Problem statement –whether, in the third-party process, the Purchase Requisition (PR) will be
created based on the Bill of Materials (BOM) once the sales order is generated.
Solution–
The sales order is created for single finished good.
After press one sub material will appear which has a different item category as compare to main
item.
The purchase requisition will not be created for the main material item.
Instead of main item system will create purchase requisition base on sub material.
Page 1 of 3
Solution Document
As shown in the screenshot below, the system has only copied the sub-line-item data from the sales
order to the purchase requisition. Subsequently, the purchase order has also been created with the
same material code.
The same behaviour is observed for MIGO and MIRO, where only sub-line-item data is being
processed.
As per the configuration, the billing document will be generated based on the main material.