1.0 Note has been initiated for repairing of lOOO KVA, 33/6.6KV transformer of FWP, using for
construction power. As per consultant (Mecon) view, cut in underground HT cable done
by contractor M/s SMI during excavation, transformer might have been damaged because
of HT cable damage and short circuit
2.0 Further, the subject Equipment/ Package in DLP (Defect Liability Period) phase up to
24.04.2O1g, and M/s Hi-Tech Competent Builders P. Limited (the package contractor and
its supplier M/s VoltAMP transformers Limited) have refused to take responsibility of
transformer failure due to operation & Maintenance problem
3.0 Since, the supplier/ contractor and M/s SMI has refuse to bear the responsibility, note has
been initiated for repair of transformer on RIN L account, under DOP 5l no 21 (Works for
construction Maintenance) of contraction department (pa8e no 1.15 of DOP), to make
available the construction power which has been interrupted after failure of transformer
since 19.01.2019.
4.0 Following may be clarify by the concerned;
a. The company affairs Department of RINL had issue a separate DOP circular vide CA-
DOP /oo 12A:16-17 /16 dated 03 11 2016, on similar power delegation "To incur