Augustine Ukpong Document
Augustine Ukpong Document
Augustine Ukpong Document
OBJECTIVES:
A SAFE RIGGING OPERATIONS
I’m a goal oriented person with vast skills in the Oil and Gas sector. I work towards the
actualization of company laid down policies, rules and regulations as concerns Rigging
Operations. I have supervised and accomplished a lot of projects without LTI. I am still
aspiring further to acquire more knowledge in the field. I believe that my key qualities will
maintain me to a high level.
As a Rigger over the years working in a team with other specialist, the ability to encourage
other people’s ideas is important and I must also be flexible and able to compromise. I make
use of my strong communication skill to write reports and to explain complex Rigging
Operations activities to people from non-technical backgrounds.
PERSONAL DATA
Updated CV : 15th December, 2023
Date of Birth: 30th October, 1980
Sex: Male
Marital Status: Married
State of Origin: Akwa Ibom
Local Govt. Area: Ikot Abasi
Nationality: Nigerian
SKILLS AND TASK
U-see-U-Act Reporting (identification of Hazards)
Planning and Scheduling Men and Materials
Job Safety Analysis Preparation/Toolbox meeting before Task
Permit to work system preparation, Risk Assessment Team
Working at Height Training
Fall Arrest Equipment Inspection
EDUCATION AND QUALIFICATION WITH DATE:
First School Leaving Certificate (FSLC) 1990
Senior Secondary School Certificate (NECO) 2001
University of Uyo, B.Sc. (Decree) Geography
Religion Planning (Awaiting Result) 2005
WORK EXPERIENCE:
RESPONSIBILITY
Prepare lift plan
Daily inspection of cranes and lifting equipment
Deliver tool box talks
Inspected lifting gears and accessories
Ensure safety compliances
Removal and Installation of flair panel and different type of valves and spools
RESPONSIBILITY
Removal and installation of 18 inches export crude lines spools
Removal and installation of 18 inches valves.
Rigging and installation of 24 inches blind flanges.
Installation of corrosion probes
Rigging of water mist.
Rigging and installation of deconstructed water flood pipes.
Removal and installation of 3 inches flare line spools.
Installation of 43 inches – 50V-010 Chemical bunkering pading of real of calcium
nitrate
Installation of 4 inches-50V-012 actuator leaking hydraulic on X-5303 corrosion
inhibitor loading reel on X-5303 corrosion inhibitor loading real.
Rigging and installation of connection sump tank and submersible pumps.
Rigging and installation of 2 inches water injection lines
Removal and installation of water heater on turbines.
Gigging and installation doubling spenser
Company: CAMEL’S NIG. LTD
Client: Agip Nig Ltd
Project: OBOB (Turn-Around Maintenance)
Position: Rigger
Period: April – May, 2022
RESPONSIBILITY
Prepare lift plan
Daily inspection of cranes and lifting equipment
Deliver tool box talks
Inspected lifting gears and accessories
Ensure safety compliances
Assisting cutting and preparation of pipe for pipe fitters
Removal and restoration of different bulk valve and flange
RESPONSIBILITY
Prepare lift plan
Daily inspection of cranes and lifting equipment
Deliver tool box talks
Inspected lifting gears and accessories
Ensure safety compliances
Removal and Installation of flair panel and different type of valves and spools
Company: DBN
Client: Total E & P Upstream Nig.
Project: AMENAM PROJECT (AMQ)
Position: Rigger
Period: May 2021 – August, 2021
A safe lifting and restoration of boat landing (P-1, P-2 & D-3)
RESPONSIBILITY
Maintained company safety standard and policies throughout the projects.
Ensured good housekeeping standards.
Performed other assigned jobs.
Preparations and Verification of Divers basket materials/tools for subsea operations
in finishing activities.
Prepared rigging accessories and assisted Rope Access Technicians in the installation
and removing of accessories for the Umbilical Flow and Riser
Company: DBN
Client: Total E & P Upstream Nig.
Project: Egina FPSO Hookup
Position: Rigger
Period: August 2018 – January, 2019
Installation of beam and gas line including flange and risers
RESPONSIBILITY
Prepare lift plan
Daily inspection of cranes and lifting equipment
Deliver tool box talks
Inspected lifting gears and accessories
Ensure safety compliances
Setting up of hydra-tight equipment for the tightening of bolts and nuts.
Also ensure safety QC and AC compliance on the erecting prepare rigging
Company: DBN
Client: Total E & P Upstream Nig.
Project: Ofon 2 of P2, Hook-up offshore
Position: Rigger
Period: April 29 – Oct 18th 2014
A safe lifting operation/hookup project
RESPONSIBILITY
Prepare lift plan
Daily inspection of cranes and lifting equipment
Deliver tool box talks
Inspected lifting gears and accessories
Ensure safety compliances
Setting up of hydra-tight equipment for the tightening of bolts and nuts.
Also ensure safety QC and AC compliance on the erecting prepare rigging
Company: Baker/OTS
Client: NLNG Nig. Ltd
Project: Construction of Gas Plant
Position: Rigger
Period: 2012 – 2013
A safe lifting operation and installation of pipe (Trane 7)
RESPONSIBILITY
Prepare lift plan
Daily inspection of cranes and lifting equipment
Deliver tool box talks
Inspected lifting gears and accessories
Ensure safety compliances
Setting up of hydra-tight equipment for the tightening of bolts and nuts.
Also ensure safety QC and AC compliance on the erecting prepare rigging
REFEREE
Mr. Rama
Project supervisor, Sudulatra Nig. Ltd., Port Harcourt
0708753910
Pst. Eno Ukpong
Senior Pastor
New Testament Church
08130401695
Mr. Tayo
Project Co-ordinatorOfon Phase II
DBN Offshore
08037269359
10 August 2025
XXX000244332