P23-Agi-Ar-A096 - Lift Pit Level Plan
P23-Agi-Ar-A096 - Lift Pit Level Plan
P23-Agi-Ar-A096 - Lift Pit Level Plan
90500
9000 9000 6000 7500 7500 6000 11000 6500 7500 7500 6500 6500
KEYPLAN
U
BUIL
DING
SET
BAC
K
9000
PO D
IUM
SE TB A
CK Q
N
T
NOTES:
CK
1. FOR GENERAL NOTES & LEGENDS REFER DRG. NO. G101 TO
9000
TB
G103.
SE
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED
UM
OTHERWISE.
DI
3. ALL LEVELS ARE IN METERS UNLESS NOTED OTHERWISE.
K
PO
AC
4. DRAWINGS NOT TO BE SCALED, ONLY WRITTEN DIMENSIONS
TB
TO BE FOLLOWED.
SE
5. ALL DRAWINGS TO BE READ IN CONJUNCTION WITH OTHER
G
RELEVANT DRAWINGS AND SPECIFICATIONS.
IN
ILD
6. ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF
S
BU
CONSULTANT PRIOR TO COMMENCEMENT OF WORK
7. All MEP EQUIPMENTS SHOWN IN ARCHITECTURE PLANS ARE
INDICATIVE . REFER MEP PACKAGE FOR FURTHER DETAILS &
REFERENCES.
9000
R
6000
Q
7000
PROMENADE
3300
LIFT PIT
WATER
FEATURE P
5400
TANK NL01 NL03
44
28
2300
2300
LIFT
25
LIFT
78
-11.675 FFL/SSL PIT PIT
-9.050 FFL/SSL
6000
3300 2856 3300
10256
LIFT PIT
3200
CORRIDOR
-12.300 FFL/SSL
N
2000
NL02 NL04
2300
LIFT
2300
LIFT
PIT
3300 2856
PIT
3300 M
5000
3150
VOID 1
A301
1
4 L
2770
VOID DN
3300
7000
-11.700 FFL/SSL
3355
NW-ST02
119000
UP
N-FL01
LIFT K
3300
PIT
3073
5000
5420
2500
2910
SL03
J
2600
LIFT
SL01 2320 2700
4500
3100 PIT
2300
LIFT
PIT
1250
5420
LIFT PIT
S-FL01
3000
H
3200
2500
CORRIDOR
LIFT
3300
-11.650 FFL/SSL
PIT
-10.900 FFL/SSL
SL02
1 G
2300
LIFT DN 5
2550
1 3100
PIT 5420
6500
A301 -10.900 FFL/SSL
UP
F
6240
4500
SW-ST02
2910
9000
D R0 WIP DRAWINGS 14/10/2024
PO
PURPOSE OF ISSUE
TB
9000
BU
AC
ILD
WIP DRAWINGS
K
IN
G
SE
TB
K
BAC
SET
AC
NG
ILDI
K
BU PROJECT
C VELA VIENTO
SET
BAC
K 2B + G + P + 41 STOREY + ROOF
IUM
PO D RETAIL / RESIDENTIAL TOWER
ON PLOT 3460761 BUSINESS BAY, DUBAI
9000
CLIENT
CREEK RESIDENCES 23
HOLDINGS LIMITED
B
INTERNATIONAL ARCHITECT
9000
Riverside, 22 Hester Road
London SW11 4AN
T +44(0)20 7738 0455
F +44(0)20 7738 1107
A www.fosterandpartners.com © Foster + Partners 2023
LEAD CONSULTANT
ARCHGROUP
ARCHITECTS.PLANNERS.ENGINEERS.PROJECT MANAGERS
DRAWING
11-Nov-24 4:37:42 PM
A302 A302 A301 DRAWN BY CHECKED BY DATE
ZBR UD 14/10/24
SCALE (@ A0) PROJECT NUMBER
As indicated AG-189
DRAWING NUMBER REV
P23-AGI-AR-A096 R0