maintenance (TAM 2022) Bong F PSO
Position: Rigger
Period: 18TH Sept. – 14th Nov. 2022

RESPONSIBILITY
 Removal and installation of 18 inches export crude lines spools
 Removal and installation of 18 inches valves.
 Rigging and installation of 24 inches blind flanges.
 Installation of corrosion probes
 Rigging of water mist.
 Rigging and installation of deconstructed water flood pipes.
 Removal and installation of 3 inches flare line spools.
 Installation of 43 inches – 50V-010 Chemical bunkering pading of real of calcium
nitrate
 Installation of 4 inches-50V-012 actuator leaking hydraulic on X-5303 corrosion
inhibitor loading reel on X-5303 corrosion inhibitor loading real.
 Rigging and installation of connection sump tank and submersible pumps.
 Rigging and installation of 2 inches water injection lines
 Removal and installation of water heater on turbines.
 Gigging and installation doubling spenser
Company: CAMEL’S NIG. LTD
Client: Agip Nig Ltd
Project: OBOB (Turn-Around Maintenance)
Position: Rigger
Period: April – May, 2022

RESPONSIBILITY
 Prepare lift plan
 Daily inspection of cranes and lifting equipment
 Deliver tool box talks
 Inspected lifting gears and accessories
 Ensure safety compliances
 Assisting cutting and preparation of pipe for pipe fitters
 Removal and restoration of different bulk valve and flange

Company: IOSS (Integrated Oil Servicing Service)


Client: Total E & P Upstream Nig.
Project: OFON Phase 2 project (Turn-Around Maintenance)
Position: Rigger
Period: November – December 2021

RESPONSIBILITY
 Prepare lift plan
 Daily inspection of cranes and lifting equipment
 Deliver tool box talks
 Inspected lifting gears and accessories
 Ensure safety compliances
 Removal and Installation of flair panel and different type of valves and spools

Company: DBN
Client: Total E & P Upstream Nig.
Project: AMENAM PROJECT (AMQ)
Position: Rigger
Period: May 2021 – August, 2021
A safe lifting and restoration of boat landing (P-1, P-2 & D-3)

RESPONSIBILITY
 Maintained company safety standard and policies throughout the projects.
 Ensured good housekeeping standards.
 Performed other assigned jobs.
 Preparations and Verification of Divers basket materials/tools for subsea operations
in finishing activities.
 Prepared rigging accessories and assisted Rope Access Technicians in the installation
and removing of accessories for the Umbilical Flow and Riser

Company: DBN
Client: Total E & P Upstream Nig.
Project: Egina FPSO Hookup
Position: Rigger
Period: August 2018 – January, 2019
Installation of beam and gas line including flange and risers

RESPONSIBILITY
 Prepare lift plan
 Daily inspection of cranes and lifting equipment
 Deliver tool box talks
 Inspected lifting gears and accessories
 Ensure safety compliances
 Setting up of hydra-tight equipment for the tightening of bolts and nuts.
 Also ensure safety QC and AC compliance on the erecting prepare rigging

Company: DBN
Client: Total E & P Upstream Nig.
Project: Ofon 2 of P2, Hook-up offshore
Position: Rigger
Period: April 29 – Oct 18th 2014
A safe lifting operation/hookup project

RESPONSIBILITY
 Prepare lift plan
 Daily inspection of cranes and lifting equipment
 Deliver tool box talks
 Inspected lifting gears and accessories
 Ensure safety compliances
 Setting up of hydra-tight equipment for the tightening of bolts and nuts.
 Also ensure safety QC and AC compliance on the erecting prepare rigging

Company: Alcon Nig. Ltd


Client: Shell Nig. Ltd
Project: Construction of Afam AGG Gas project
Position: Rigger
Period: 1999 – 2001
A safe lifting operation/ installation of beams and pipe rack
RESPONSIBILITY
 Prepare lift plan
 Daily inspection of cranes and lifting equipment
 Deliver tool box talks
 Inspected lifting gears and accessories
 Ensure safety compliances
 Setting up of hydra-tight equipment for the tightening of bolts and nuts.
 Also ensure safety QC and AC compliance on the erecting prepare rigging

Company: Baker/OTS
Client: NLNG Nig. Ltd
Project: Construction of Gas Plant
Position: Rigger
Period: 2012 – 2013
A safe lifting operation and installation of pipe (Trane 7)

RESPONSIBILITY
 Prepare lift plan
 Daily inspection of cranes and lifting equipment
 Deliver tool box talks
 Inspected lifting gears and accessories
 Ensure safety compliances
 Setting up of hydra-tight equipment for the tightening of bolts and nuts.
 Also ensure safety QC and AC compliance on the erecting prepare rigging

Company: Sudelettra Nig. Ltd


Client: Shevron Nig. Ltd
Project: Installation of different type of valve
Position: Rigger
Period: July – Oct 2011
RESPONSIBILITY
 Conducting toolbox meeting before task commence
 Pre Job talk, working at height, ensure good communication
 Incident and injury free
 Ensure effective project closeout & helped my companies to achieve task on target time

COURSE ATTEND WITH CERTIFICATION


1. Opeans Safety Training Centre
 Further Offshore Emergency Training Set by – Nigerian Upstream Petroleum
Regulation Commission Training Requirement.
 Basic Offshore Safety Induction & Emergency Training including EBS (OPITO
Approved course Code, 5700)
 With EBS, Sea Survival, Fire Fighting & Self Rescue, First Aid & Hypothermia
 International Association of Safety Professional Rigging Course (Energy Ray
Company)
 Rigging Training Course (accredited by international association of Drilling
contractors) (Energy Ray integrated Services/00187177)
 International Association of Safety Professional (Basic Rigging course) IASP
 IADC Crane – Rigging training Accreditation Program.
 CSER – Confined Space Entry and Rescue Training Center by (DPR)
ONL/CSER/18

2. Working at height and confined space Training


HOBBIES:
Travelling & Football

REFEREE
Mr. Rama
Project supervisor, Sudulatra Nig. Ltd., Port Harcourt
0708753910
Pst. Eno Ukpong
Senior Pastor
New Testament Church
08130401695
Mr. Tayo
Project Co-ordinatorOfon Phase II
DBN Offshore
08037269359

Mrs. Emeka Obiosu


(CSR Shell Rep)
08036676585
AUGUSTINE UKPONG

Basic Rigger Non-Mechanical

ENERGYRAY INTEGRATED SERVICES LIMITED 00187177

10 August 2021 +2348175555552

10 August 2025

Kelvin Onujeoghene Onuweri

XXX000244332

You might also like