Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Curriculum Vitae: ULL AME

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 13

CURRICULUM

VITAE
FULL NAME Leraryson Linggir anak Libu

DATE OF BIRTH 3 January 1975

NATIONALITY Malaysian

DOMICILE (TOWN, COUNTRY) Kuching, Sarawak


EDUCATION Year 1998 ~ 2001: Institute of Technical Education
Singapore
(ITE) National Technical Certificate- 3
(NTC-3 General Welding) Cert. No: R007189
# Theory – Pass
Institute of Technical Education Singapore (ITE)
National Technical Certificate- 2
(NTC-2 Welding) Cert. No: F021344
PROFESSION QC Inspector

FOREIGN LANGUAGES English and Malay

CERTIFICATIONS
 Attend of 3.0 CSWIP Visual Welding Inspector course TWI Kuala Lumpur started on
28th~ 30th July.
 Visual Welding Inspector: CSWIP 3.0, Cert. No: 11312
 Completed Training Seminar on Introduction To Surface Wellhead (NT2) and Mud Line
(MLC) System in GE Vetcogray Singapore Oil & Gas Drilling and Production Systems
 Singapore Oil & Gas Drilling and Production Systems Fabrications at TWI.
 Welding Inspector: CSWIP 3.1 (Cert No:41949)
 Radiographic Interpretation-LEVEL II (CSWIP)

TRAINING COURSES
 Apprenticeship Certificate – Successful
 Completion of 2 years traineeship in Welding at Keppel Fels, Singapore.
 Association of Singapore Marine Industries.
 Jotun Paint School, Singapore
 The Saint Ambulance Association, Singapore
 Successful completion of the Crane
 Rigger Marine Signalman Course, Singapore
 Marine Signaling and Rigging Pass holder, Singapore
 NTUC Computer Training Centre. Singapore

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 1 of 13
EMPLOYMENT HISTORY

Date : Oct 2017 – Present


Project Name : EPCC Anjung Gas Development project (Jacket & Topside)
Client : PETRONAS
Place of : Fab.Yard: Brooke Dockyard, Kuching, Sarawak.
work : Structural & Mechanical & Piping Inspector- Client Representative
Position

Description of activities, responsibilities, main interfaces:


 Carried out of Materials Receiving Inspection (MRIR) to make sure all the
particulars materials that was received is meet the company requirement
without any defect or any indication appear on the raw materials.
 Carried out of Materials Verification (MVR) activities prior welding to make
sure all materials were cut as mentioned on the IFC drawing. To make sure all
of materials tractability was transferred correctly to the particulars items that
are supposed to assemble or welding.
 Witnessing and monitoring of Dimensional survey activity before and after
welding such as straightness, verticality and flatness of structural items.
 A reviewed Dimensional survey report to ensure all of final reports and
dimensional figure is within tolerance as mentioned in the IFC drawing.
 Carried out surveillance to routine such as welding Interpass, joint fit-up preparation
by inspect on the joints HI-LO, bevel preparation to meet company requirement.
 Monitoring of welding activities to ensure all of welding process to be proceed
as mentioned in the company approved WPS.
 Reviewed and signed off all of reports related to the project such as Fit-up
and Visual reports.
 To check and refer to an approved drawing during carry out of fit-up inspection to
make sure any weld longseam orientation is correct prior welding and including
 Witnessing of Welder Qualification Test by GTW, SMAW & SAW welding process in 6G,
6GR & 2G position.
 Preparing of QAQC Daily Surveillance Report and submit to my superior.
 Involved in ITR-B (Precom) activities.
 Witnessing FAT for Closed Drain Vessel at Vendor facilities.
 Witnessing of Crane SAT at yard facilities.
 Carried out visual receiving inspection on the equipment from vendor such as Diesel
Transfer pump, Wash water pump, Crane, Close Drain transfer pump and etc.
 Witnessing of HVAC Endurance test for 72 hrs.
 Witnessing during test run of Instrument Air Compressor
 Close up construction punchlist ITR-A prior pre-commissioning activities
 Witnessing pipe spools air blow, flushing and Hydrotest activities.
 Witnessing of welding activities on CRA (Cladding Riser pipe), Super Duplex Stainless
Steel, Stainless Steel and Carbon steel materials.
 Witnessing of Valve leak test prior installation work
 Involved in Precom activities to all of mechanical equipment’s
 Involved with piping linewalk activities prior to proceed to hydrotest
 To ensure all of equipment preserve properly to prevent for any dust to go in.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 2 of 13
Date : November 2016 – August 2017
Project Name : Bumga Pakma A Wellhead Riser Platform Topside & Jacket.
Client : Repsol Oil & Gas Malaysia Limited
Place of : Fab.Yard: OceanMight Sdn Bhd, Kuching, Sarawak.
work : Senior Structural Inspector & Piping - Client Representative
Position

Description of activities, responsibilities, main interfaces:


 Carried out of Materials Receiving Inspection (MRIR) to make sure all the particulars
materials that was received is meet the company requirement without any defect or
any indication appear on the raw materials.
 Carried out of Materials Verification (MVR) activities prior welding to make
sure all materials was cut as mentioned on the IFC drawing. To make sure all
of materials tractability was transferred correctly to the particulars items that
are supposed to assemble or welding.
 Witnessing and monitoring of Dimensional survey activity before and after welding
such as straightness, verticality and flatness of structural items.
 Reviewed Dimensional survey reports to ensure all of final reports and dimensional
figure are within tolerance as mentioned in the IFC drawing.
 Carried out surveillance to routine such as welding Interpass, joint fit-up preparation
by inspect on the joints HI-LO, bevel preparation to meet company requirement.
 Monitoring of welding activities to ensure all of welding process to be proceed
as mentioned in the company approved WPS.
 Reviewed and signed off all of reports related to the project such as Fit-up
and visual reports.
 To check and refer to an approved drawing during carry out of fit-up inspection to
make sure any weld longseam orientation is correct prior welding and including of
bevel angle preparation and make sure that area to be weld is free from
contaminations.
 Monitoring of welding activities including of preheating prior welding and by proper way to
conducted of preheating to make sure there is no localize preheating has been carried out.
 Reviewed and approve welding repair request from contractor before proceed for
any weld repair.
 Witnessing and monitoring of any materials fairing activity and ensure
contractor are using the correct way to carry out of fairing activity.
 Carried out fit-up, visual and monitoring of piping welding activities at workshop
and Topside area.
 Witnessing Valve Leak Test (Seat Test) prior installation.
 Witnessing of valve assemble activity to ensure valve has installed in correct location
and direction as mentioned in approved drawing.
 To witness valve gasket installation work to ensure the correct type of gasket to nstall
and correct torque value has applied during bolt tensioning process.
 Witnessing and monitoring of PWHT, reviewed of PWHT chart recorder.
 Involve in piping line walk and punch list clearance activities prior proceed to Hydro
test.
 Witnessing water flushing pipe spools prior hydro test take place.
 Involve in Reinstatement Test activities and monitoring & witnessing during holding
pressure.
 Review and signed off Hydro test chart.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 3 of 13
Date : February - October 2016
Project Name : KNDP-A HOST TIE-IN project
Client : Repsol Oil & Gas Malaysia Limited
Position : QA/QC Inspector - Client Representative

Description of activities, responsibilities, main interfaces:


 Review all of Shutdown and Post Shutdown Job Card from contractor.
 Review and compiled all of reports related to the project such as Fit-up, Visual,
NDT Painting and HT reports.
 Witnessing of Stairway Landing platform Levelling and Straightness before and
after welding.
 Monitoring piping fabrication and welding activity at fabrication shop.
 Carried out surveillance to routine such as welding Interpass, joint fit-up and
witness /reviewed NDT results.
 Monitoring and carry out of inspection on blasting & painting activity by inspect
on the surface preparation after blasting prior to apply the first coat paint.
 To check the paint expiry date before proceed for any painting activity.
 Witnessing Hydrotesting and Reinstatement test after Shutdown period.
 Monitoring on Valve installation activity to ensure there is correct orientation
 Close-up punch list and sign off Inspection Test Report (ITR-A)
 Conducted systems Linewalk prior Handover to Operation.

Date : June – September 2015


Project Name :
 MAHARAJA LELA SOUTH (MLS)-Brunei Offshore
 MLJ1 & MLJ3 Pipe Laying project
 Materials: 18” X 11.2mm + 3mm 316L CLAD
 18” X 14.3mm + 3mm 316L CLAD
 Jacket & Topside Installation for MLJ 3
 Welding Contractor: SERIMAX- For S-Lay
Client : TOTAL E & P BORNEO B.V
Position : QA / QC Inspector

Description of activities, responsibilities, main interfaces:


 Carried out surveillance during laying pipeline welding activity
 Witnessing of Camera Visual inspection after root and hot pass (CRA) welding
 Preparing of weld repair visual report and witnessing NDT such as MPI prior weld repair.
 Carried out visual inspection after welding.
 Monitoring and ensure all of tools used for machining and welding is comply to CRA
pipe procedure to prevent from any contamination take place on 316L CLAD area.
 Carried out visual inspection after bevelling such as root face, half opening grove.
 Carried out fit-up inspection and ensure all the of pipe weld seam in correct location
 Monitoring of electrodes /consumable storage to ensure there has meet client
requirement.
 Witnessing of pipe lay fit-up activity and check the pipe HI-LO after fit-up
 Marked and record of any repaired joint /area and make sure all weld repair to
be proceed according to approved WPS.
 Carried out fit-up inspection prior welding on Jacket Pile to ensure the pile weld
Seam allocate at correct orientation.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 4 of 13
 Note down of welding parameters during welding such as travel speed, Amperage,
Volt and calculate Heat Input to ensure that welding work to be proceed according
to approved WPS.
 Check the Jacket pile long seam orientation prior welding.
 Carried out fit-up inspection prior welding of Deck Leg to Jacket Pile
 Carried out visual and monitoring of NDT inspection of Deck Leg to Jacket Pile.
 Monitoring of Boatlanding installation and welding activity.

Date : Feb-May 2015


Project Name : PETRONAS TRAIN 9 PROJECT, Bintulu, Malaysia.LNG
Position : QA / QC Inspector

 Carried out surveillance during welding


 Monitoring of electrodes storage to ensure there is meet client requirement.
 Carried out fit-up inspection prior welding and visual inspection.
 Prepared fit-up and visual report.
 Witnessing Hydrotest and carried out line check prior Hydrotest
 Witnessing NDE activities such as PMI, PT, MT, TOFD and Hardness Test
 Review Hydrotest package prior Hydrotest
 Review RT film
 Check pipe spool fit-up orientation prior to welding
 Review Post Weld Heat Treatment chart report.
 Witnessing of spools cleaning and flanges cleaning prior spools erection.

Date : July ~ September 2014


Project Name : PTTEP Bongkot Long Term Contract (Thailand) Barge KUROSHIO II (K2) (PLEM,
Jacket & Topside Installation)
Client : Nippon Steel and Sumikin Engineering Co. Ltd
Position : Welding Inspector

 Witnessing of Dimensional, Levelling and Straightness check on Tie-In Spools


before and after welding.
 Monitoring welding of PLEM Tie-In spools joints.
 Carried out surveillance during welding
 Monitoring of electrodes storage to ensure there is meet client requirement.
 Carried out fit-up inspection prior welding on Jacket Pile to ensure the pile weld
Seam in correct orientation.
 Note down of welding parameters during welding such as travel speed,
Amperage Volt and calculate the heat input.
 Monitoring and witnessing of Riser Tie-In activity and record the welding parameter
 Carried out fit-up and visual after completed of welding activity.
 Check the Jacket pile long seam orientation prior welding.
 Carried our visual inspection after welding work on spools and Jacket Pile joints

Date : September 2012 - April 2014


Country : Malaysia

 SA-AA & SA-PA Jacket Leg (Sub-Structure) and Bridge.


 SA-AA & SA-PA Topside Fabrication & Hook-Up and Commissioning.
 SE-PA Gas Production Platform Tie-In project.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 5 of 13
Client : Murphy Sarawak Oil Co. Ltd (Brooke Dockyard, Kuching, Sarawak)
Place of work :
Position : QA/QC Client Representative (General Inspector)

 Carried out Material Receiving Inspection.


 Witnessing of MVR activity before proceed for any mark and cut work.
 Witnessing WQT for the new welders.
 Witnessing of Dimensional, Levelling and Straightness check on Jacket Leg structure
before and after welding.
 Monitoring piping fabrication and welding activity at fabrication shop.
 Carried out surveillance to routine such as welding Interpass, joint fit-up and
witness /reviewed NDT results.
 Monitoring and carry out of inspection on blasting & painting activity by inspect on
the surface preparation after blasting prior to apply the first coat paint.
 To check the paint expiry date before proceed for any painting activity.
 Witnessing of Riser joint HSS coating activities.
 Witnessing of Holiday Test on HSS coating area on Riser weld joint.
 Witnessing HSS coating pull-off Test
 Monitoring and witnessing during applying the 3 coat systems for painting procedure
 Witnessing holiday test and dolly pull off test on the painted test plate
 Witnessing Hydrotesting and Reinstatement test
 Prepare QA/QC Daily report and Weekly report.
 Monitoring on Valve installation activity to ensure there is correct orientation
 Close-up punch list and sign off Inspection Test Report (ITR)
 Monitoring on Post Weld Heat Treatment activity by monitoring on the chart
 Recorder on the Heating Rate, Socking Time and cooling rate as mentioned in WPS.
 Conducted systems Linewalk prior Handover to Operation.
 Closely monitoring and update on the Punchlist killing status for all discipline.

Date : April - August 2012


Project Name : SOUTH ACIS (SA-PA Well Head Template)
Client : Murphy Sarawak Oil Co. Ltd (Brooke Dockyard, Kuching, Sarawak
Position : QA/QC Client Representative

 Carried out of inspection activity after blasting and painting.


 Monitoring of welding and fabrication work activity.
 To check the welding consumable, witnessing straightness check before and after
welding to ensure that are meet the company requirement.
 Carried out daily surveillances check on site to ensure the activity has done as
per company requirement during to proceed of any fabrication work.
 Witnessing of Dimensional, Levelness and straightness before and after welding.
 Witnessing of weighing activity before proceed for loadout and sea fastening

Date : February 2012


Project Name : EPCIC of MERAPUH- A Production Topsides Facilities
Client : Murphy Sarawak Oil Co. Ltd (Brooke Dockyard, Kuching, Sarawak)
Position : QA/QC Client Representative
Description of activities, responsibilities, main interfaces:

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 6 of 13
Date :
Country :
Project Name :
Client :
Place of work :
Position :
Description of activities, responsibilities, main interfaces:
 Monitoring and witnessing of blasting and painting activities on the Production and
Test Header Valve Body.
 Carried out piping line check before proceed for Hydro testing activity.
 Monitoring of Phase Array UT activity on production flow line.
 Carried out of inspection activity after blasting and painting.
 Reviewed the Hardness Test report.
 Reviewed PWHT report.
 Monitoring of welding and fabrication work activity.
 To check the welding consumable, witnessing straightness check before and after
welding of piping joint to ensure that are meet the company requirement.
 Witnessing of Valve Leak Test.
 Witnessing flushing activity before proceed for Hydro test work.
 Witnessing of Valve assemble activity on piping systems.

Date : July 2011


Project Name : HUC-UP & Commissioning of additional Gas Well facilities at GOLOK-PA
& GOLOK PB Gas Production Platform.
Company : Murphy Sarawak Oil Co. Ltd (Bintulu)
Position : QA/QC Client Representative

 Monitoring of welding activity on deck panel structure and piping activity.


 Review all of NDT report from contractor.
 Monitored contractor’s QC inspector to carried out daily inspection activity
 Witness and monitoring weld repair procedure included first and second repair.
 Carried out verification against checklist to the welding equipment
 To check consumable, bevelling machine before welding
 To monitoring contractors daily progress
 Carried out surveillance to blasting and painting yards to ensure their complied to
company requirement.
 Monitoring offshore hot work activity
 Monitoring piping fabrication and welding activity at fabrication shop.
 Review Post Weld Heat Treatment chart to ensure that are complied with
company requirement.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 7 of 13
Date : Feb- April 2011
Country :

Client : Sabah Shell Petroleum Co.


Ltd
Position : QC Inspector

 Monitoring and witnessing pipeline S-Lay, J-lay & Multi-Jointing WPQR &
 WQT at Serimax workshop in Johor Port.
 Witness of Fatigue test procedure for J-Lay & Multi-Jointing activities.
 Monitored contractor’s QC inspector to carried out daily inspection activity during
welding of WPQR and WQT.
 Witness fatigue test on collar to pipes at Low, Medium and High Stress level.
 Witness and monitoring weld repair procedure included first and second repair.
 Carried out verification against checklist to the welding equipment
 To check consumable, bevelling machine before welding
 Machine set-up, etc by ensuring items are calibrated and compliance to Specification
and working order.
 Carried out surveillance to routine such as welding Interpass, joint fit-up
and witness/review NDT results.

Date : Jan-Feb 2010


Client : Sarawak Shell Berhad & Sabah Shell Petroleum Co.
Ltd
Place of work : Sarawak and Sabah water.
Position : QA/QC Inspector (Piping & Structural)

 Provision of Hook Up, Commissioning and Major Maintenance Service.


 Sarawak Shell Berhad (F23 VLAP Compression Module Project KA, PA, DPA)
 ST Joseph Re-Development Project at SJJT-G, SJP-A & SJK-A platform.
 South Furious - Crude Oil Transfer Pump Replacement (COTP
 TMM Piping, Structural, Vessel & TIR- Biocide Injection
 ST Joseph Re-Development Project at SJJT-H & G for Water Injection systems.
 Involved with Living Quarters (LQ) and Topside Installation activities

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 8 of 13
Description of activities, responsibilities, main interfaces:
 Prepare documentations such as weld summary and inspection report.
 Witnessing of piping Hydrotest and preparing a report.
 Monitoring closely daily welding activities of Structural and Piping
 Mark the red line marking on any of modification line of spool during on site
fabrication activity.
 Carry out daily inspection activities of pipe line / spool weld joint and update onto
the piping drawing for completed joint.
 Monitoring of welding parameter during welding and consumable control.
 Follow up closely any NDT activities for completed weld joint.
 Prepare weekly report and welder performance report for client to verify and sign.
 To ensure all of testing equipment certificate is valid.
 Review WPS and PQR.
 Identify requirement for NDT i.e RT, UT, MT and PT to verify the integrity of weld joint
per ISO Drawing.
 Involved with fabrication of Water Injection System and inspection activities.
 Involved with the new Living Quarters (LQ) and Topside Installation.

Date : Jan 2006 to Jan 2010


Country :
Project Name :
Place of work :
Position : QC Inspector / Welding
Client :
 Diamond Offshore, ENSCO, Sarawak Shell, Brunei Shell,
 Petronas Carigali, Exxon Mobil, Aramco, Total, Ras Gas Qatar, Adco, Petronas
Carigali, Exxon Mobil, Aramco, Total, Ras Gas Qatar, Adco,
 Transocean, ENI India, Chevron, KNOC, Woodside Australia & BP.

Description of activities, responsibilities, main interfaces:


 Involved in inspection activity before, during and after welding on
 Drilling & Production component parts.
 Involved with X’mass Tree testing activities
 Products: Wellhead Housing, Sub-Sea Tree & Christmas Tree, Surface Wellhead,
 Diverter Support Housing, Running Tools, Flexible Riser & Connectors,
 Booster line and chock & kill line of Risers, H4 Lower Body

Date : August 2009


Country :
Project Name : Witnessed WPQR and WQT test of Exxon Mobil Tuna Project.
Description of activities, responsibilities, main interfaces:
 Noted down welding parameter, prepared of materials & consumables cert for Third
Party to review before welding.
 Witnessing of welding activities till completed.
 Review PWHT chart report and witnessing of NDT activities.
 Witnessing of P.M.I on weldment joint

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 9 of 13
Date : March 2009
Project : Involved with WPQR and WQT test for Kizomba Satellites Project.
Client : ESSO EXPLORATION ANGOLA

 Noted down welding parameter, preparing of materials & Consumable


Cert before proceed for welding activity.
 Witnessing of Mechanical testing at PTS Lab Singapore
 To check clad thickness of weldment after cladding.
 Witness and note down welding parameter of WPQR for GTAW process to weld 1Ni ¼
Mo ASTM A694 Forging (F60) to Super Duplex SS without PWHT, Comply with DNV OS
F101 & NORSOK M.601.
 Monitoring of Welding / Cladding activities by using Inconel wire as a filler metal.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 10 of 13
Date : March 2006-2010
Position : QC Inspector /Welding

 Check all incoming materials to ensure all of related doc’s such as Material
cert are in place prior pre-weld machining /open up as per approved
drawing.
 Carried dimensional check on completed opening bore prior NDT/Visual
and Cladding.
 Carried Final inspection after machining as per approved drawing on cladded area.
 Witnessing of final NDT and taken for final cladding thickness prior
sending for Blasting and painting and follow up by assembly work.
 Involved in X’mas Tree S.U.T (Single Unit Test) to ensure that particular part is free
from any leakage happening during testing of component body.
 Check for chard recorder calibration cert prior Hydrotest and make sure that
chard Recorder has been calibrated as per API 6A.
 Witness hydro / Gas (Water or Gas medium) test and review the chart.
 Witness Seat test to ensure no any leakage occur on valve seat area.
 Witness F.A.T (Factory Acceptance Test) to ensure no any failure during
testing and meet the client specification and requirement.
 E.F.A.T (Extended Factory Acceptance Test)-To ensure all the control system is fully
function.
 S.I.T (Site Integrity Test)
 Monitoring of welding /cladding activities to sure the process used complied to Vetco
Gray W.P.S to achieve a high quality of products.
 Monitoring / witnessing on NDT process.
 Carried out hardness test on the finished component after welding to ensure that
the hardness value is comply with our company requirement.
 Review Post Weld Heat Treatment Chart including Heating Temperature, Soaking time
and cooling rate.
 To carry out joint inspection with third party of tubular connector such as box or pin
end connector before / after welding.
 To check the housing joint alignment before welding.
 Prepare for traceability after completed of welding process.
 Witnessing of WQT
 Witnessing and note down parameters data of new WPQR process.
 Carry out of pre-shipment inspection to particular part before shipment.
 To ensure the correct use of consumables, handling and storage.
 Carry out final inspection to the completed welding parts / components
 Witnessing of WPQR Positive Materiel Identification (P.M.I) testing.
 Witness of load test and witnessing of MPI before and after load test.
 Carry out inspection activities at vendor facilities such as welding, fit-up and final
Inspection before the parts sent in to Vetcogray for final assembly.

Date : 16 Jan. 2006


Position : QC Technician and attached to Final Inspection section.

 Performed final inspection to all of items that are came from vendor and In-House
before sent out to assembly section.
 To make sure all of the parts have complied with Vetco Gray specification
and requirements.
 Carried out source inspection to company vendor facilities

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 11 of 13
Date : Year 2004
Project Name : (POONTOON) STARBOARD SIDE MSSAU-SEMISUBMERSIBLE ACCOMODATION
VESSEL
Company : KEPPEL FELS Singapore
Position : Welding QC

 Monitoring all welding activities


 Consumable control
 Arrange and control all NDE activities
 Monitoring all welding activities including before, during and after welding
 To ensure all welder are qualified to carry out welding process per approved WPS.
 Monitoring welding parameter during welding to ensure that are comply to approved
 Welding Procedure Specification.

Date : Year 2003


Company : KEPPEL FELS Singapore
Position : Welding Inspector

 Yani Barge (Indonesia Drilling Ship company)


Inspection area: Column Crane (Starboard, Forward and Port)
 OCEAN HERITAGE / OCEAN SOVERIGN Drilling Rig (Diamond
Offshore) Inspection area: Replacement of damaged bracing and
Fit-up the new Cord to Rack of the leg structure.
 ENSCO (Jack-up Rig)
Inspection area: Lower Guide, Jack-Case Foundation, Forward
Leg, Starboard Leg and Port Leg.
 ALPHA PLATFORM BP EXPLORATION (Shah Deniz) TPG 500.
Inspection area: Bottom plating, Moon Pool machinery deck , Electrical building and
sack store room.

Description of activities, responsibilities, main interfaces:


 Monitoring preheating before and during welding.
 Monitoring of welding activities and welding operator during welding.
 Perform visual inspection on completed weld joint
 Perform in process and final dimension check
 Prepare all of weld joint traceability and record down all the welding parameter
 Follow up NDT process per client requirement
 Monitoring and updating welding machine and electrode oven calibration records.
 Review Post Weld Heat Treatment chart by referring to heating, soaking and cooling rate
as mentioned in Welding Procedure Specification.
 To ensure all of welding activities carry out as per approved WPS.
 Monitoring welding process to ensure that comply to the approved WPS.

Date : Year 2002


Company : KEPPEL FELS Singapore
Position : Welding Inspector

 MOORED DRILLING SEMI-SUBMERSIBLE VESSEL /


MAERSK Inspection area: Drill floor area
 ATWOOD ACEANIC MOD V B-CLASS Jack-up Rig.
Inspection area: Jack case foundation component, Leg structure and Lower Guide Block.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 12 of 13
 ATLANTA OFFSHORE LTD (Drilling Rig)
Inspection area: Column panel structure.
 ENSCO 1 Jack up Rig (Barge On
Barge) Inspection area: All area
 OCEAN ROVER Drilling Rig / Diamond Offshore Company
Inspection area: Anchor Bolsters, Column Sponsor PC1, PC2, SC1,
SC2 Helideck and Mud House. (Semi-Submersible Drilling Rig)
 ENSCO 51 Jack up Rig (Repair)
 ENSCO 54 Jack up Rig (Repair)
Inspection area: Rack to Chock, Helideck structure & Landing deck
and Jack-up Rig Fixation System.

Description of activities, responsibilities, main interfaces:


 To carry out joint inspection before welding
 Monitoring of welding activities
 Perform visual inspection
 Perform in process and final dimension
 Prepare all of weld joint traceability and record down the welding parameter
 Follow up NDT process per client requirement
 Monitoring and updating welding machine and electrode oven calibration records.
 Review Post Weld Heat Treatment chart by referring to heating, soaking and cooling rate
as per welding procedure specification.
 To ensure all of welding activities carry out as per approved WPS.

Date : July 1998 ~ July 2001


Position : Welder Technician

 Welding Skill
SMAW
Qualified up to 6GR welding
position FCAW and MIG
Qualified up to 4G position
SAW
Qualified for 1G
Other experiences as a Welder Technician at Keppel FELS
Project &Customer: ENSCO, CHILE OFFSHORE LTD IND &
AZERBAIJAN Caspian Co. Ltd.
Welding area involved: Jack-up Rig cantilever, Lower guide structure, Drill
floor , Jack case foundation, Leg bracing structure and Spud Tanks area.

FO-INSP-CV-01 Rev. 2 Curriculum Vitae Leraryson Linggir anak Libu – March


2019 Page 13 of 13

You might also like