Note Sheet Transformer

Uploaded by

chandrasuha568
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

Note Sheet Transformer

Uploaded by

chandrasuha568
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Ref. No.19lRINL/DGM {Projects)/FWPlGen/07 Date: 16.02.

2019

Sub: Approval for Repair of Failed 33/6.6KV,lOOO KVA power


transformer of FWP Construction site - Reg.

1. Contract for Constructior Power & Water of Forged Whecl plant


Projcct \\.as awzrrded to M/s Hi,Tech Competcnt Builders vidc:
Agreemcnt No: VSP/CONT lC 02 ctl 20\6 17, Datcd: 19.05.2016.
2. AS per thc Contract, thc agency has installed
& Commissioned Onc
1000KVA,33 / 6.6KV, Volt-Amp meil<e Power Trarsformcr on
06.O7 .2017. Vtrtual Completion Certificate was issued to thc agency
on 25.04.2018 wlth a Defect Liability period of One Year which mav
conclude on 24.O4.2019.(Copy Attached at CIL).
3. On 19.01.2019, whtle car,ying the excavation work by SMI cablc gor
cut and the above trans:brmer has failed due to non-operation 01'
protective relays of brelikers on bo1.h primary side as wcll as
secondarv side of the transformer. Brcak down report of the same is
attached at C/2.Farlure of the TreLnsformcr was informed to M/s I{i
Tech Competent Builders vide e mail dtd:20.Ol.20i9. (Copy Artached
at C/3). (ln continuous lollow up w.ith MD & Vp ol Competenr
I3uilders, M/s Hi Tech Compctent lluildcrs vidc Lheir c mail
dtd:1 1.02.2019 informcd that, rhey should nor be held rcsponsible lor
the things took place at slte and requested RINL to iake up with thc
manufacturer ior rectification. (Copy Attached at C/4)
1. To meet the construction activities a:rd not to suffer, the agencies at
FWP site were requested to get the work done by getting DG sets. As
on date thc work is going smoothly arrd not aifectcd. Howcvcr,
trlectrical pot".er is the most vi.tal to continue the pace of construction.
Hcnce it is proposed to gct it rcctificd through OFjM or an outsidc
repair agency.
). Since the trii-nsformer was duc to improper activity ol SMI
der,maged
and their sub contra,crcr, RINL requestcd to bcar the rcpair
expenditure by SMI.S-lyli ciid not agrcc the samc. (Copy Altachcd a1

c/s)

$<"rtr .. Cont. .
PagcJt2

6. RINL Obtained quotation lor repair of thc transformcr


lrom OtrM, M/s
Voltamp, As pcr thc euotation,thc estimatccl cost is llsS,Og,tr20/
(Rupees Five Lakh Eight l.housalrd ancl Six hundrcd
and twcnt,y only)
plus additional charges for any spare parts if rcquired which
tr.ilj bc:
decidecl after inspection as per S.No:2.5 of price scheduie
cxcluding
Tzr-xes & Duties and Transportation. M/s Voltamp
has informed that
thc rcpair of thc transformcr will rakc g 1O r.vccks aflt:r final
inspcclion at thcir fact,r' prcmiscs. H.uc'cr, finar cstimarc
b(l
'oiri
submitLcd bi, \4/s VoLtamp afier inspcction ol d:Lmzrgccl rr"rnsformcr
at their Facrory premises. (Copy Attached ar C/6)
'/. Mi:anr"r,hilc as a parallcl action. M/s .l.rans Elcc:tric:.rl
lnrjusLrics.
i-ucknou,. thc Traursformcr rcpair .1gcnu), \\ i:is ruqucstcd
to :LSScs the
extcnt of d:rmage .rnd lcasibility of repair o[ the samc ai, rhcir
workshop zLnd submit the report. The agcncy tesled thc .l.rarsformcr
at site and reported thal the transformer has failcd u,ith the rollo$,ing
obscrvations.
A) HT u,inding Failed.
B) LT Windlng not getting stabilized to rcst conditiorrs
C) HT srdt t"rnk Bulg,.d.
D) PliV uproorcd
E1 Oi1 gr-rshcd out from Vcnr pipc.
Also, thc agency has informcd that thc rcpair of thc rransiormer
rr,.irl
take 45 days :Lher final inspcction at their lacrory premiscs.
8. M/s 'l'rans Elcctrical Industries, Lucknou,submittcd a quolation .rt
an estimated cost of 4.0 Lakh (Rupees Four I.akh Only).(Copv
attached at l7).
C

9. Mecon, the consultant of FWp project viclc emarl dated: 14.02.20


19.
has recommended to get the ,l.ransformer rcpaircd by OtrM onlr,
{M/s Voltamp) for quality assurancc. {Cop-y Atr:rched at C/8)
l0.ln vicw ol thc abovc, it is proposcd to gct thc transformcr rcpaircd bv
M/s Voltamp, thc OIiM. lor euality assuranccj at an esrimatecl cost of
Rs5.08 lakhs (lRupecs Irivc l:Lkh trighr thousand onlv) approximarc:11.
r:xcludingTarcs & Dutics ancl .lran sportation.

Cont. ..

S$,r'*
Page #3

11. D&tr/TIrpCC may please allot


a budgct of Rs RsS.O8 lakhs (liupccs
Five lakh Eight thousand only) for
the rep.rir of the .l.ransformcr.
12'F&A may plcase concur thc proposar
at point No:Io of thc above for
thc kind approval of DD{prq ccts)/ Inchargc.
13.tr1)(l)ro.jcr:tsl/lnchargc'mai,kindll.arccord
approral for Rcpair o1. l0OO
I{VA, 33/6.6KV rransformcr oI FWp
rhrough OtrM \4/s Volramp,
Vadodara at an estimated cost
of RsS.Og Lzrkh (Approximate 11,)
excluding Ta-xes a:-rd Transportatlon

Submittcd please.

W'L)'t')
l(DGM(Projc:crs) / FWp)
?
(zi
GM(Proiectsl/power& FWp:
F t+A g^4 -r'--*0 l'lt c'tt (ct',1t,.-.-'.- K
/
\i prt-r dl F.,<t (o",:\t't t{v"r
i..-L
Y=-*r,\ f'* b
.,-.r, \( \ t' r.1.1' 1e -.
fi-'' c.\.
P&r,*...'- h'., r -^*. [, - u.' '
\

l'irt
a ^- r- D
N\t'-,."v-.'..,, .- ( {t-r D I itr-l
v
1.0 Note has been initiated for repairing of lOOO KVA, 33/6.6KV transformer of FWP, using for
construction power. As per consultant (Mecon) view, cut in underground HT cable done
by contractor M/s SMI during excavation, transformer might have been damaged because
of HT cable damage and short circuit
2.0 Further, the subject Equipment/ Package in DLP (Defect Liability Period) phase up to
24.04.2O1g, and M/s Hi-Tech Competent Builders P. Limited (the package contractor and
its supplier M/s VoltAMP transformers Limited) have refused to take responsibility of
transformer failure due to operation & Maintenance problem
3.0 Since, the supplier/ contractor and M/s SMI has refuse to bear the responsibility, note has
been initiated for repair of transformer on RIN L account, under DOP 5l no 21 (Works for
construction Maintenance) of contraction department (pa8e no 1.15 of DOP), to make
available the construction power which has been interrupted after failure of transformer
since 19.01.2019.
4.0 Following may be clarify by the concerned;
a. The company affairs Department of RINL had issue a separate DOP circular vide CA-
DOP /oo 12A:16-17 /16 dated 03 11 2016, on similar power delegation "To incur

expenditure on repairs, equipments and appliances" ln view of a separate DoP's for


FWP, issued time to time by Company Affairs Department, the applicability of
Construction Department DOP may kindly be ascertained from the company affairs
department and provide the relevant order before going further'
b. Proposal ls for repair through OEM (Original Equipment Manufacturer) with a
estimate cost of Rs 5.08 Lakhs excluding Taxes/ Transportation and transit insurance,
which is almost 27% above the second obtained quotation Rs 4,00 Lakhs, submitted by
non oEM M/s Trans Electrical lndustries, Lucknow Kindly confirm that the decision for
opting OEM had been done after following all RINL procedure in vague to go for OEM'
c. The cost of transportation and transit insurance, its agency and mode to execute'
d. Date & copy of in-principal approval by CA for going ahead
mitted Please.
Su b
.a?--y"1<rrtft
u"itroffit \td +qri
n